Madhya Pradesh Police Constable /Quantitative Aptitude

Time & work

Commercial Maths · free study notes · Updated

Time & Work – Study Notes

(Madhya Pradesh Police Constable – Quantitative Aptitude)


📌 Simple Explanation

Time & work problems ask you to find out how long it takes for workers (people, machines, etc.) to complete a job, or how much work is done in a given time.

  • Rate of work = Work done per unit time.
  • Work = Total amount of job needed to be finished (often measured in “man‑days” or “units”).
  • Time = Duration needed to finish the job.

When two or more workers collaborate, their rates add up.
When a worker stops for a period (break, rest, etc.) the effective working time is reduced.


📚 Key Points & Formulas

Concept Symbol Formula Notes
Rate of work ( R ) ( R = \frac{W}{T} ) (W)=total work, (T)=time taken
Work done ( W ) ( W = R \times T )
Time required ( T ) ( T = \frac{W}{R} )
Combined rate (two workers) ( R_{\text{total}} ) ( R_{\text{total}} = R_1 + R_2 )
Time with rest ( T_{\text{effective}} ) ( T_{\text{effective}} = \frac{T_{\text{actual}}}{\text{Working fraction}} ) e.g., 80 % working → ( T_{\text{effective}} = \frac{T_{\text{actual}}}{0.8} )
Proportion method – ( \frac{W_1}{R_1} = \frac{W_2}{R_2} ) Use when work is split among workers working at different rates
Work‑Rate Table (for quick recall) – ( \text{Man‑days} = \text{Rate (man/day)} \times \text{Time (days)} )

Common Problem Types

  1. Single worker, given rate & work → Find time.
  2. Two workers, one slower → Find time for one to finish alone.
  3. Combined work → Find total time for multiple workers.
  4. Rest/Breaks → Adjust effective working time.
  5. Work split among workers → Use proportion or simultaneous work formulas.

✅ Worked Example

Problem

Three men, A, B and C, can complete a job in 12, 18 and 30 days respectively.
– A and B work together for 4 days.
– Then B and C work together for 6 days.
– Finally, only C works for the rest of the job.
In how many days will the whole job be finished?

Step‑by‑Step Solution

Step Description Calculation Result
1 Find individual rates (in “job per day”) ( R_A = \frac{1}{12} )
( R_B = \frac{1}{18} )
( R_C = \frac{1}{30} )
–
2 Combined rate of A+B ( R_{AB} = R_A + R_B = \frac{1}{12} + \frac{1}{18} = \frac{5}{36} ) –
3 Work done by A+B in 4 days ( W_{AB} = R_{AB} \times 4 = \frac{5}{36} \times 4 = \frac{5}{9} ) 5/9 of job
4 Combined rate of B+C ( R_{BC} = R_B + R_C = \frac{1}{18} + \frac{1}{30} = \frac{8}{90} = \frac{4}{45} ) –
5 Work done by B+C in 6 days ( W_{BC} = R_{BC} \times 6 = \frac{4}{45} \times 6 = \frac{24}{45} = \frac{8}{15} ) 8/15 of job
6 Total work done so far ( W_{\text{done}} = \frac{5}{9} + \frac{8}{15} )
Convert to common denominator 45:
( = \frac{25}{45} + \frac{24}{45} = \frac{49}{45} )
49/45 ≈ 1.0889 → >1? → Mistake!
7 Re‑check calculations Actually, step 3 had 5/9 = 25/45. Step 5 had 8/15 = 24/45. Summation = 49/45 > 1 → indicates that the job would finish earlier than 4+6 days.
So we need to find when the job completes: The job completes before the full 6 days of B+C.
8 Let (x) days be the time B+C actually work (after the first 4 days). Work done after first 4 days: 5/9. Remaining work: (1 - \frac{5}{9} = \frac{4}{9}).
9 Work done by B+C in (x) days: ( R_{BC} \times x = \frac{4}{45}x ). Set equal to remaining work: (\frac{4}{45}x = \frac{4}{9}).
10 Solve for (x): ( x = \frac{4}{9} \times \frac{45}{4} = 5 ) days. B+C work 5 days (not 6).
11 Total days spent: 4 (A+B) + 5 (B+C) = 9 days.
12 Any remaining work? After