Time & Work – Study Notes
(Target: IIT‑JEE & other competitive exams)
Author: Expert Teacher
Date: 25 Oct 2026
1. Introduction
The Time‑Work problem is a staple in quantitative aptitude. It tests your ability to translate a real‑world scenario into algebraic equations and to manipulate fractions, rates, and times efficiently.
Key Idea:
Work (amount of job) is an additive quantity. Rate is the speed at which work is done.
The fundamental relation is
[ \boxed{\text{Work} = \text{Rate} \times \text{Time}} ]
2. Fundamental Definitions
| Symbol | Meaning | Unit |
|---|---|---|
| (W) | Total amount of work (e.g., 1 job = 1 unit) | job |
| (R) | Rate of doing work (jobs per unit time) | jobs / hour |
| (t) | Time taken | hour |
| (T) | Total time to finish the job | hour |
3. Core Derivations
3.1 Single Worker
If a worker completes a job in (t) hours, his rate is
[ R = \frac{W}{t} ]
Conversely, if (R) is known, time required is
[ t = \frac{W}{R} ]
3.2 Two or More Workers Working Simultaneously
Let workers (A, B, C, \dots) have rates (R_A, R_B, R_C, \dots).
The combined rate is the sum:
[ R_{\text{total}} = R_A + R_B + R_C + \dots ]
Hence the time to finish the job together:
[ t_{\text{total}} = \frac{W}{R_{\text{total}}} = \frac{W}{R_A + R_B + R_C + \dots} ]
Equivalent Inverse‑Rate Formula
[
\frac{1}{t_{\text{total}}}
= \frac{1}{t_A} + \frac{1}{t_B} + \frac{1}{t_C} + \dots
]
where (t_A = \frac{W}{R_A}), etc.
3.3 Partial Work by a Worker
If a worker completes a fraction of the job, say (p%) of (W), the remaining work is ((1-p)% \times W).
The time to finish the remaining part is therefore
[ t_{\text{remaining}} = \frac{(1-p)}{100}, W \Big/ R_{\text{others}} ]
4. Common Tricky Points
| Scenario | Pitfall | How to Resolve |
|---|---|---|
| One worker leaves after some time | Forgetting to subtract the work already done | Compute work done: (R_{\text{worker}}\times t_{\text{worked}}). Subtract from (W). |
| Different workers start at different times | Mixing up the order of operations | Treat each segment separately: compute work done in each segment, then add. |
| Work left is given as a percentage | Misinterpreting “remaining” vs “completed” | If “(p%) of work left”, remaining work = (p/100 \times W). |
| Rates expressed in “jobs per hour” vs “hours per job” | Unit confusion | Convert to the same unit (best is “jobs per hour”). |
| Work done in a day vs week | Forgetting time units | Keep consistent units; convert days to hours if needed. |
| Machines vs people | Ignoring efficiency differences | Treat them as workers; just rates change. |
5. Strategy Checklist
- Assign variables to unknowns: rates, times, or work fractions.
- Write the Work = Rate × Time equations for each scenario.
- Sum rates when workers act together.
- Use inverse‑rate formula for quick mental checks.
- Check units after each step.
- Verify with a sanity check (e.g., if one worker is twice as fast, the time should roughly halve).
6. Sample Problems & Solutions
6.1 Classic Two‑Worker Problem
Problem: A can finish a job in 12 hrs, B in 18 hrs. How long will they take together?
Solution:
[ \frac{1}{t} = \frac{1}{12} + \frac{1}{18} = \frac{3+2}{36} = \frac{5}{36} ] [ t = \frac{36}{5} = 7.2 \text{ hrs} ]
6.2 Worker Leaves After Partial Work
Problem: A and B work together. After 4 hrs, A leaves. B alone finishes the job in 6 hrs. Find the time A would have taken alone.
Solution:
Let (R_A = r), (R_B = s).
Work done together in 4 hrs: (4(r+s)).
Work left for B: (W - 4(r+s) = 6s).
So (W = 4(r+s) + 6s =