Chandigarh Police Constable /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Study Notes

(Target: IIT‑JEE & other competitive exams)

Author: Expert Teacher
Date: 25 Oct 2026


1. Introduction

The Time‑Work problem is a staple in quantitative aptitude. It tests your ability to translate a real‑world scenario into algebraic equations and to manipulate fractions, rates, and times efficiently.

Key Idea:
Work (amount of job) is an additive quantity. Rate is the speed at which work is done.
The fundamental relation is

[ \boxed{\text{Work} = \text{Rate} \times \text{Time}} ]


2. Fundamental Definitions

Symbol Meaning Unit
(W) Total amount of work (e.g., 1 job = 1 unit) job
(R) Rate of doing work (jobs per unit time) jobs / hour
(t) Time taken hour
(T) Total time to finish the job hour

3. Core Derivations

3.1 Single Worker

If a worker completes a job in (t) hours, his rate is

[ R = \frac{W}{t} ]

Conversely, if (R) is known, time required is

[ t = \frac{W}{R} ]

3.2 Two or More Workers Working Simultaneously

Let workers (A, B, C, \dots) have rates (R_A, R_B, R_C, \dots).
The combined rate is the sum:

[ R_{\text{total}} = R_A + R_B + R_C + \dots ]

Hence the time to finish the job together:

[ t_{\text{total}} = \frac{W}{R_{\text{total}}} = \frac{W}{R_A + R_B + R_C + \dots} ]

Equivalent Inverse‑Rate Formula
[ \frac{1}{t_{\text{total}}} = \frac{1}{t_A} + \frac{1}{t_B} + \frac{1}{t_C} + \dots ] where (t_A = \frac{W}{R_A}), etc.

3.3 Partial Work by a Worker

If a worker completes a fraction of the job, say (p%) of (W), the remaining work is ((1-p)% \times W).
The time to finish the remaining part is therefore

[ t_{\text{remaining}} = \frac{(1-p)}{100}, W \Big/ R_{\text{others}} ]


4. Common Tricky Points

Scenario Pitfall How to Resolve
One worker leaves after some time Forgetting to subtract the work already done Compute work done: (R_{\text{worker}}\times t_{\text{worked}}). Subtract from (W).
Different workers start at different times Mixing up the order of operations Treat each segment separately: compute work done in each segment, then add.
Work left is given as a percentage Misinterpreting “remaining” vs “completed” If “(p%) of work left”, remaining work = (p/100 \times W).
Rates expressed in “jobs per hour” vs “hours per job” Unit confusion Convert to the same unit (best is “jobs per hour”).
Work done in a day vs week Forgetting time units Keep consistent units; convert days to hours if needed.
Machines vs people Ignoring efficiency differences Treat them as workers; just rates change.

5. Strategy Checklist

  1. Assign variables to unknowns: rates, times, or work fractions.
  2. Write the Work = Rate × Time equations for each scenario.
  3. Sum rates when workers act together.
  4. Use inverse‑rate formula for quick mental checks.
  5. Check units after each step.
  6. Verify with a sanity check (e.g., if one worker is twice as fast, the time should roughly halve).

6. Sample Problems & Solutions

6.1 Classic Two‑Worker Problem

Problem: A can finish a job in 12 hrs, B in 18 hrs. How long will they take together?
Solution:
[ \frac{1}{t} = \frac{1}{12} + \frac{1}{18} = \frac{3+2}{36} = \frac{5}{36} ] [ t = \frac{36}{5} = 7.2 \text{ hrs} ]


6.2 Worker Leaves After Partial Work

Problem: A and B work together. After 4 hrs, A leaves. B alone finishes the job in 6 hrs. Find the time A would have taken alone.
Solution:
Let (R_A = r), (R_B = s).
Work done together in 4 hrs: (4(r+s)).
Work left for B: (W - 4(r+s) = 6s).
So (W = 4(r+s) + 6s =