1. Definitions & Objectives

Term Definition Objective
Cost Indirect & direct outflow of resources to produce goods/services Determine profitability, pricing, planning, control
Cost of Production Sum of all costs incurred to transform inputs into finished goods Compute cost per unit, evaluate efficiency
Cost of Goods Sold (COGS) Cost of units sold during a period Determine gross profit
Period Cost Costs expensed in the period incurred (e.g., selling, admin) Separate from product costs for accurate costing

2. Classification of Costs

Classification Criteria Examples
By Function Direct/Indirect Direct material, indirect labour
By Nature Variable, Fixed, Semi‑Variable Raw material (V), Rent (F), Salaries (Semi‑V)
By Timing Pre‑production, Production, Post‑production Pre‑production: research; Production: manufacturing; Post‑production: marketing
By Cost Behaviour Cost‑Object, Cost‑Centre, Functional (Cost‑Object) product cost; (Cost‑Centre) department cost

3. Costing Methods

Method Principle Formula/Key Points When Used
Job Costing Cost flows per job Cost of Job = Direct Materials + Direct Labour + Applied Overheads Custom orders, heterogeneous production
Process Costing Cost flows per process/department Cost per Unit = (Total Process Cost + Beginning WIP) / Units Completed Homogenous products, batch production
Standard Costing Predetermined costs Standard Cost = Standard Qty × Standard Price Cost control, variance analysis
Activity‑Based Costing (ABC) Activities drive costs ABC Cost = Σ (Cost Driver × Rate) Complex cost structures, multiple products
Marginal Costing Only variable costs considered Marginal Cost = Variable Cost per Unit Decision making, break‑even
Absorption Costing All manufacturing costs absorbed Unit Cost = Direct Materials + Direct Labour + Allocated Overhead GAAP, tax reporting

4. Determining Cost of Production

4.1 Absorption Costing

[ \text{Total Production Cost} = \text{Direct Materials} + \text{Direct Labour} + \text{Manufacturing Overheads} ]

Manufacturing Overheads
[ \text{Overheads} = \text{Fixed Overheads} + \text{Variable Overheads} ]

Unit Cost
[ \text{Unit Cost} = \frac{\text{Total Production Cost}}{\text{Total Units Produced}} ]

4.2 Marginal Costing

[ \text{Marginal Cost per Unit} = \text{Variable Direct Materials} + \text{Variable Direct Labour} + \text{Variable Overheads} ]

Contribution
[ \text{Contribution per Unit} = \text{Selling Price} - \text{Marginal Cost} ]


5. Cost Behaviour and Analysis

Behaviour Formula Key Insight
Variable Cost (VC = v \times Q) Increases linearly with output
Fixed Cost (FC) Constant irrespective of output
Total Cost (TC = FC + VC = FC + vQ) Slope = variable cost rate
Break‑Even Point (Units) (Q_{BE} = \frac{FC}{\text{Contribution per Unit}}) Output where P&L = 0
Margin of Safety (MOS = \frac{Actual Sales - Break‑Even Sales}{Actual Sales}) Cushion against sales decline

6. Cost‑Volume‑Profit (CVP) Analysis

  1. Assumptions

    • Constant selling price & unit cost
    • Linear cost behaviour
    • Single product or homogeneous mix
  2. Key Equations

    [ \begin{aligned} \text{Profit} &= (P - VC) \times Q - FC \ \text{Break‑Even (Sales)} &= \frac{FC}{\text{Contribution per Unit}} \ \text{Profit at } Q &= \left[(P - VC) \times Q\right] - FC \end{aligned} ]

  3. Sensitivity Analysis

    • Target Profit: (Q_{TP} = \frac{FC + TP}{\text{Contribution per Unit}})
    • Change in Selling Price: Impact on contribution & break‑even

7. Cost Control & Variance Analysis

Variance Formula Interpretation
Material Price Variance ((AP - SP) \times AQ) (AP) = Actual Price, (SP) = Standard Price, (AQ) = Actual Quantity
Material Quantity Variance ((AQ - SQ) \times SP) (SQ) = Standard Quantity
Labour Rate Variance ((AR - SR) \times AH) (AR) = Actual Rate, (SR) = Standard Rate, (AH) = Actual Hours
Labour Efficiency Variance ((AH - SH) \times SR) (SH) = Standard Hours
Overhead Variance ((AOH - SHO) \times AH) (AOH) = Actual Overheads, (SHO) = Standard Overheads

Key Points

  • Variances help pinpoint inefficiencies.
  • Favorable variance (negative) → cost lower than expected.
  • Unfavorable variance (positive) → cost higher.

8. Tricky Points & Common Pitfalls

Pitfall What to Watch For Fix
Confusing Fixed & Variable Overheads Some overheads are semi‑variable (e.g., electricity). Separate into fixed + variable components.
Double‑counting Direct Materials Adding raw material cost under both direct materials & overheads. Ensure overheads exclude direct material cost