Time & Work – Advanced Study Notes
(MIT‑Level – Quantitative Aptitude, MCAT)
1. Introduction
The time & work module models rate processes where two or more agents (workers, machines, processes) perform a fixed job. The underlying mathematics is linear (or piecewise linear) and draws heavily on rates, proportions, and linear equations. Mastery of this topic equips you with tools for:
- Solving rate‑based word problems
- Understanding compound rates (parallel, sequential, and alternating)
- Modeling edge cases (zero‑rate, negative rates, overlapping work, etc.)
2. Fundamental Concepts
| Symbol | Meaning | Units | Example |
|---|---|---|---|
| (W) | Total work (job) | units | 1 full job |
| (r) | Rate of a worker/machine | units/time | 0.2 job/hr |
| (t) | Time | time | 5 hr |
| (n) | Number of workers | dimensionless | 3 workers |
| (k) | Coefficient in linear relation (W = k t) | units/time | 0.5 job/hr |
2.1 Rate and Work Relationship
For a single worker:
[ W = r , t \quad\Longleftrightarrow\quad t = \frac{W}{r} ]
For (n) identical workers:
[ W = n r t \quad\Longleftrightarrow\quad t = \frac{W}{n r} ]
Proof (First Principles)
Assume a worker’s rate (r) is constant over time. By definition, in an infinitesimal interval (\mathrm{d}t), the worker completes (r,\mathrm{d}t) units. Integrating from (0) to (t):
[ W = \int_0^{t} r,\mathrm{d}t = r t. ]
2.2 Adding Rates (Parallel Work)
If workers A and B work simultaneously, their combined rate is the sum:
[ r_{\text{total}} = r_A + r_B. ]
This follows from linearity:
[ W = (r_A + r_B),t \quad\Longleftrightarrow\quad t = \frac{W}{r_A + r_B}. ]
2.3 Alternating Work (Sequential/Interleaved)
When workers alternate, let (p) be the fraction of the job done in one cycle. For a cycle of length (c):
[ \text{Work per cycle} = r_A p_A c + r_B p_B c, ] with (p_A + p_B = 1). The time for the whole job is:
[ t = \frac{W}{\text{Work per cycle}/c} = \frac{W , c}{r_A p_A c + r_B p_B c}. ]
3. Edge Cases & Advanced Topics
| Edge Case | Condition | Key Insight |
|---|---|---|
| Zero‑rate worker | (r = 0) | Worker contributes nothing; ignore. |
| Negative rate | (r < 0) | Unphysical in standard work problems; indicates removal or sabotage. |
| Infinite rate | (r \to \infty) | Worker can finish instantly; time tends to zero. |
| Non‑linear rates | (r(t)) varies | Integrate (r(t)) over (t). |
| Capacity constraints | Only a fixed number of workers can be used simultaneously | Introduce combinatorial constraints. |
| Stochastic rates | Rates fluctuate randomly | Use expected value; linearity of expectation. |
4. Deep Theory: Rate Processes in Continuous Time
Let (r(t)) be the instantaneous rate of a worker at time (t). The total work done up to time (T) is:
[ W(T) = \int_0^T r(t), \mathrm{d}t. ]
If two workers have rates (r_1(t)) and (r_2(t)), the combined rate is (r_1(t)+r_2(t)) due to additivity. This framework generalizes to systems of workers and time‑dependent efficiencies.
Example: Worker A works at (0.3) job/hr for the first 2 hr, then slows to (0.2) job/hr.
Work done:
[ W = \int_0^2 0.3, \mathrm{d}t + \int_2^{T} 0.2, \mathrm{d}t. ]
5. Challenging Problem (for MCAT)
Problem Statement
Three machines A, B and C work on a batch of textile fabric.
- Machine A can finish the job alone in 12 days.
- Machine B can finish the same job alone in 18 days.
- Machine C is a repair machine that, when activated, reduces the effective rate of any other machine by 10% (i.e., multiplies its rate by 0.9).
The three machines are scheduled as follows:
- Machine A runs alone for the first 3 days.
- Then Machine A and B run together for 5 days.
- Finally, all three run together for the remaining time until the job is completed.
Question: How many days does the entire job take?
Solution Outline
-
Compute individual rates
[ r_A = \frac{1}{12}, \text{job/day},; r_B = \frac{1}{18}, \text{job/day}. ] -
Phase 1 (Days 0–3)
Work done: (W_1 = r_A \times 3 = \frac{3}{12} = \frac{1}{4}). -
Phase 2 (Days 3–8)
Combined rate without C: (r_{AB} = r_A + r_B = \frac{1}{12} + \frac{1}{18} = \frac{5}{36}).
Work done: (W_2 = r_{AB} \times 5 = \frac{25}{36}). -
Remaining work
[ W_{\text{rem}} = 1 - (W_1 + W_2) = 1 - \left(\frac{1}{4} + \frac{25}{36}\right)