Time & work

Commercial Maths · free study notes

Time & Work – Quick & Easy Study Notes

What we’ll learn

  • How “work” is measured.
  • How to use rates (speed of work).
  • How to combine workers or machines.
  • Simple steps to solve the most common “time & work” questions.

1. The Basics

Term Everyday Analogy What it Means Formula
Work (W) Finishing a house Total amount of job to be done –
Rate (R) Speed of a runner How fast work can be done per unit time R = W / T
Time (T) How long the runner runs Hours, days, minutes, etc. T = W / R

Think of it like this:
If we have a cake (work) and a baker (rate), the time is how long it takes the baker to finish the cake.


2. One Person (or Machine) Working Alone

  1. Given: Rate (e.g., 2 units/hour).
  2. Want: Time to finish W units.
  3. Use: T = W / R.

Tiny Example

  • A machine can paint 5 m² per hour.
  • Painting a wall of 20 m².
  • T = 20 / 5 = 4 hours → the wall is finished in 4 hours.

3. Two (or More) People Working Together

  • Rates add up.
    • If A paints 3 m²/hour and B paints 2 m²/hour, together they paint 3 + 2 = 5 m²/hour.

Step‑by‑Step

  1. Find each person’s rate.
  2. Add the rates → combined rate R_total.
  3. Use the single‑person formula with R_total.

Tiny Example

  • A can finish a job in 10 hours → rate = 1 job / 10 hr = 0.1 job/hr.
  • B can finish the same job in 15 hours → rate = 0.0667 job/hr.
  • Together: 0.1 + 0.0667 = 0.1667 job/hr.
  • Time for both together: T = 1 / 0.1667 ≈ 6 hours.

4. One Person Leaves/Stops Early

  • Work done before leaving = Rate × Time.
  • Remaining work = Total – Work done.
  • Time for the remaining work = Remaining / Rate of the other person.

Tiny Example

  • A works 4 hours on a job that takes 10 hours alone → does 4/10 = 0.4 of the job.
  • Remaining 1 – 0.4 = 0.6 of the job.
  • B alone will finish it in 10 × 0.6 = 6 hours.

5. One Person’s Rate Changes (e.g., Gets Faster)

  • Calculate the new rate first.
  • Then treat it as a new single‑person problem.

Tiny Example

  • A usually paints 1 m² in 2 hours → rate = 0.5 m²/hr.
  • After training, he can paint 1 m² in 1 hour → new rate 1 m²/hr.
  • For a 10 m² wall, time = 10 / 1 = 10 hours → much faster!

6. Mixed Work (Different Tasks)

If the job consists of several parts (e.g., painting, wiring, plumbing), treat each part separately:

  1. Find the time each person needs for each part.
  2. Add the times if they work sequentially.
  3. If they work simultaneously, use combined rates for each part.

7. Quick Checklist for Solving

Step What to Do
1 Identify all rates or times given.
2 Convert everything to the same unit (hours, minutes).
3 If rates are given as “time to finish whole job”, compute rate = 1 / time.
4 Add rates for people/machines working together.
5 Use T = W / R for the final answer.
6 Check if the answer makes sense (e.g., not negative, reasonable size).

8. Practice Problems (Try One)

  1. Problem

    • A can finish a task in 12 hours.
    • B can finish the same task in 18 hours.
    • How long will they take together?
  2. Problem

    • A works alone for 3 hours on a task that takes 10 hours alone.
    • B works alone for 4 hours afterward.
    • How long did B take to finish the remaining part?

Answer them using the steps above!


9. Common Mistakes to Avoid

  • Mixing units (hours vs minutes).
  • Adding times instead of rates when people work together.
  • Forgetting to convert “time to finish whole job” into a rate.
  • Assuming work is always linear; it’s usually linear in these problems.

10. Takeaway

  • Work = Rate × Time.
  • Rates add when people/machines work together.
  • Just plug numbers into the simple formulas, use clear units, and you’ll solve any time‑and‑work question.

Happy practicing!