Jharkhand TET (Teacher Eligibility) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes · Updated

Time & Work – Quantitative Aptitude

(For Jharkhand TET – Teacher Eligibility Test)

Time & Work deals with the relationship between the amount of work, the rate of work done by one or more workers, and the time taken.
The basic idea: Work = Rate × Time.


1. Simple Explanation

Concept Symbol Formula Example (one worker)
Work (W) (W = r \times t) A worker finishes a job in 5 hrs → (W = 1) (whole job).
Rate (r) (r = \dfrac{W}{t}) (r = \dfrac{1}{5} = 0.2) jobs/hr.
Time (t) (t = \dfrac{W}{r}) (t = \dfrac{1}{0.2} = 5) hrs.

When several workers work together:
(r_{\text{total}} = r_1 + r_2 + \dots + r_n).
Time taken together (t = \dfrac{W}{r_{\text{total}}}).


2. Key Points

# Topic What to remember
1 Work is additive If A does 1/3 of a job in 9 hrs, B does 1/6 of same job in 12 hrs, together they do 1/3 + 1/6 = 1/2 of job.
2 Work done in a day For part‑day work, use fractions: 3 hrs out of 8‑hr day → ( \frac{3}{8}) of daily work.
3 Inverse relationship If rate doubles, time halves (assuming work constant).
4 Work vs Time Work ∝ 1/Time when rate is constant.
5 Combined work (t_{\text{both}} = \frac{1}{\frac{1}{t_A} + \frac{1}{t_B}}) when each alone finishes the job in (t_A, t_B) hrs.
6 Serial vs Parallel Serial: one after the other → add times. Parallel: together → use combined rate.
7 Units Always keep units consistent (hrs, days, etc.).

3. Worked Example

Problem

Worker A can complete a job in 12 hrs. Worker B can complete the same job in 18 hrs. They start together. How long will it take them to finish the job?

Step‑by‑Step

  1. Compute individual rates

    • (r_A = \frac{1 \text{ job}}{12 \text{ hrs}} = \frac{1}{12}) jobs/hr
    • (r_B = \frac{1}{18}) jobs/hr
  2. Find combined rate
    [ r_{\text{total}} = r_A + r_B = \frac{1}{12} + \frac{1}{18} ] Find common denominator (36):
    [ r_{\text{total}} = \frac{3}{36} + \frac{2}{36} = \frac{5}{36}\text{ jobs/hr} ]

  3. Compute time to finish 1 job
    [ t = \frac{W}{r_{\text{total}}} = \frac{1}{\frac{5}{36}} = \frac{36}{5} = 7.2 \text{ hrs} ] So they finish the job in 7 hrs 12 min.

Quick check:
In 7.2 hrs, A does (7.2 \times \frac{1}{12}=0.6) job, B does (7.2 \times \frac{1}{18}=0.4) job → total (1.0) job.


4. Quick Revision Summary

Formula What it gives Example usage
(W = r \times t) Work done Find work done by a worker in given time
(r = \dfrac{W}{t}) Rate of work Convert time to rate
(t = \dfrac{W}{r}) Time required Find time for given work & rate
(r_{\text{total}} = r_1 + r_2 + \dots) Combined rate Workers working together
(t_{\text{both}} = \dfrac{1}{\frac{1}{t_A} + \frac{1}{t_B}}) Time for two workers If each can finish job alone in known times
(t_{\text{serial}} = t_A + t_B) Time when working one after another Serial tasks
(\text{Work done in fraction of day} = \frac{\text{hours worked}}{\text{total working hours}}) Partial‑day work 3 hrs of 8‑hr day → (3/8) job

Quick Tips

  1. Always convert to the same unit (hrs or days) before adding or dividing.
  2. Check for “part of the job” vs “whole job” confusion.
    Use “(1)” to represent the whole job.
  3. Use fractions early to avoid rounding errors.
  4. Remember the inverse relationship: doubling rate halves time.
  5. Serial work → add times; Parallel work → add rates.

Practice Question

*Mr. X can paint

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.