INSPIRE Scholarship /General Aptitude & Reasoning

Time & Work, Speed, Time & Distance

Quantitative Aptitude · free study notes · Updated

Time & Work, Speed & Distance – Study Notes

(For INSPIRE Scholarship – General Aptitude & Reasoning)


1. Simple Explanation

Concept What it means Key idea
Work Total amount of job that must be done (e.g., “paint a wall”) Work is rate × time
Rate How much work one person/vehicle does in one unit of time (e.g., “2 walls per day”) Rate = Work ÷ Time
Speed How fast a vehicle moves (distance covered per unit time, usually km/h or m/s) Speed = Distance ÷ Time
Distance Path covered by a moving object Distance = Speed × Time
Time Duration of completing a job or traveling Time = Distance ÷ Speed

In aptitude tests, we often have to combine these relations, e.g.:

  • Two workers start a job together, one leaves after some time.
  • Two vehicles travel towards each other and meet after a given time.
  • A worker finishes a job in a certain number of days and another worker does it in a different number of days – find the ratio of their rates.

The trick is to write down the fundamental relation for each sub‑problem, express everything in the same unit, and then solve algebraically.


2. Key Points & Formulae

Variable Symbol Formula Notes
Work (W) (W = R \times T) (R) = rate, (T) = time
Rate (R) (R = \frac{W}{T}) Rate is “work per unit time”
Time (T) (T = \frac{W}{R})
Distance (D) (D = S \times T) (S) = speed
Speed (S) (S = \frac{D}{T})
Time for distance (T) (T = \frac{D}{S})
Combined Work of (n) people (R_{\text{total}}) (R_{\text{total}} = \sum R_i) Add individual rates
Work done in parts (W_{\text{part}}) (W_{\text{part}} = R_{\text{total}} \times T_{\text{part}})
Relative Speed (meeting) (S_{\text{rel}}) (S_{\text{rel}} = S_1 + S_2) (towards each other)
Remaining Work (W_{\text{rem}}) (W_{\text{rem}} = W_{\text{total}} - W_{\text{done}})
Work‑time ratio (\frac{T_A}{T_B}) If (T_A = T_B + k) then (\frac{R_B}{R_A} = \frac{T_A}{T_B}) Use inverses of rates

Common Pseudocode for “Two workers” type problems

  1. Compute individual rates:
    (R_A = \frac{W}{T_A}), (R_B = \frac{W}{T_B})
  2. Compute combined rate: (R_{\text{total}} = R_A + R_B)
  3. If they work together for (t) days:
    (W_{\text{done}} = R_{\text{total}} \times t)
  4. Remaining work: (W_{\text{rem}} = W - W_{\text{done}})
  5. Remaining time needed by one or both workers: (T_{\text{rem}} = \frac{W_{\text{rem}}}{R_{\text{total}}}) (or by a single worker if only one works)

For speed/distance problems, the same logic applies but replace “rate” with “speed” and “work” with “distance”.


3. Worked Example

Problem

3 workers – A, B and C – can paint a wall in 8, 12 and 18 days respectively.

  1. They start together.
  2. After 4 days, C leaves.