Nagaland Police Sub-Inspector (SI) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Study Notes (IIT‑JEE / Competitive Exams)

Topic: Time & Work
Exam: Nagaland Police Sub‑Inspector (SI) – Quantitative Aptitude
Focus: Rigorous, exam‑oriented explanation, derivations, key formulas, tricky points, and a hard practice question.


1. Core Concept

Time & Work deals with how long it takes (time) for a set of workers (or machines, people, etc.) to complete a task (work), given their individual rates of work.

  • Work (W) – a unitless quantity that represents the amount of job to be done.
  • Rate of Work (r) – amount of work done in one unit of time.
  • Time (t) – duration needed to complete the work.

Fundamental Relation

[ \boxed{W = r \times t} ]

or, solving for any variable:

[ t = \frac{W}{r}, \quad r = \frac{W}{t} ]


2. Deriving Key Formulas

2.1 Individual Rates

If person A completes a job in (T_A) hours,

[ r_A = \frac{1}{T_A} \quad(\text{work per hour}) ]

Similarly for B in (T_B) hours:

[ r_B = \frac{1}{T_B} ]

2.2 Combined Rate (Parallel Work)

When A and B work together:

[ r_{\text{total}} = r_A + r_B = \frac{1}{T_A} + \frac{1}{T_B} ]

Thus time to finish the same job together:

[ T_{AB} = \frac{1}{r_{\text{total}}} = \frac{1}{\frac{1}{T_A} + \frac{1}{T_B}} = \frac{T_A T_B}{T_A + T_B} ]

2.3 Sequential Work (Series Work)

If A works for (t_1) hours, then B for (t_2) hours, and the job is finished:

[ W = r_A t_1 + r_B t_2 ]

Given (W = 1) (full job), we can solve for missing times.

2.4 Work Done by a Group

If a group of (n) people, each with different rates (r_1, r_2, \dots, r_n):

[ r_{\text{group}} = \sum_{i=1}^{n} r_i ]

Time for the group:

[ t_{\text{group}} = \frac{1}{r_{\text{group}}} ]


3. Common Variations & Important Relationships

Scenario Formula Notes
One person’s rate after replacement If A works (t) hrs then B completes the rest:
(\displaystyle r_B = \frac{1 - r_A t}{T_B - t})
Use (W=1).
Rate of one person after change in work If A’s rate changes from (r_A) to (r'_A) and total time changes from (T) to (T'):
(\displaystyle r'A = \frac{1}{T'} - \sum{i\neq A} r_i)
Useful in “same time, different workers” problems.
Work in terms of “days” or “hours” Replace hours with days: 1 day = 24 hrs. Always keep units consistent.
“Speed” of work Speed of work is (r). If time is halved, speed doubles. Helpful for “if X does it in Y days, who does it in Z days?”

4. Tricky Points & Pitfalls

Pitfall Explanation Avoidance
Assuming linearity incorrectly Work is linear in time only if the worker’s rate is constant. In real life, fatigue or rest breaks can alter rates. For exam problems, rates are constant unless stated otherwise.
Misreading “in same time” “In the same time” may refer to the time taken by one person or the whole group. Carefully parse the sentence.
Forgetting to convert units Mixing hours and days, or minutes and hours, leads to wrong answers. Convert all times to a single unit before calculation.
Adding times instead of rates Time to complete tasks together is not the sum of individual times. Use reciprocal of rates.
Ignoring the “work left” When a worker stops early, the remaining work must be computed before the next worker starts. Use (W_{\text{left}} = 1 - r_{\text{worked}} \times t_{\text{worked}}).
Assuming equal rates in “same work” problems “Same work” refers to amount of work, not rate. Clarify: If A does the same work as B, each completes 1 unit in their own time.

5. Practice Problem

Problem (Hard – 10 marks)

A and B can complete a piece of work in 15 and 20 days respectively. They start together. After 4 days, C joins with a rate equal to the average of A’s and B’s rates. How many days will it take them to finish the remaining work?

Step‑by‑Step Solution

  1. Compute individual rates
    [ r_A = \frac{1}{15},\text{work/day}, \quad r_B = \frac{1}{20},\text{work/day} ]

  2. Work done in first 4 days (A+B)
    [ W_{\text{first}} = (r_A + r_B) \times 4 = \left(\frac{1}{15} + \frac{1}{20}\right) \times 4 = \left(\frac{4}{60}\right) \times 4 = \frac{16}{60} = \frac{4}{15} ]

  3. Work remaining
    [ W_{\text{rem}} = 1 - \frac{4}{15} = \frac{11}{15} ]

  4. Rate of C – average of A and B’s rates
    [ r_C = \frac