Time & Work – Study Notes (IIT‑JEE / Competitive Exams)
Topic: Time & Work
Exam: Nagaland Police Sub‑Inspector (SI) – Quantitative Aptitude
Focus: Rigorous, exam‑oriented explanation, derivations, key formulas, tricky points, and a hard practice question.
1. Core Concept
Time & Work deals with how long it takes (time) for a set of workers (or machines, people, etc.) to complete a task (work), given their individual rates of work.
- Work (W) – a unitless quantity that represents the amount of job to be done.
- Rate of Work (r) – amount of work done in one unit of time.
- Time (t) – duration needed to complete the work.
Fundamental Relation
[ \boxed{W = r \times t} ]
or, solving for any variable:
[ t = \frac{W}{r}, \quad r = \frac{W}{t} ]
2. Deriving Key Formulas
2.1 Individual Rates
If person A completes a job in (T_A) hours,
[ r_A = \frac{1}{T_A} \quad(\text{work per hour}) ]
Similarly for B in (T_B) hours:
[ r_B = \frac{1}{T_B} ]
2.2 Combined Rate (Parallel Work)
When A and B work together:
[ r_{\text{total}} = r_A + r_B = \frac{1}{T_A} + \frac{1}{T_B} ]
Thus time to finish the same job together:
[ T_{AB} = \frac{1}{r_{\text{total}}} = \frac{1}{\frac{1}{T_A} + \frac{1}{T_B}} = \frac{T_A T_B}{T_A + T_B} ]
2.3 Sequential Work (Series Work)
If A works for (t_1) hours, then B for (t_2) hours, and the job is finished:
[ W = r_A t_1 + r_B t_2 ]
Given (W = 1) (full job), we can solve for missing times.
2.4 Work Done by a Group
If a group of (n) people, each with different rates (r_1, r_2, \dots, r_n):
[ r_{\text{group}} = \sum_{i=1}^{n} r_i ]
Time for the group:
[ t_{\text{group}} = \frac{1}{r_{\text{group}}} ]
3. Common Variations & Important Relationships
| Scenario | Formula | Notes |
|---|---|---|
| One person’s rate after replacement | If A works (t) hrs then B completes the rest: (\displaystyle r_B = \frac{1 - r_A t}{T_B - t}) |
Use (W=1). |
| Rate of one person after change in work | If A’s rate changes from (r_A) to (r'_A) and total time changes from (T) to (T'): (\displaystyle r'A = \frac{1}{T'} - \sum{i\neq A} r_i) |
Useful in “same time, different workers” problems. |
| Work in terms of “days” or “hours” | Replace hours with days: 1 day = 24 hrs. | Always keep units consistent. |
| “Speed” of work | Speed of work is (r). If time is halved, speed doubles. | Helpful for “if X does it in Y days, who does it in Z days?” |
4. Tricky Points & Pitfalls
| Pitfall | Explanation | Avoidance |
|---|---|---|
| Assuming linearity incorrectly | Work is linear in time only if the worker’s rate is constant. In real life, fatigue or rest breaks can alter rates. | For exam problems, rates are constant unless stated otherwise. |
| Misreading “in same time” | “In the same time” may refer to the time taken by one person or the whole group. | Carefully parse the sentence. |
| Forgetting to convert units | Mixing hours and days, or minutes and hours, leads to wrong answers. | Convert all times to a single unit before calculation. |
| Adding times instead of rates | Time to complete tasks together is not the sum of individual times. | Use reciprocal of rates. |
| Ignoring the “work left” | When a worker stops early, the remaining work must be computed before the next worker starts. | Use (W_{\text{left}} = 1 - r_{\text{worked}} \times t_{\text{worked}}). |
| Assuming equal rates in “same work” problems | “Same work” refers to amount of work, not rate. | Clarify: If A does the same work as B, each completes 1 unit in their own time. |
5. Practice Problem
Problem (Hard – 10 marks)
A and B can complete a piece of work in 15 and 20 days respectively. They start together. After 4 days, C joins with a rate equal to the average of A’s and B’s rates. How many days will it take them to finish the remaining work?
Step‑by‑Step Solution
-
Compute individual rates
[ r_A = \frac{1}{15},\text{work/day}, \quad r_B = \frac{1}{20},\text{work/day} ] -
Work done in first 4 days (A+B)
[ W_{\text{first}} = (r_A + r_B) \times 4 = \left(\frac{1}{15} + \frac{1}{20}\right) \times 4 = \left(\frac{4}{60}\right) \times 4 = \frac{16}{60} = \frac{4}{15} ] -
Work remaining
[ W_{\text{rem}} = 1 - \frac{4}{15} = \frac{11}{15} ] -
Rate of C – average of A and B’s rates
[ r_C = \frac