Time & Work – Quick Study Notes
(For the Andaman & Nicobar Islands Forest Guard Quantitative Aptitude Test)
1. Simple Explanation
Time & work problems ask you to relate how long it takes a person (or a group of people) to finish a job, given how much of the job they can finish in a certain time.
- Work = the job that has to be completed.
- Rate of work = amount of work done per unit time (e.g., units per day).
- Time = how long it takes to finish the job.
The basic relationship is:
[ \text{Work} = \text{Rate} \times \text{Time} ]
or, solved for any one variable:
[ \text{Rate} = \frac{\text{Work}}{\text{Time}},\qquad \text{Time} = \frac{\text{Work}}{\text{Rate}} ]
In most exam questions we treat Work = 1 job (100 % of the job).
2. Key Points & Formulas
| Concept | Formula | Example |
|---|---|---|
| Single worker | (R = \frac{1}{T}) | A finishes a job in 10 days → (R_A = \frac{1}{10}) job/day |
| Work done in (t) days | (W = R \times t) | A works 4 days → (W = \frac{1}{10}\times4 = \frac{2}{5}) |
| Combined work of two workers | (R_{\text{total}} = R_A + R_B) | (R_{\text{total}} = \frac{1}{10}+\frac{1}{12}) |
| Time for combined work | (T_{\text{total}} = \frac{1}{R_{\text{total}}}) | (T = \frac{1}{\frac{1}{10}+\frac{1}{12}}) |
| Work after one leaves | (T_{\text{remaining}} = \frac{W_{\text{remaining}}}{R_B}) | If job left after 4 days, (W_{\text{remaining}}=1-W_{\text{done}}) |
| Work completed by a part‑time worker | (W = R \times \text{(hours worked per day)}) | Worker works 3 hrs/day, rate = 0.02 job/hr → (W = 0.02\times3 = 0.06) job/day |
| Percentage of job done | (% = R \times 100%) per day | (R=\frac{1}{20}) → 5 % per day |
| Work with more workers | If (n) workers with equal rate (R), (R_{\text{total}} = nR) | 5 workers each at (\frac{1}{15}) job/day → (R_{\text{total}} = \frac{5}{15}=\frac{1}{3}) |
| Time when one worker stops working | (T_{\text{new}} = \frac{1}{R_{\text{remaining}}}) | After A leaves, only B works |
| Halving work | (T_{\text{new}} = 2T_{\text{old}}) if work is halved | If A does half the job, he needs twice the time |
| Extra workers needed | (n = \frac{R_{\text{desired}}}{R_{\text{current}}}) | To finish in half time, double the rate → double number of workers |
Important shortcuts
-
Work done by a worker in (t) days
[ \text{Work} = \frac{t}{T_{\text{worker}}} ] (e.g., A works 3 days out of 8 days → (\frac{3}{8}) of job) -
Work left after (t) days
[ W_{\text{left}} = 1 - \frac{t}{T_{\text{worker}}} ] -
If two workers work together for (t) days, then
[ W_{\text{done}} = \frac{t}{T_A} + \frac{t}{T_B} ]
3. Worked Example
Problem
A can complete a job in 12 days, B can do the same in 15 days.
They work together for 4 days. After that A stops working.
How many days will B alone take to finish the remaining job?
Step‑by‑Step Solution
| Step | What to compute | Calculation | Result |
|---|---|---|---|
| 1 | Rate of A | (R_A = \frac{1}{12}) | (0.0833) job/day |
| 2 | Rate of B | (R_B = \frac{1}{15}) | (0.0667) job/day |