Time & Work – Advanced University‑Level Study Notes

(For the Andaman & Nicobar Islands PSC – Quantitative Aptitude)

Prerequisites – Basic algebra, fractions, proportions, simple linear equations.
Goal – Master the Time‑Work framework, derive formulas from first principles, explore non‑standard scenarios, and solve a challenging problem.


1. Foundations – Work as a Quantitative Entity

1.1 Definition of Work

  • Work is any task that consumes time and effort.
  • Quantify work in “man‑hours” (or “person‑hours”):
    [ \text{Work} = \text{Rate} \times \text{Time} ] where Rate = units of work done per hour by a person.

1.2 Rate of Work

  • If a person completes (W) units of work in (T) hours, his rate (r) is: [ r = \frac{W}{T}\quad \text{(units per hour)} ]
  • For a group of (n) persons working together, assuming ideal additive rates: [ R_{\text{group}} = \sum_{i=1}^{n} r_i ] (Later we will discuss non‑idealities.)

1.3 Work Done by Multiple People

  • Formula: [ \boxed{W = R_{\text{total}} \times T} ] where (R_{\text{total}}) is the combined rate.

  • Alternative viewpoint:
    The total work requirement (W) is fixed for a given problem.
    The time (T) is variable depending on the effective rate.


2. Core Time‑Work Relations

2.1 Single Person, Single Task

[ T = \frac{W}{r} ]

2.2 Two (or More) Persons Working Together

Let (r_1, r_2, \dots, r_n) be individual rates.

[ T = \frac{W}{\sum_{i=1}^{n} r_i} ]

2.3 Different Persons Working for Different Durations

Suppose Person A works (t_1) hours, Person B works (t_2) hours, etc.

[ W_{\text{total}} = r_1 t_1 + r_2 t_2 + \dots + r_n t_n ]

This is the additive work model.

2.4 Work Done When One Person Leaves or Arrives

If a person stops after (t_k) hours, his contribution is (r_k t_k).
The remaining persons continue at their combined rate.


3. Deriving the General Formula from First Principles

3.1 Starting Point – Differential Approach

Let (w(t)) be the cumulative work completed up to time (t).

[ \frac{dw}{dt} = R(t) ]

where (R(t)) is the instantaneous total rate (possibly time‑dependent).
Integrating:

[ w(T) = \int_0^T R(t),dt = W ]

For constant rates over intervals, this reduces to simple multiplication.

3.2 Piecewise Constant Rates

If the workforce changes at times (t_1, t_2, \dots):

[ W = \sum_{k=1}^{m} R_k \cdot (t_k - t_{k-1}) ]

with (t_0 = 0), (t_m = T).
This covers “work done by different teams at different times”.

3.3 Continuous Variations – e.g., Training or Fatigue

If rate (r(t) = r_0 (1 - \alpha t)) (linear fatigue):

[ W = \int_0^T r_0 (1 - \alpha t),dt = r_0 \left( T - \frac{\alpha}{2} T^2 \right) ]

Solving for (T) yields a quadratic; this is rarely used in PSC questions but illustrates advanced modeling.


4. Edge Cases & Common Pitfalls

Scenario Typical Mistake Correct Approach
Two people start, one leaves early Treat remaining person as not starting from zero. Compute work done by first person until exit, then use remaining person’s rate for rest.
Work shared but rates not equal Assume equal division of work. Use individual rates to compute total rate.
Different units Mix hours, minutes, days without conversion. Convert all time units to a common base (e.g., hours).
Work “per day” vs “per hour” Forget that “per day” implies 24 h. Clarify working hours; e.g., if 8‑hour day, rate per day = 8 × (rate per hour).
Non‑linear rates Apply constant‑rate formula. Use integral or piecewise sums if rates change.
Negative rates Occurs when a person “undoes” work. Consider subtraction in total rate: (R_{\text{total}} = r_1 + r_2 - r_3).

5. Advanced Topics

5.1 Parallel vs Sequential Work

  • Parallel: People working simultaneously on the same task.
  • Sequential: One person starts, then another takes over.
    • Sequential time: (T = T_A + T_B).
    • Parallel time: (T = \frac{W}{r_A + r_B}).

5.2 Machine & Human Hybrid Work

Let (m) be machine rate, (p) be human rate.
If the machine can work continuously (24 h) and human only 8 h/day, adjust rates accordingly.

5.3 Work with Partial Effort

If a person works only part of a day, use fraction of total rate:
(r_{\text{effective}} = r \times \frac{\text{working hours}}{24}).


6. Challenging Problem (Solution Included)

Problem
Three workers, A, B, and C, can complete a certain job in 8, 12, and 20 days respectively, working 8 hours each day.

  1. They work together for 4 days.
  2. After that, A leaves, and B and C continue.
  3. Then, after 3 more