Time & Work – Study Notes (Odisha PSC – Quantitative Aptitude)
Target audience: Candidates preparing for Odisha PSC (and similar competitive exams) who need a rigorous, exam‑oriented understanding of the “Time & Work” topic.
Style: Structured, concise, and derivation‑heavy.
Goal: Master the key ideas, formulas, and pitfalls; be ready to solve medium–hard problems under exam conditions.
1. Fundamental Definitions
| Symbol | Meaning | Unit |
|---|---|---|
| (W) | Total amount of work (job) | 1 job (or “unit of work”) |
| (r) | Rate of work (work done per unit time) | job / day |
| (t) | Time taken to finish the job | days |
| (n) | Number of workers / machines | – |
Basic relation
[ \boxed{W = r \times t} ]
If (W = 1) (i.e., a single, complete job), then the rate of a worker who can finish in (t) days is (r = \frac{1}{t}).
2. Working with Multiple Workers
2.1 Sum of Rates
If workers (A,B,C,\dots) work together on the same job:
[ W = (r_A + r_B + r_C + \dots),t ]
Thus
[ t = \frac{W}{r_A + r_B + r_C + \dots} ]
2.2 Work Done by a Subset
If a subset of workers starts after some time, we split the job:
- Part 1: Workers (X) work for (t_1) days → work done = ((r_X)t_1).
- Part 2: Workers (Y) join for (t_2) days → work done = ((r_Y)t_2).
Total work must equal (W):
[ (r_X)t_1 + (r_Y)t_2 = W ]
3. Key Formulae & Derivations
| Formula | Derivation / Explanation |
|---|---|
| Rate of one worker (\displaystyle r_i = \frac{1}{t_i}) | From (W = r_i t_i) with (W = 1). |
| Combined rate (\displaystyle r_{\text{tot}} = \sum r_i) | Work added per day is additive. |
| Time together (\displaystyle t = \frac{1}{r_{\text{tot}}}) | Since (W=1). |
| Work done by one worker after (k%) of job (\displaystyle w = \frac{k}{100}) | Percentage of job = fraction of 1. |
| Work left after partial completion (\displaystyle W_{\text{left}} = 1 - w) | Subtract completed part. |
| Work done in a day by two workers (\displaystyle \frac{1}{t_1} + \frac{1}{t_2}) | Sum of rates. |
| Time for a job if one worker leaves after (t_e) days (\displaystyle t_{\text{total}} = t_e + \frac{1 - r_{\text{worked}} t_e}{r_{\text{new}}}) | Use total work = 1. |
Important: Always keep work (W = 1) (one job) unless the problem explicitly states otherwise.
4. Common Tricky Points
| Problem | Pitfall | Fix |
|---|---|---|
| “A can do 30 % of the job in 6 days” | Misinterpreting “30 % in 6 days” as rate 0.30 per day. | Convert to rate: (r_A = \frac{0.30}{6} = 0. |