Odisha TET (Teacher Eligibility) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Advanced Study Notes

(Prepared for the Odisha Teacher Eligibility Test – Quantitative Aptitude)

Target audience: Students who already know the elementary “work‑rate” rules and want to understand the topic from first principles, with rigorous proofs, edge‑case analysis and a challenging problem to test depth of understanding.*


1. Introduction

In the Time & Work problem, we treat work as a quantifiable quantity.
Each person (or machine) works at a constant rate, measured as units of work per unit time.
The classic example: “A can finish a job in 20 days; B finishes it in 30 days; how long will A and B together take?”

The challenge is to express all the information mathematically, solve the resulting equations, and interpret the solution.
The advanced treatment below derives the fundamental rules from first principles, discusses subtle edge cases, and presents a more general linear‑algebraic formulation that can be extended to variable rates.


2. From First Principles

2.1 Work as a Quantity

Let

  • (W) = total amount of work (a scalar quantity).
  • (t) = time (in units such as days).
  • (r) = rate of work (units of (W) per unit time).

The core relation is

[ \boxed{W = r , t} ]

This is simply the definition of a rate. It holds for every constant rate process.

2.2 Rate of an Individual

If an individual (i) finishes the entire job in (D_i) days, then

[ r_i = \frac{W}{D_i} ]

Thus the rate is the reciprocal of the time needed to finish the job alone.

Proof.
Starting from (W = r_i D_i). Solve for (r_i): (r_i = W/D_i). ∎

2.3 Combined Rates

If several individuals (i = 1,\dots,n) work simultaneously and each works at a constant rate (r_i), the total rate (R) is the sum:

[ R = \sum_{i=1}^{n} r_i ]

Proof.
Let (t) be a small time interval.
The work done by person (i) is (r_i t).
Total work in the interval is (\sum_i r_i t = R t).
Since (R) is constant over time, the same sum holds for any interval, proving additivity. ∎

2.4 Work Done in a Time Interval

If a team of rate (R) works for (t) units of time, the work done is

[ W_{\text{done}} = R t ]

The remaining work is (W - W_{\text{done}}).

2.5 Work Completed by One or More Persons

Consider a problem where A and B work together for (t_{AB}) days, then A leaves, and B continues alone.
Let

  • (D_A) = days for A alone,
  • (D_B) = days for B alone.

Rates: (r_A = W/D_A), (r_B = W/D_B).
During (t_{AB}) days, the joint work done is ((r_A + r_B) t_{AB}).
The remaining work is (W - (r_A + r_B) t_{AB}).
B alone finishes it in (t_B = \frac{W - (r_A + r_B) t_{AB}}{r_B}).
The total time is (t_{AB} + t_B).


3. Solving Simple Problems – Worked Example

Problem:
A can finish a job in 24 days. B can finish it in 32 days. They start together. After 6 days, B leaves. How many days does A take to finish the job?

Solution

  1. Rates
    [ r_A = \frac{W}{24},;;; r_B = \frac{W}{32} ]
  2. Joint rate
    [ r_{AB} = r_A + r_B = \frac{W}{24} + \frac{W}{32} = \frac{7W}{96} ]
  3. Work done in 6 days
    [ W_{\text{done}} = r_{AB}\times 6 = \frac{7W}{96}\times 6 = \frac{7W}{16} ]
  4. Remaining work
    [ W_{\text{rem}} = W - \frac{7W}{16} = \frac{9W}{16} ]
  5. Time for A alone to finish
    [ t_A = \frac{W_{\text{rem}}}{r_A} = \frac{9W/16}{W/24} = \frac{9}{16}\times 24 = 13.5 \text{ days} ]
  6. Total time = (6 + 13.5 = 19.5) days.

Answer: 19.5 days.


4. Work with Changing Workforce

4.1 Piecewise Constant Rates

Suppose the workforce changes at discrete times (t_1, t_2,\dots,t_k).

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.