AICTE - рдиреЙрд░реНрде рдИрд╕реНрдЯрд░реНрди рд░реАрдЬрди рдореЗрдВ рдмреБрдирд┐рдпрд╛рджреА рдврд╛рдВрдЪреЛрдВ рдХреЛ рдмрдврд╝рд╛рдиреЗ рдХреЗ рд▓рд┐рдП рдЕрдиреБрджрд╛рди

The scheme "AICTE - Grant for Augmenting Infrastructure in North Eastern Region (GAINER)" was introduced by AICTE to enhance the functional efficiency of the technical institutes l...

рдореБрдЦреНрдп рдЬрд╛рдирдХрд╛рд░реА

рд▓рд╛рдн

The selected institutes will have to complete the sanctioned project as per the following guidelines:

**Project Name:** Solving Water Problems Project

**Limit of Funding:** тВ╣ 15,00,000

**Duration of Project:** 2 years from the date of receipt of the first installment.

**Project Name:** Power/ Solar Energy Project

**Limit of Funding:** тВ╣ 20,00,000

**Duration of Project:** 6 months from the date of receipt of the fund for the purpose.

**Project Name:** Internet Connection Project

**Limit of Funding:** тВ╣ 5,00,000

**Duration of Project:** 6 months from the date of receipt of the fund for the purpose.

**Disbursement of the Funds**

The **first installment** is an advance of 80% of the sanctioned grant.

The **second installment** is reimbursement on successful completion of the project and submission of requisite documents by the institute.

**Note:** If the project is not initiated within six months, the institute shall have to refund the complete grant with accrued interest to AICTE with justification.

рдкрд╛рддреНрд░рддрд╛ (рдХреМрди рд▓реЗ рд╕рдХрддрд╛ рд╣реИ)

рдЖрд╡реЗрджрди рдХреИрд╕реЗ рдХрд░реЗрдВ

  1. **Offline**
  2. **Step 1:** Download and fill out the application form for AICTE-Grant for Augmenting Infrastructure in North Eastern Region (GAINER).
  3. **Step 2:** Verify that every page of the application form has the signature and stamp of the Head of the Institute.
  4. **Step 3:** Attach all the essential documents along with the filled application form.
  5. **Step 4:** Kindly ensure all the information is correct and then sent the Application form along with all the essential documents through registered post/speed post to:
  6. Institutional Development Cell,
  7. All India Council for Technical Education,
  8. Nelson Mandela Marg, Vasant Kunj,

рдЕрдХреНрд╕рд░ рдкреВрдЫреЗ рдЬрд╛рдиреЗ рд╡рд╛рд▓реЗ рд╕рд╡рд╛рд▓

AICTE - рдиреЙрд░реНрде рдИрд╕реНрдЯрд░реНрди рд░реАрдЬрди рдореЗрдВ рдмреБрдирд┐рдпрд╛рджреА рдврд╛рдВрдЪреЛрдВ рдХреЛ рдмрдврд╝рд╛рдиреЗ рдХреЗ рд▓рд┐рдП рдЕрдиреБрджрд╛рди рдХреЗ рд▓рд┐рдП рдкрд╛рддреНрд░рддрд╛ рдХреНрдпрд╛ рд╣реИ / рдХреМрди рдЖрд╡реЗрджрди рдХрд░ рд╕рдХрддрд╛ рд╣реИ?

- a. Government/ Government-aided technical/ engineering colleges/University Departments including Polytechnic Institutes of North East are entitled to the grant. - b. The institute must be in existence for the last five years.

AICTE - рдиреЙрд░реНрде рдИрд╕реНрдЯрд░реНрди рд░реАрдЬрди рдореЗрдВ рдмреБрдирд┐рдпрд╛рджреА рдврд╛рдВрдЪреЛрдВ рдХреЛ рдмрдврд╝рд╛рдиреЗ рдХреЗ рд▓рд┐рдП рдЕрдиреБрджрд╛рди рдореЗрдВ рдХреНрдпрд╛ рд▓рд╛рдн рдорд┐рд▓рддрд╛ рд╣реИ?

The selected institutes will have to complete the sanctioned project as per the following guidelines: **Project Name:** Solving Water Problems Project **Limit of Funding:** тВ╣ 15,00,000 **Duration of Project:** 2 years from the date of receipt of the first installment. **Project Name:**...

AICTE - рдиреЙрд░реНрде рдИрд╕реНрдЯрд░реНрди рд░реАрдЬрди рдореЗрдВ рдмреБрдирд┐рдпрд╛рджреА рдврд╛рдВрдЪреЛрдВ рдХреЛ рдмрдврд╝рд╛рдиреЗ рдХреЗ рд▓рд┐рдП рдЕрдиреБрджрд╛рди рдХреЗ рд▓рд┐рдП рдСрдирд▓рд╛рдЗрди рдЖрд╡реЗрджрди рдХреИрд╕реЗ рдХрд░реЗрдВ?

**Offline** **Step 1:** Download and fill out the application form for AICTE-Grant for Augmenting Infrastructure in North Eastern Region (GAINER). **Step 2:** Verify that every page of the application form has the signature and stamp of the Head of the Institute. **Step 3:** Attach all the...

рдорд┐рд▓рддреА-рдЬреБрд▓рддреА рдпреЛрдЬрдирд╛рдПрдБ

рдЖрдзрд┐рдХрд╛рд░рд┐рдХ рд╡реЗрдмрд╕рд╛рдЗрдЯ рдкрд░ рдЬрд╛рдПрдБ

рдЖрдЦрд╝рд┐рд░реА рдЕрдкрдбреЗрдЯ: 02 Jul 2026