Time & work

Commercial Maths · free study notes · Updated

Time & Work – Quick Study Notes

(For the Andaman & Nicobar Islands Forest Guard Quantitative Aptitude Test)


1. Simple Explanation

Time & work problems ask you to relate how long it takes a person (or a group of people) to finish a job, given how much of the job they can finish in a certain time.

  • Work = the job that has to be completed.
  • Rate of work = amount of work done per unit time (e.g., units per day).
  • Time = how long it takes to finish the job.

The basic relationship is:

[ \text{Work} = \text{Rate} \times \text{Time} ]

or, solved for any one variable:

[ \text{Rate} = \frac{\text{Work}}{\text{Time}},\qquad \text{Time} = \frac{\text{Work}}{\text{Rate}} ]

In most exam questions we treat Work = 1 job (100 % of the job).


2. Key Points & Formulas

Concept Formula Example
Single worker (R = \frac{1}{T}) A finishes a job in 10 days → (R_A = \frac{1}{10}) job/day
Work done in (t) days (W = R \times t) A works 4 days → (W = \frac{1}{10}\times4 = \frac{2}{5})
Combined work of two workers (R_{\text{total}} = R_A + R_B) (R_{\text{total}} = \frac{1}{10}+\frac{1}{12})
Time for combined work (T_{\text{total}} = \frac{1}{R_{\text{total}}}) (T = \frac{1}{\frac{1}{10}+\frac{1}{12}})
Work after one leaves (T_{\text{remaining}} = \frac{W_{\text{remaining}}}{R_B}) If job left after 4 days, (W_{\text{remaining}}=1-W_{\text{done}})
Work completed by a part‑time worker (W = R \times \text{(hours worked per day)}) Worker works 3 hrs/day, rate = 0.02 job/hr → (W = 0.02\times3 = 0.06) job/day
Percentage of job done (% = R \times 100%) per day (R=\frac{1}{20}) → 5 % per day
Work with more workers If (n) workers with equal rate (R), (R_{\text{total}} = nR) 5 workers each at (\frac{1}{15}) job/day → (R_{\text{total}} = \frac{5}{15}=\frac{1}{3})
Time when one worker stops working (T_{\text{new}} = \frac{1}{R_{\text{remaining}}}) After A leaves, only B works
Halving work (T_{\text{new}} = 2T_{\text{old}}) if work is halved If A does half the job, he needs twice the time
Extra workers needed (n = \frac{R_{\text{desired}}}{R_{\text{current}}}) To finish in half time, double the rate → double number of workers

Important shortcuts

  1. Work done by a worker in (t) days
    [ \text{Work} = \frac{t}{T_{\text{worker}}} ] (e.g., A works 3 days out of 8 days → (\frac{3}{8}) of job)

  2. Work left after (t) days
    [ W_{\text{left}} = 1 - \frac{t}{T_{\text{worker}}} ]

  3. If two workers work together for (t) days, then
    [ W_{\text{done}} = \frac{t}{T_A} + \frac{t}{T_B} ]


3. Worked Example

Problem
A can complete a job in 12 days, B can do the same in 15 days.
They work together for 4 days. After that A stops working.
How many days will B alone take to finish the remaining job?

Step‑by‑Step Solution

Step What to compute Calculation Result
1 Rate of A (R_A = \frac{1}{12}) (0.0833) job/day
2 Rate of B (R_B = \frac{1}{15}) (0.0667) job/day

Your note