Manipur Patwari / Lekhpal /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Study Notes

(For Manipur Patwari / Lekhpal & Competitive Exams – IIT‑JEE, AIEEE, JEE Main, etc.)

Why study Time & Work?
• It tests your ability to model real‑world situations with algebra.
• It is a staple in competitive aptitude sections.
• Mastery of this topic gives a huge edge in solving “jobs in (n) days” type questions quickly.


1. Fundamental Concepts

Symbol Meaning Units
(R) Rate of a worker/machine (work per unit time) job per hour (or per day)
(T) Time taken to complete a job hours / days
(W) Work (total quantity to be done) job (unitless)
(N) Number of workers/machines dimensionless

Core Relationship

[ \boxed{W = R \times T} ] or equivalently [ \boxed{R = \frac{W}{T}},,\qquad \boxed{T = \frac{W}{R}} ]

Interpretation – If a worker can finish (R) part of the job in one unit of time, he will need (1/R) units of time to finish the whole job.


2. Work Done by Multiple Workers

2.1 All Workers Work Simultaneously

If (n) workers each work at rate (r_i) (in job per unit time), then total rate is

[ R_{\text{total}} = \sum_{i=1}^{n} r_i ]

Hence time to finish a job (W):

[ T = \frac{W}{\sum_{i=1}^{n} r_i} ]

Example

Worker A: 3 jobs/day, Worker B: 5 jobs/day
Total rate = (3+5=8) jobs/day → 1 job takes (1/8) day.


2.2 One Worker Leaves Before Completion

Suppose worker (A) works for (t_a) units, worker (B) works for (t_b) units, and after (t_a) the job is finished.
Work done by (A): (R_a \times t_a).
Work remaining for (B): (W - R_a \times t_a).
Time for (B): (\displaystyle t_b = \frac{W - R_a t_a}{R_b}).


3. Work Done by Machines / Machines with Downtime

If a machine operates for a fraction (f) of the time (e.g., 80% uptime), then effective rate = (f \times R_{\text{machine}}).


4. Derivation of Classic “Jobs in (n) Days” Formula

Let two workers (A) and (B) together finish a job in (n) days.
Let (A) alone finish it in (x) days, (B) alone in (y) days.

[ \begin{aligned} R_A &= \frac{1}{x},, \qquad R_B = \frac{1}{y} \ R_{\text{total}} &= R_A + R_B = \frac{1}{n}\[4pt] \frac{1}{x} + \frac{1}{y} &= \frac{1}{n} \end{aligned} ]

From this we can solve for any unknown (e.g., (y) if (x) and (n) known).

Why this is powerful – It converts a time–work problem into a simple rational equation.


5. Tricky Points & Common Mistakes

Mistake Why it occurs Fix
Assuming rate (= \frac{1}{time}) but using time in hours while rate is jobs/day Units mismatch Convert everything to same unit (days or hours) first
Adding times instead of rates Confusing “(A) takes 4 days” with “(A) works 4 days” Work in rates; use (R = 1/T)
Ignoring partial days Many problems give “works for 3 days, then 2 more days” Keep rates as fractions; compute work done in each segment
Assuming work done is linear with time when machines have downtime Some machines may need overhaul after every (k) hours Break schedule into operating & idle intervals
Using “average of times” instead of “sum of rates” Mistake in combining workers with different speeds Use reciprocal of times to get rates; sum them

6. Hard Practice Question (Competitive Level)

Question
In a village, 12 boys and 8 girls can complete a certain amount of irrigation work in 9 days.
If 3 boys leave midway after 4 days, and 4 girls join at that instant, the whole job still finishes in exactly 9 days.
Find the number of days it would take a single girl alone to complete the same job.


Solution

  1. Let

    • Rate of one boy = (b) (jobs/day)
    • Rate of one girl = (g) (jobs/day)
  2. Initial total rate (12 boys + 8 girls)

    [ R_{\text{initial}} = 12b + 8g ]

  3. Work done in first 4 days

    [ W_{\text{first 4}} = 4(12b + 8g) = 48b + 32g ]

  4. After 4 days

    • 3 boys leave → remaining boys = 9
    • 4 girls join → girls = 12

    New total rate

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.