Jharkhand Forest Guard /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Advanced MIT‑Level Study Notes

(Designed for the Jharkhand Forest Guard Quantitative Aptitude Exam)

Goal – Understand every aspect of “Time & Work” from its first‑principle derivation to edge‑case analysis and solve a challenging problem that tests both algebraic manipulation and conceptual insight.


1. Introduction

Time & Work problems are essentially linear systems describing how many units of work are completed by workers working at constant (or varying) rates.
They form the backbone of many “work‑rate” questions in competitive exams, but a deeper understanding unlocks faster problem solving and error‑free reasoning.


2. Basic Definitions

Symbol Meaning Units
(W) Total work required (e.g., “to dig a trench”) work‑units
(n) Number of workers dimensionless
(r_i) Rate of worker (i) (work done per unit time) work‑units / time
(t_i) Time spent by worker (i) time
(r) Combined rate of a group work‑units / time
(T) Total time required for a group time

3. Fundamental Equation (From First Principles)

  1. Rate Definition
    [ r_i = \frac{\text{work done by } i}{\text{time spent by } i} ] Hence, ( \text{work done by } i = r_i, t_i).

  2. Work Conservation
    [ W = \sum_{i=1}^{n} r_i, t_i ]

  3. If all workers work simultaneously for the same time (T)
    [ W = \left(\sum_{i=1}^{n} r_i\right) T ] Hence, [ T = \frac{W}{\sum_{i=1}^{n} r_i} = \frac{W}{r_{\text{total}}} ] This is the Time‑Work‑Rate formula.


4. Derivation via Linear Algebra

Let the rate vector be (\mathbf{r} = (r_1,\dots,r_n)^\top).
Let the time vector be (\mathbf{t} = (t_1,\dots,t_n)^\top).

The total work is the inner product: [ W = \mathbf{r}^\top \mathbf{t} ] If all workers work simultaneously for (T) units of time: [ \mathbf{t} = T \mathbf{1}_n \quad\Rightarrow\quad W = T, (\mathbf{r}^\top \mathbf{1}_n) ] Thus, [ T = \frac{W}{\mathbf{r}^\top \mathbf{1}_n} ] This linear‑algebra view clarifies why the model is additive (superposition) and why the time required is inversely proportional to the sum of rates.


5. Edge Cases & Common Pitfalls

Situation What Happens How to Handle
Zero workers ((n=0)) (\sum r_i = 0) → division by zero. Impossible: work cannot be finished.
Zero rate worker (r_i = 0). They contribute nothing; treat them as non‑workers. Ignore them in (\sum r_i).
Negative rate A worker removing work (e.g., demolishing). Allow sign; total rate can be negative. If (\sum r_i < 0), work will increase over time → impossible to finish.
Infinite time (T \to \infty). Only if (\sum r_i = 0) (no net progress).
Fractional worker (n) not integer (e.g., 0.5 of a worker). Interpret as rate contributed: (r_{\text{half}} = 0.5 r_{\text{full}}).
Varying rates Rate changes over time (e.g., fatigue). Model as (r(t)); then (W = \int_0^T r(t),dt).
Work units not standard Work measured in “days” or “hours” inconsistently. Convert all times to a common base (e.g., hours).
Simultaneous vs. Staggered Work Workers may start or stop at different times. Use piecewise integration or solve linear equations for each segment.

Tip – Always check that the denominator (\sum r_i) is positive; otherwise the problem is physically impossible.


6. Advanced Topics

6.1 Continuous Rate Functions

If a worker’s rate varies continuously with time (e.g., due to fatigue or machinery wear), let (r(t)) be the rate at time (t).
Then the work done in interval ([0,T]) is [ W = \int_0^T r(t),dt ] If (r(t)) is linear, quadratic, or exponential, the integral can be evaluated analytically.

6.2 Rate as a Function of Work Done

Sometimes the rate depends on how much work is left (e.g., a team gets more efficient as they progress).
Let (r(W_{\text

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.