Time & Work – Study Notes (TOEFL‑style Quantitative Aptitude)
Why this topic?
Time & Work problems test your ability to translate everyday statements into algebraic equations, manage units, and think about rates and ratios. These skills are transferable to many competitive exams (IIT‑JEE, JEE‑Main, GRE, GMAT, etc.).
What you’ll learn today
- Core formulas and derivations
- Step‑by‑step problem‑solving strategy
- Common pitfalls and “tricky” traps
- A hard practice problem with full solution
1. Fundamentals
| Concept | Symbol | Description |
|---|---|---|
| Work | (W) | Quantity of job completed (often expressed in “person‑units”). |
| Time | (t) | Duration taken (hours, days, …). |
| Rate | (r) | Work done per unit time: ( r = \frac{W}{t}) Units: work per hour (or per day, per minute, etc.). |
| Person‑Unit | 1 person works for 1 hour | Equivalent to a unit of work. |
1.1. Basic Relationship
[ W = r \times t \quad \Longleftrightarrow \quad r = \frac{W}{t} ]
If a person can finish a job in (T) hours, his/her rate is (r = \frac{1}{T}) work‑units per hour.
2. Working with Multiple Workers
When (n) workers work together at constant individual rates, the combined rate is the sum of individual rates.
[ r_{\text{total}} = \sum_{i=1}^{n} r_i ]
Derivation (Two workers, A and B)
- A’s rate: (r_A = \frac{1}{T_A})
- B’s rate: (r_B = \frac{1}{T_B})
- Together: (r_{\text{total}} = r_A + r_B = \frac{1}{T_A} + \frac{1}{T_B})
- Time to finish a single job: (T_{\text{both}} = \frac{1}{r_{\text{total}}})
3. Work‑Time Inverse Relationship
Essential rule – If a worker’s time to finish a job doubles, his/her rate halves.
(T \propto \frac{1}{r})
This inverse proportionality is the backbone of many “tricky” questions.
4. Common Problem Types
| Type | Typical Question | Key Formula |
|---|---|---|
| Single worker | “A finishes a job in 10 days.” | (r = \frac{1}{10}) |
| Two workers | “A finishes in 12 days, B in 18 days; how long together?” | (\frac{1}{T} = \frac{1}{12} + \frac{1}{18}) |
| Adding/removing workers | “If C joins, time reduces to 6 days.” | (\frac{1}{6} = \frac{1}{12} + \frac{1}{18} + r_C) |
| Changing rates | “B’s rate increases by 20%.” | (r_B' = 1.2,r_B) |
| Work completed before rest | “A works 5 hours, B 3 hours, then both rest 2 hours.” | Sum of work before rest + rest has no effect on work. |
5. Step‑by‑Step Strategy
-
Identify knowns & unknowns
- Who is working?
- How many hours/days?
- What is the job size? (Often 1 job = 1 work‑unit)
-
Compute individual rates
[ r_i = \frac{1}{\text{time taken by }i} ] -
Add rates for simultaneous work
[ r_{\text{total}} = \sum r_i ] -
Solve for required quantity
- Time: (T = \frac{1}{r_{\text{total}}})
- Work: (W = r_{\text{total}}\times T)
-
Check units
- Convert days to hours if needed: (1 \text{ day} = 24\text{ hr})
-
Verify answer by back‑substitution
- Multiply rate by time to ensure total work = job size.
6. Tricky Points & Common Pitfalls
| Pitfall | Why it occurs | How to avoid |
|---|---|---|
| Mixing units | Mixing days & hours without conversion | Convert all times to a common unit first |
| Assuming linearity | Believing adding a worker always halves time | Check the combined rate, not just doubling effort |
| Neglecting rest or idle time | Rest time does not affect work done | Only consider productive hours |
| Using “work completed” incorrectly | Mistaking “completed 30% of job” as “30% of time” | Work completed = rate × time, not time × percentage |
| Wrong addition of rates | Adding times instead of rates | Remember rates add, times add inversely |
7. Derivation of the “Combined Work” Formula
Given workers A and B with times (T_A) and (T_B) to finish a single job:
-
Individual rates
[ r_A = \frac{1}{T_A}, \quad r_B = \frac{1}{T_B} ] -
Total rate
[ r_{\text{total}} = r_A + r_B = \frac{1}{T_A} + \frac{1}{T_B} ] -
Time together
[ T_{\text{both}} = \frac{1}{r_{\text{total}}} = \frac{1}{\frac{1}{T_A} + \frac{1}{T_B}} ] Simplify by finding a common denominator: [ T_{\text{both}} = \frac{T_A T_B}{T_A +