Assam Patwari / Lekhpal /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Advanced Study Notes

(Designed for the Assam Patwari / Lekhpal quantitative aptitude course – MIT‑level)

Audience: Students who already know the basic “work‑rate‑time” formulas and wish to see the subject from a rigorous, mathematical perspective.
Goal: Build a solid foundation, expose edge cases, and develop intuition for handling complex, real‑world scenarios.


1. Foundations

1.1 Basic Definitions

Symbol Meaning Units
(W) Total amount of work (job) “Work‑units” (arbitrary)
(R) Rate of work ( \text{Work},\text{units}/\text{time} )
(T) Time taken time

Assumption: Work can be divided into infinitesimal parts that are processed at constant rates.

1.2 From First Principles

Let a job be represented by a measurable function (f(t)) that indicates the instantaneous amount of work done per unit time (i.e., the rate) at time (t).
If the job starts at (t=0) and ends at (t=T):

[ W ;=; \int_{0}^{T} f(t),dt . ]

If the rate is constant, (f(t)=R), and the integral collapses to the familiar

[ W = R,T \quad\Longleftrightarrow\quad R=\frac{W}{T},; T=\frac{W}{R}. ]


2. Working Together – Linearity

2.1 Two Workers

Suppose worker (A) works at rate (R_A) and worker (B) at rate (R_B).
If they work simultaneously on the same job, the combined rate is

[ R_{AB}=R_A+R_B . ]

Proof:
For an infinitesimal interval (\Delta t), worker (A) completes (R_A\Delta t) units, and (B) completes (R_B\Delta t) units.
The total work is ((R_A+R_B)\Delta t).
Taking the limit (\Delta t\to 0) gives the integral above.

2.2 Generalization

For (n) workers with rates (R_1,\dots,R_n):

[ R_{\text{total}}=\sum_{i=1}^{n} R_i . ]


3. Variable Rates and Piecewise Work

3.1 Piecewise Constant Rates

If a worker’s rate changes at known breakpoints (0=t_0<t_1<\dots<t_k=T):

[ W = \sum_{i=1}^{k} R_i,(t_i-t_{i-1}) . ]

3.2 Continuous Variable Rates

When (f(t)) is a continuous function (e.g., fatigue, fatigue recovery, or machinery wear):

[ W = \int_{0}^{T} f(t),dt . ]

Example: A worker’s rate decreases linearly from (R_0) to (R_f) over (T) hours: [ f(t)=R_0-\frac{R_0-R_f}{T}t,\qquad W = \int_0^T f(t),dt = \frac{R_0+R_f}{2},T . ]


4. Edge Cases & Special Situations

Situation Analysis Key Insight
Zero Work ((W=0)) If (W=0), then either (T=0) or (R=0) (or both). No job → no time or no rate.
Infinite Workers (n\to\infty) with finite total rate? If each worker has rate (r/n), total rate (r) remains finite. Scaling of rates keeps total work finite.
Negative Rate (R<0) would imply undoing work. If a job can be undone, the formula still holds but yields negative work. Important in reverse‑engineering or error correction.
Stochastic Rates Rate (R(t)) is random with expectation (\mathbb{E}[R(t)]). Expected work (\mathbb{E}[W] = \int_0^T \mathbb{E}[R(t)],dt).
Dependent Work Some tasks can only start after another completes (series vs. parallel). Need to model with DAGs or scheduling algorithms.

5. Advanced Theory: Rate as a Function of Work Completed

Sometimes the rate is not a function of time but of the remaining or completed work, e.g., (R = k \cdot (W_{\text{remaining}})).

5.1 Exponential Decay of Work

If (R(t)=k,(W_{\text{remaining}}(t))), then

[ \frac{dW_{\text{remaining}}}{dt} = -k,W_{\text{remaining}}, ] which solves to

[ W