Manipur PSC /Quantitative Aptitude

Time & work

Commercial Maths · free study notes · Updated

Time & Work – Study Notes

Manipur PSC – Quantitative Aptitude


1. Simple Explanation

  • Time & Work problems ask you to determine how long it takes for one or more workers (or machines, people, etc.) to complete a job, or how many workers are required to finish a job in a given time.
  • Think of work as a quantity (e.g., a job, a task, a length of work) that can be divided into work units (like “hr‑work”).
  • The rate of a worker is work done per unit time (e.g., “1 job in 4 hrs” → rate = ¼ job/hr).
  • For multiple workers, rates add up (if they work together).
  • Use the basic relation

[ \text{Work} = \text{Rate} \times \text{Time} ]


2. Key Points & Formulas

Concept Symbol Formula What it means
Total work (W) — Usually “1 job” or a given quantity
Rate of one worker (R) (R = \frac{1}{T}) Work done per hour
Time taken by one worker (T) (T = \frac{1}{R}) Hours needed by one worker
Combined rate of (n) workers (R_{\text{total}}) (R_{\text{total}} = \sum_{i=1}^{n} R_i) How fast all workers together finish
Work done by one worker in (t) hours (W_i) (W_i = R_i \times t) Portion of job completed
Work done by all workers together in (t) hours (W_{\text{total}}) (W_{\text{total}} = R_{\text{total}} \times t) Portion of job completed
Workers needed to finish a job in (T) hours (n) (n = \frac{W}{R \times T}) When workers have same rate

Common Tricks

  • Work left after a period: (W_{\text{left}} = W_{\text{total}} - W_{\text{done}}).
  • Work done by multiple workers in different periods: Break the job into segments, compute each segment separately, then sum.
  • Ratio method: If two workers work together for some time, the ratio of their rates equals the ratio of work they individually finish in the same time.
  • Work‑time graph: Visualize cumulative work vs. time; slope = rate.

3. Worked Example

Problem

A, B, and C can complete a job in 10, 12, and 15 days respectively. They work together for 4 days. After that, B and C continue alone. How many more days will B and C need to finish the job?

Step 1: Convert days to rate (jobs per day)

Worker Time to finish 1 job (days) Rate (R) (jobs/day)
A 10 (R_A = \frac{1}{10})
B 12 (R_B = \frac{1}{12})
C 15 (R_C = \frac{1}{15})

Step 2: Combined rate of all three

[ R_{\text{ABC}} = R_A + R_B + R_C = \frac{1}{10} + \frac{1}{12} + \frac{1}{15} ]

Compute common denominator (60):

[ R_{\text{ABC}} = \frac{6+5+4}{60} = \frac{15}{60} = \frac{1}{4}\text{ job/day} ]

So together they finish ¼ of the job per day.

Step 3: Work done in first 4 days

[ W_{\text{done}} = R_{\text{ABC}} \times 4 = \frac{1}{4} \times 4 = 1 \text{ job} ]

Wait – that would be the whole job, but we mis‑calculated:
Actually (R_{\text{ABC}} = \frac{1}{4}) job/day → in 4 days they finish (1) job. But that can't be; check calculation.

Hold on! Recalculate:

[ \frac{1}{10} = 0.1,\quad \frac{1}{12}\approx0.0833,\quad \frac{1}{15}\approx0.0667 ] Sum ≈ 0.25. Yes, indeed they finish the whole job in 4 days.
But the problem expects them to finish partially. Let's adjust the example to avoid confusion.

New Example (corrected)

A, B, C finish a job in 8, 12, and 24 days respectively. A and B work together for 2 days. Then B and C work together until the job is finished. How many days did B work in total?

Revised Steps

  1. Rates

[ R_A = \frac{1}{8},; R_B = \frac{1}{12},; R_C = \frac{1}{24} ]

  1. Combined rate of A & B

[ R_{AB} = \frac{1}{8} + \frac{1}{12} = \frac{3+2}{24} = \frac{5}{24}\text{ job/day} ]

  1. Work done in first 2 days

[ W_{\text{done}} = R_{AB} \times 2 = \frac{5}{24} \times 2 = \frac{5}{12}\text{ job} ]

  1. Work left

[ W_{\text{left}} = 1 - \frac{5}{12} = \frac{7}{12}\text{ job} ]

  1. Combined rate of B & C

[ R_{BC} = \frac{1}{12} + \frac{1}{24} = \frac{2+1}{24} = \frac{3}{24} = \frac{1}{8}\text

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.