Time & Work – Study Notes
(For Manipur Patwari / Lekhpal & Competitive Exams – IIT‑JEE, AIEEE, JEE Main, etc.)
Why study Time & Work?
• It tests your ability to model real‑world situations with algebra.
• It is a staple in competitive aptitude sections.
• Mastery of this topic gives a huge edge in solving “jobs in (n) days” type questions quickly.
1. Fundamental Concepts
| Symbol | Meaning | Units |
|---|---|---|
| (R) | Rate of a worker/machine (work per unit time) | job per hour (or per day) |
| (T) | Time taken to complete a job | hours / days |
| (W) | Work (total quantity to be done) | job (unitless) |
| (N) | Number of workers/machines | dimensionless |
Core Relationship
[ \boxed{W = R \times T} ] or equivalently [ \boxed{R = \frac{W}{T}},,\qquad \boxed{T = \frac{W}{R}} ]
Interpretation – If a worker can finish (R) part of the job in one unit of time, he will need (1/R) units of time to finish the whole job.
2. Work Done by Multiple Workers
2.1 All Workers Work Simultaneously
If (n) workers each work at rate (r_i) (in job per unit time), then total rate is
[ R_{\text{total}} = \sum_{i=1}^{n} r_i ]
Hence time to finish a job (W):
[ T = \frac{W}{\sum_{i=1}^{n} r_i} ]
Example
Worker A: 3 jobs/day, Worker B: 5 jobs/day
Total rate = (3+5=8) jobs/day → 1 job takes (1/8) day.
2.2 One Worker Leaves Before Completion
Suppose worker (A) works for (t_a) units, worker (B) works for (t_b) units, and after (t_a) the job is finished.
Work done by (A): (R_a \times t_a).
Work remaining for (B): (W - R_a \times t_a).
Time for (B): (\displaystyle t_b = \frac{W - R_a t_a}{R_b}).
3. Work Done by Machines / Machines with Downtime
If a machine operates for a fraction (f) of the time (e.g., 80% uptime), then effective rate = (f \times R_{\text{machine}}).
4. Derivation of Classic “Jobs in (n) Days” Formula
Let two workers (A) and (B) together finish a job in (n) days.
Let (A) alone finish it in (x) days, (B) alone in (y) days.
[ \begin{aligned} R_A &= \frac{1}{x},, \qquad R_B = \frac{1}{y} \ R_{\text{total}} &= R_A + R_B = \frac{1}{n}\[4pt] \frac{1}{x} + \frac{1}{y} &= \frac{1}{n} \end{aligned} ]
From this we can solve for any unknown (e.g., (y) if (x) and (n) known).
Why this is powerful – It converts a time–work problem into a simple rational equation.
5. Tricky Points & Common Mistakes
| Mistake | Why it occurs | Fix |
|---|---|---|
| Assuming rate (= \frac{1}{time}) but using time in hours while rate is jobs/day | Units mismatch | Convert everything to same unit (days or hours) first |
| Adding times instead of rates | Confusing “(A) takes 4 days” with “(A) works 4 days” | Work in rates; use (R = 1/T) |
| Ignoring partial days | Many problems give “works for 3 days, then 2 more days” | Keep rates as fractions; compute work done in each segment |
| Assuming work done is linear with time when machines have downtime | Some machines may need overhaul after every (k) hours | Break schedule into operating & idle intervals |
| Using “average of times” instead of “sum of rates” | Mistake in combining workers with different speeds | Use reciprocal of times to get rates; sum them |
6. Hard Practice Question (Competitive Level)
Question
In a village, 12 boys and 8 girls can complete a certain amount of irrigation work in 9 days.
If 3 boys leave midway after 4 days, and 4 girls join at that instant, the whole job still finishes in exactly 9 days.
Find the number of days it would take a single girl alone to complete the same job.
Solution
-
Let
- Rate of one boy = (b) (jobs/day)
- Rate of one girl = (g) (jobs/day)
-
Initial total rate (12 boys + 8 girls)
[ R_{\text{initial}} = 12b + 8g ]
-
Work done in first 4 days
[ W_{\text{first 4}} = 4(12b + 8g) = 48b + 32g ]
-
After 4 days
- 3 boys leave → remaining boys = 9
- 4 girls join → girls = 12
New total rate