Time & Work – Kerala Patwari / Lekhpal
Topic – Time & Work (Work‑Rate)
Audience – Patwari / Lekhpal candidates
Difficulty – 2‑3 years of competitive exam level
1. Simple Explanation
Time & Work deals with how many workers (or machines, people, etc.) can finish a job in a given time, or how long a job will take for a given number of workers.
- Work is the amount of job.
- Rate (or Work‑Rate) is the amount of work done per unit time.
- Time = Work ÷ Rate.
The basic relations are:
| Symbol | Meaning | Formula |
|---|---|---|
| (W) | Total work (units of job) | – |
| (R) | Rate of a single worker | (R = \frac{W}{T}) |
| (T) | Time taken by a single worker | (T = \frac{W}{R}) |
| (n) | Number of workers | – |
| (R_{\text{total}}) | Combined rate | (R_{\text{total}} = n \times R) |
| (T_{\text{total}}) | Time for (n) workers | (T_{\text{total}} = \frac{W}{nR}) |
Key Idea – Work is additive. If two workers work together, the combined rate is the sum of their individual rates.
2. Key Points
-
Work–Rate Relation
[ \text{Rate} = \frac{\text{Work}}{\text{Time}} ] Works for all quantities (e.g., water flow, painting, etc.) -
Combined Rates
- If workers work simultaneously:
[ R_{\text{total}} = R_1 + R_2 + \dots + R_n ] - If workers work alternately (e.g., 1st works 1 hour, 2nd 2 hours, etc.) – compute each contribution separately.
- If workers work simultaneously:
-
Time for Multiple Workers
[ T_{\text{total}} = \frac{W}{R_{\text{total}}} ] -
Work Done by a Subset
[ \text{Work done} = \text{Rate} \times \text{Time} ] -
Work‑Rate Problems with “wasting” or “productive” time
- Productive time: ( \text{Productive rate} = \frac{\text{Work}}{\text{Productive time}} )
- Wasting time: Subtract wasted hours from total hours before applying the above.
-
Inverse Relation
If two workers’ times are known, the ratio of their rates is the inverse ratio of their times:
[ \frac{R_1}{R_2} = \frac{T_2}{T_1} ] -
Common Pitfalls
- Mixing up work and rate.
- Forgetting to convert units (e.g., minutes to hours).
- Assuming workers have identical rates when not stated.
- Ignoring “wasted” or “idle” time.
3. Worked Example
Problem (Exam‑style)
A team of 5 workers can finish a land survey in 12 days. 2 of these workers are replaced by 3 new workers whose rates are 50 % higher than the replaced ones. How many days will the new team take to finish the survey?
Step‑by‑Step Solution
-
Let
- Rate of each original worker = (r) (units of survey per day).
- Rate of each new worker = (1.5r).
-
Total work (W) (survey units) is the same for both teams.
-
Original team’s total rate
[ R_{\text{old}} = 5r ] Given: (R_{\text{old}} = \frac{W}{12}) (since they finish in 12 days). -
New team’s total rate
[ R_{\text{new}} = (5-2)r + 3(1.5r) = 3r + 4.5r = 7.5r ] -
Relate (r) to (W)
From step 3: (5r = \frac{W}{12}) → (r = \frac{W}{60}). -
Compute (R_{\text{new}})
[ R_{\text{new}} = 7.5 \times \frac{W}{60} = \frac{7.5W}{60} = \frac{W}{8} ] -
Time for new team
[ T_{\text{new}} = \frac{W}{R_{\text{new}}} = \frac{W}{W/8} = 8 \text{ days} ]
Answer: The new team will finish the survey in 8 days.
4. Quick Revision Summary
| Concept | Formula | Example |
|---|---|---|
| Rate | (R = \frac{W}{T}) | 1 worker does 30 units in 5 days → (R = 6) units/day |
| Combined Rate (Simultaneous) | (R_{\text{total}} = \sum R_i) | 3 workers each 4 units/day → (R_{\text{total}} = 12) |
| Time for (n) workers | (T = \frac{W}{nR}) | 4 workers, each 5 units/day, 100 units → (T = 5) days |
| Work Done | (W = R \times T) | 5 units/day × 3 days = 15 units |
| Rate Ratio (Inverse of Time Ratio) | (\frac{R_1}{R_2} = \frac{T_2}{T_1}) | Worker A 10 days, B 20 days → (R_A : R_B = 2 : 1) |
| Wasted Time | Subtract idle hours before computing (R) | 2 workers work 6 hrs/day, 1 hr wasted → productive hrs = 5 |
Tips for Exams
- Draw a diagram (workers vs. time) if the problem involves alternating work.