Uttarakhand PSC – Quantitative Aptitude
Topic: Time & Work
Time & Work problems test your ability to handle rates of work, combine multiple workers, and convert between time, work and person‑days. Mastering these concepts will help you solve a variety of related questions quickly and accurately.
1. Simple Explanation
| Concept | Meaning | Formula |
|---|---|---|
| Rate of work | Amount of work completed per unit time. | ( R = \dfrac{W}{T} ) |
| Work | Total job to be done (often expressed in “man‑days” or “units”). | ( W = R \times T ) |
| Time | Duration needed to finish the job. | ( T = \dfrac{W}{R} ) |
| Persons | Number of workers contributing. | If each worker has the same rate ( r ), then total rate ( R = P \times r ). |
Key idea:
Work is additive. If two or more persons work together, their combined rate is the sum of individual rates. If they work in different periods, sum the work done in each period.
2. Key Points / Formulae
| Scenario | Formula | Notes |
|---|---|---|
| One person | ( T = \dfrac{1}{r} ) | ( r ) = rate of that person. |
| Two persons working together | ( T = \dfrac{1}{r_1 + r_2} ) | Add rates. |
| ( P ) persons doing same work | ( T = \dfrac{1}{P \times r} ) | All rates equal. |
| Work done by a person in ( t ) hours | ( W = r \times t ) | |
| Work done by ( P ) persons in ( t ) hours | ( W = P \times r \times t ) | |
| Work left after some work | ( W_{\text{left}} = W_{\text{total}} - W_{\text{done}} ) | |
| Change in rate | If rate changes at time ( t ), split job into parts. |
Common Conversions
| Units | Conversion |
|---|---|
| Man‑hours | 1 day = 8–10 hours (use 8 hrs for simplicity unless specified). |
| Work per day | If a person does ( 5 ) units per day, rate ( r = \frac{5}{8} ) units per hour. |
Tricks
- Work‑Time‑Rate Triangle
( W : T : R ) – If you know any two, find the third using ( W = R \times T ). - Inverse Relationship
More workers → less time, but rate increases linearly. - Work Left
Always calculate total work first, then subtract what’s done to find the remaining work.
3. Worked Example
Problem
A person A can complete a job in 12 days. Person B can do the same job in 18 days.
- How long will it take them to finish the job together?
- If they work together for 4 days, how many days will B alone need to finish the remaining work?
Step 1: Compute Individual Rates
- ( r_A = \frac{1}{12} ) job/day
- ( r_B = \frac{1}{18} ) job/day
Step 2: Combined Rate
( r_{\text{total}} = r_A + r_B = \frac{1}{12} + \frac{1}{18} )
Find common denominator (36):
( r_{\text{total}} = \frac{3}{36} + \frac{2}{36} = \frac{5}{36} ) job/day
Step 3: Time Together
( T_{\text{both}} = \frac{1}{r_{\text{total}}} = \frac{1}{5/36} = \frac{36}{5} = 7.2 ) days
Answer 1: 7.2 days (i.e., 7 days 4.8 hours).
Step 4: Work Done in First 4 Days
Work done = rate × time
( W_{\text{done}} = r_{\text{total}} \times 4 = \frac{5}{36} \times 4 = \frac{20}{36} = \frac{5}{9} ) of job
Remaining work ( W_{\text{left}} = 1 - \frac{5}{9} = \frac{4}{9} )
Step 5: B’s Rate Alone
( r_B = \frac{1}{18} ) job/day
Time for B to finish remaining ( \frac{4}{9} ):
( T_B = \frac{W_{\text{left}}}{r_B} = \frac{4/9}{1/18} = \frac{4}{9} \times 18 = 8 ) days
Answer 2: B alone needs 8 days to finish the remaining work.
4. Quick Revision Summary
- Rate of work = ( \frac{\text{Work}}{\text{Time}} )
- Combined rate = sum of individual rates
- Time = ( \frac{\text{Work}}{\text{Rate}} )
- Work done in a period = rate × time
- Work left = total work – work done
- Always break the job into parts if rates change or if only part of the job is done together.
- Use common denominators to add rates.
- Check units carefully (days vs hours).
Practice Problem (Try before moving on)
A machine can produce 120 widgets in 8 hours. If a second machine, slower by 30%, starts 2 hours later, how many widgets are produced in the first 10 hours?
(Work through using rates, conversion, and subtraction.)
Good luck! Master these concepts and you’ll breeze through all time‑and‑work questions in the Uttarakhand PSC quantitative aptitude section.