Time & Work – Study Notes
(Gujarat Police Sub‑Inspector – Quantitative Aptitude)
1. Simple Explanation
Time & Work problems ask you to determine how long it will take for a person (or a group of persons) to complete a job, or the amount of work done by them in a given time.
The basic idea is:
- Work is a quantity that can be measured in units (e.g., “units of work”).
- Rate of work (or work‑rate) = Work ÷ Time (units per hour, day, etc.).
- Work done = Rate × Time.
- Time required = Work ÷ Rate.
When several workers are involved, their individual rates are added together (since they work in parallel).
When the same worker works at two different rates (e.g., morning vs. evening), you treat each period separately and sum the work.
2. Key Points & Formulas
| Concept | Formula | What it Means |
|---|---|---|
| Rate of a worker | ( R = \dfrac{W}{T} ) | Work done per unit time. |
| Work done in a given time | ( W = R \times T ) | Total work completed. |
| Time required to finish a job | ( T = \dfrac{W}{R} ) | How long it takes. |
| Combined rate of multiple workers | ( R_{\text{total}} = R_1 + R_2 + \dots + R_n ) | Add rates for parallel work. |
| Work done by a team in a given time | ( W_{\text{team}} = R_{\text{total}} \times T ) | Total work by all workers together. |
| Work done by one worker in fractional time | ( W = R \times \dfrac{t}{T_{\text{full}}} ) | If the job is a fraction of the whole. |
| Work done by a worker who works at different rates | ( W = R_1 \times t_1 + R_2 \times t_2 ) | Sum of works done in each period. |
Note:
- When a job is said to be completed in (X) days, (W = 1) (i.e., the whole job).
- If the job takes a fractional number of days, round as per problem requirement (usually to nearest whole number or given precision).
3. Worked Example
Problem:
A and B can complete a job in 10 days and 15 days respectively. They work together for 4 days. Then B leaves and A works alone for 2 more days. How many days will the whole job take?
Step‑by‑Step Solution
-
Determine individual rates.
- A’s rate: ( R_A = \dfrac{1}{10} ) job/day.
- B’s rate: ( R_B = \dfrac{1}{15} ) job/day.
-
Combined rate when both work together.
[ R_{AB} = R_A + R_B = \frac{1}{10} + \frac{1}{15} = \frac{3}{30} + \frac{2}{30} = \frac{5}{30} = \frac{1}{6}\ \text{job/day}. ] -
Work done in the first 4 days.
[ W_{\text{first 4}} = R_{AB} \times 4 = \frac{1}{6} \times 4 = \frac{4}{6} = \frac{2}{3}\ \text{job}. ] -
Remaining work after 4 days.
[ W_{\text{remaining}} = 1 - \frac{2}{3} = \frac{1}{3}\ \text{job}. ] -
A works alone for 2 more days. Work done by A in 2 days.
[ W_{\text{A, 2days}} = R_A \times 2 = \frac{1}{10} \times 2 = \frac{2}{10} = \frac{1}{5}\ \text{job}. ] -
Check if the job is finished.
[ \frac{1}{3} - \frac{1}{5} = \frac{5-3}{15} = \frac{2}{15}\ \text{job remaining}. ] So after 6 days, 2/15 of the job is still left. -
Time needed for A to finish the remaining 2/15 of the job.
[ T_{\text{final}} = \frac{W_{\text{remaining}}}{R_A} = \frac{\frac{2}{15}}{\frac{1}{10}} = \frac{2}{15} \times 10 = \frac{20}{15} = \frac{4}{3}\ \text{days} \approx 1.33\ \text{days}. ] -
Total time to finish the job.
[ T_{\text{total}} = 4\ \text{days (first part)} + 2\ \text{days (second part)} + \frac{4}{3}\ \text{days} = 6 + \frac{4}{3} = \frac{18+4}{3} = \frac{22}{3} = 7\frac{1}{3}\ \text{days}. ]
Answer: The whole job takes 7 ⅓ days (7 days and 8 hours).
4. Quick Revision Summary
- Compute each worker’s rate: (R = \frac{1}{\text{days to finish}}).
- Add rates for workers working together.
- Work done in a period = rate × time.
- Subtract completed work from total (1 job) to find remaining work.
- Use remaining work ÷ rate to find extra time needed.
- Add all time intervals for the final answer.