Odisha PSC /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Study Notes (Odisha PSC – Quantitative Aptitude)

Target audience: Candidates preparing for Odisha PSC (and similar competitive exams) who need a rigorous, exam‑oriented understanding of the “Time & Work” topic.
Style: Structured, concise, and derivation‑heavy.
Goal: Master the key ideas, formulas, and pitfalls; be ready to solve medium–hard problems under exam conditions.


1. Fundamental Definitions

Symbol Meaning Unit
(W) Total amount of work (job) 1 job (or “unit of work”)
(r) Rate of work (work done per unit time) job / day
(t) Time taken to finish the job days
(n) Number of workers / machines –

Basic relation

[ \boxed{W = r \times t} ]

If (W = 1) (i.e., a single, complete job), then the rate of a worker who can finish in (t) days is (r = \frac{1}{t}).


2. Working with Multiple Workers

2.1 Sum of Rates

If workers (A,B,C,\dots) work together on the same job:

[ W = (r_A + r_B + r_C + \dots),t ]

Thus

[ t = \frac{W}{r_A + r_B + r_C + \dots} ]

2.2 Work Done by a Subset

If a subset of workers starts after some time, we split the job:

  1. Part 1: Workers (X) work for (t_1) days → work done = ((r_X)t_1).
  2. Part 2: Workers (Y) join for (t_2) days → work done = ((r_Y)t_2).

Total work must equal (W):

[ (r_X)t_1 + (r_Y)t_2 = W ]


3. Key Formulae & Derivations

Formula Derivation / Explanation
Rate of one worker (\displaystyle r_i = \frac{1}{t_i}) From (W = r_i t_i) with (W = 1).
Combined rate (\displaystyle r_{\text{tot}} = \sum r_i) Work added per day is additive.
Time together (\displaystyle t = \frac{1}{r_{\text{tot}}}) Since (W=1).
Work done by one worker after (k%) of job (\displaystyle w = \frac{k}{100}) Percentage of job = fraction of 1.
Work left after partial completion (\displaystyle W_{\text{left}} = 1 - w) Subtract completed part.
Work done in a day by two workers (\displaystyle \frac{1}{t_1} + \frac{1}{t_2}) Sum of rates.
Time for a job if one worker leaves after (t_e) days (\displaystyle t_{\text{total}} = t_e + \frac{1 - r_{\text{worked}} t_e}{r_{\text{new}}}) Use total work = 1.

Important: Always keep work (W = 1) (one job) unless the problem explicitly states otherwise.


4. Common Tricky Points

Problem Pitfall Fix
“A can do 30 % of the job in 6 days” Misinterpreting “30 % in 6 days” as rate 0.30 per day. Convert to rate: (r_A = \frac{0.30}{6} = 0.

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.