Time & Work – Meghalaya Forest Guard (Quantitative Aptitude)
Goal: Learn how to solve problems where several workers (or machines) perform a job together or separately, using the concept of rate of work and time.
1. Simple Explanation
- Rate of work = amount of work done per unit time (e.g., jobs per hour).
- If A can finish a job in T hours, his rate is
R = 1/Tjobs per hour. - When multiple workers work together, their rates add up.
- To find total time:
time = total work / combined rate.
2. Key Points
| Concept | Formula | Example |
|---|---|---|
| Individual rate | R = 1 / T |
A finishes in 8 h → R_A = 1/8 job/h |
| Combined rate | R_total = R_A + R_B + … |
Two workers: R_total = R_A + R_B |
| Total work | Usually 1 job (or 100 % of the job) | 1 job = 100 % |
| Time to finish | T = Total work / R_total |
T = 1 / R_total |
| Work done in time t | W = R_total * t |
0.5 job in 4 h → R_total = 0.125 job/h |
| If workers are added/removed | Recalculate R_total accordingly |
|
| Equality of work | If two workers do equal work, their rates are inversely proportional to their times. |
3. Worked Example
Problem (typical for the Forest Guard exam):
Babu can clear a forest area in 12 days. Chandra can do the same in 15 days. They work together for 4 days and then Babu leaves. How many more days will Chandra need to finish the remaining work?
Step‑by‑step solution
-
Find individual rates (jobs per day).
- Babu:
R_B = 1/12job/day - Chandra:
R_C = 1/15job/day
- Babu:
-
Combined rate when both work together.
R_total = R_B + R_C = 1/12 + 1/15 = (5 + 4)/60 = 9/60 = 3/20job/day -
Work done in the first 4 days.
Work_done_4d = R_total * 4 = (3/20) * 4 = 12/20 = 3/5of the job -
Remaining work.
Remaining = 1 – 3/5 = 2/5of the job -
Chandra works alone now.
Her rate is
1/15job/day.
Time needed for remaining work:T_remaining = Remaining / R_C = (2/5) / (1/15) = (2/5) * 15 = 6days
Answer
Chandra needs 6 more days to finish the forest clearing.
4. Quick Revision Summary
- Rate =
1 / time. - Combined rate = sum of individual rates.
- Time to finish =
Total work / Combined rate. - For partial work:
Work_done = Rate * time. - Always assume total work = 1 job unless stated otherwise.
- Convert all units (hours, days, etc.) consistently.
- Check for “equal work” scenarios: equal work → inverse time relationship.
Tip: Draw a simple table of times, rates, and work done; it keeps the algebra clean and reduces mistakes.