1. Simple Explanation

Concept What it means Example
Work The total amount of job that must be done. It can be thought of as “1 job” or “100 % of the job”. W = 1 (one whole task)
Rate of work How much of the job a person (or team) can finish in one unit of time. Person A does 1/8 of the job in one day → Rateₐ = 1/8 job/day
Time How long it takes to complete the job. If A alone takes 8 days → Tₐ = 8 days
Work‑Rate‑Time relation Work = Rate × Time For A: 1 = (1/8) × 8

When multiple people work together, their rates add up.
When someone leaves earlier, you adjust the time they actually worked.


2. Key Points (Quick Reference)

# Formula What to calculate Notes
1 Rate = Work / Time Rate of a person If Work = 1 → Rate = 1/Time
2 Time = Work / Rate How long it takes for one person Time = 1 / Rate
3 Work = Rate × Time Amount of work done in a given time Useful for partial work
4 Combined Rate = Rate₁ + Rate₂ + … Rate when several people work together Add the individual rates
5 Total Work = Combined Rate × Time Work done by a group in a period If they work for t days
6 Work Left = Total Work – Work Done Remaining work Usually Work Left = 1 – Work Done
7 Fraction of work done Rate × Time (e.g., 0.25 of job) Express as a decimal or fraction

Approach to Solve a Problem

  1. Identify the total work – usually 1 job (100 %).
  2. Convert given times or rates into a common unit (days, hours, etc.).
  3. Compute rates for each worker using Rate = 1 / Time if only time is given.
  4. Add rates if workers work together.
  5. Use the total time worked to find work done (Rate × Time).
  6. Subtract from 1 to find the remaining work.
  7. If a worker leaves, multiply his/her rate by the actual time worked.
  8. Solve for unknown time using Time = Work / Rate.

3. Worked Example

Problem (Typical of Forest Guard exam)

A can finish a piece of work in 8 days. B can finish the same work in 12 days.
A and B work together for 2 days. After that, A leaves.
How many more days will B need to finish the remaining work?

Step‑by‑Step Solution

Step Calculation Result
1 Rate of A: (R_A = \dfrac{1}{8}) jobs/day (0.125) jobs/day
2 Rate of B: (R_B = \dfrac{1}{12}) jobs/day (0.0833) jobs/day
3 Combined rate for first 2 days: (R_{AB} = R_A + R_B = 0.125 + 0.0833 = 0.2083) jobs/day
4 Work done in 2 days: (W_{done} = R_{AB} \times 2 = 0.2083 \times 2 = 0.4166) jobs ≈ 41.67 % of the job
5 Work remaining: (W_{left} = 1 - 0.4166 = 0.5834) jobs ≈ 58.34 % of the job
6 B’s rate alone: (R_B = 0.0833) jobs/day
7 Time for B to finish remaining work: (T_B = \dfrac{W_{left}}{R_B} = \dfrac{0.5834}{0.0833} ≈ 7.0) days 7 days

Answer: B needs 7 more days to finish the remaining work.


4. Quick Revision Summary

  1. Work = 1 job (or 100 %)
  2. Rate (per day) = 1 / Time of the worker alone
  3. Combined Rate = Sum of individual rates
  4. Work done = Rate × Time
  5. Time needed = Remaining Work / Rate
  6. Remember:
    • Convert all times to the same unit (days usually).
    • Add rates when people work together.
    • Subtract the work done from 1 to get the remaining work.
    • When someone leaves, use the actual time they worked, not the full schedule.

Quick Practice Question

**