Time & Work – Study Notes

(For the Ladakh Patwari / Lekhpal Training Program – Quantitative Aptitude)


1. Simple Explanation

Time & Work deals with the relationship between the amount of work done, the rate at which it is done, and the time taken.

  • Work – a task that can be completed (e.g., measuring a plot, preparing a ledger).
  • Rate of work – the amount of work one person can do in a unit time (usually expressed as work per day).
  • Time – the duration required to finish the work.

The basic equation is:

[ \text{Work} = \text{Rate} \times \text{Time} ]

Rearranging gives the three common forms:

Formula What it gives Symbolic form
Time How long to finish a given work (T = \dfrac{W}{R})
Rate How fast a person works (R = \dfrac{W}{T})
Work How much is completed (W = R \times T)

When more than one person works together, their rates add because each contributes to the same unit of work.


2. Key Points (Quick Reference)

Concept How to use Formula
Single worker Calculate time, rate, or work using one of the basic forms. (T = \dfrac{W}{R})
Multiple workers working together Sum their rates to get the combined rate. (R_{\text{combined}} = R_1 + R_2 + \dots)
Partial work Work done by any worker for a part of the time. (W_{\text{partial}} = R \times t_{\text{partial}})
Work left after some time Subtract partial work from total work. (W_{\text{left}} = W_{\text{total}} - W_{\text{partial}})
Inverse relationships If one worker takes twice as long, his rate is half. (R_2 = \dfrac{R_1}{2})
Working in reverse order When workers finish a task at the same time, find the time taken by each. (\dfrac{1}{T} = \dfrac{1}{T_1} + \dfrac{1}{T_2})
Work‐time diagrams Helpful for visualising who works when. —

3. Worked Example

Problem
A patwari (P) can prepare a land‑record booklet in 8 days.
A junior clerk (J) can do the same job in 12 days.
They start together. After 3 days, P leaves. J continues alone until the job is finished.
How many days did J work after P left? How many days in total did the job take?

Step‑by‑Step Solution

  1. Determine individual rates
    [ R_P = \frac{1 \text{ booklet}}{8 \text{ days}} = \frac{1}{8}\text{ booklet/day} ] [ R_J = \frac{1}{12}\text{ booklet/day} ]

  2. Work done together in the first 3 days
    [ W_{\text{together}} = (R_P + R_J) \times 3 = \left(\frac{1}{8} + \frac{1}{12}\right) \times 3 ] [ = \left(\frac{3}{24} + \frac{2}{24}\right) \times 3 = \frac{5}{24} \times 3 = \frac{5}{8}\text{ booklet} ]

  3. Work remaining after 3 days
    [ W_{\text{left}} = 1 - \frac{5}{8} = \frac{3}{8}\text{ booklet} ]

  4. Time J needs to finish the remaining work alone
    [ T_J = \frac{W_{\text{left}}}{R_J} = \frac{\frac{3}{8}}{\frac{1}{12}} = \frac{3}{8} \times 12 = \frac{36}{8} = 4.5 \text{ days} ]

  5. Total time taken
    [ T_{\text{total}} = 3 \text{ days (together)} + 4.5 \text{ days (J alone)} = 7.5 \text{ days} ]

Answer

  • J worked 4.5 days after P left.
  • The job took a total of 7.5 days.

4. Quick Revision Summary

Question Answer
What is the basic equation of Time & Work? (W = R \times T)
How do you find the combined rate of two workers? Add their individual rates: (R_{\text{c}} = R_1 + R_2).
If one worker takes twice as long as another, how are their rates related? The slower worker’s rate is half the faster worker’s rate.
How to calculate work done by a worker in part of the time? (W_{\text{partial}} = R \times t_{\text{partial}}).
How to find remaining work after some time has passed? Subtract partial work from total work: (W_{\text{