1. Simple Explanation

  • Work is the amount of job that can be completed.
  • Rate of work of a person (or machine) is the amount of work he/she can finish per unit time (e.g., per hour).
  • Time is the duration needed to finish a job at a given rate.
  • The basic relationship:

[ \text{Rate} \times \text{Time} = \text{Work} ]

or, in terms of amounts,

[ \text{Work} = \frac{1}{\text{Rate of work}} \quad \text{(if Work is unit work)} ]


2. Key Points

Concept Symbol Formula Note
Unit work 1 – A job that is 100% complete
Rate of work (r) (r = \frac{\text{Work}}{\text{Time}}) Usually “work per hour”
Time needed (t) (t = \frac{\text{Work}}{r})
Combined rate (r_{\text{total}}) (r_{\text{total}} = r_1 + r_2 + \dots) For people working together
Work done together (W_{\text{together}}) (W_{\text{together}} = r_{\text{total}} \times t)
Work done separately (W_{\text{sep}}) (W_{\text{sep}} = r_1 t_1 + r_2 t_2 + \dots)
Work left (W_{\text{left}}) (W_{\text{left}} = 1 - W_{\text{sep}})
Time for a part of work (t_{\text{part}}) (t_{\text{part}} = \frac{W_{\text{part}}}{r})
Work & time interchange – (\frac{1}{r} = t) for unit work Useful for “hours per work” problems

Common Tricks

  1. Rate of two people to finish same job
    If A finishes in 8 hrs, B in 12 hrs →
    ( r_A = \frac{1}{8}), ( r_B = \frac{1}{12}).
    Combined: ( r_{AB} = \frac{1}{8} + \frac{1}{12} = \frac{5}{24}).
    Time ( = \frac{1}{r_{AB}} = \frac{24}{5} = 4.8) hrs.

  2. Work left after part is done
    After 2 hrs of A alone, then 3 hrs of B alone →
    (W_{\text{left}} = 1 - \left(\frac{2}{8} + \frac{3}{12}\right)).

  3. “Hours per work” conversion
    If a machine takes 5 hrs to complete one unit, its rate is (\frac{1}{5}) unit/hr.

  4. Work vs. Time
    If work is doubled, time doubles (keeping rate constant).


3. Worked Example

Question

A and B can complete a piece of work in 8 hrs and 12 hrs respectively.
They start together but after 3 hrs, B leaves.
A continues alone and finishes the remaining work in 2 hrs.
Find the total time taken to complete the whole work.

Solution

  1. Rates
    [ r_A = \frac{1}{8}\ \text{work/hr},\qquad r_B = \frac{1}{12}\ \text{work/hr} ]

  2. Work done together in 3 hrs
    [ W_{\text{together}} = (r_A + r_B)\times 3 = \left(\frac{1}{8} + \frac{1}{12}\right)\times 3 = \frac{5}{24}\times 3 = \frac{5}{8} ]

  3. Work left after 3 hrs
    [ W_{\text{left}} = 1 - \frac{5}{8} = \frac{3}{8} ]

  4. Time for A to finish remaining work alone
    [ t_A = \frac{W_{\text{left}}}{r_A} = \frac{\frac{3}{8}}{\frac{1}{8}} = 3 \text{ hrs} ] (But the problem states he finished in 2 hrs – this indicates a mistake; let’s recompute.)

    Re‑compute correctly: [ t_A = \frac{W_{\text{left}}}{r_A} = \frac{\frac{3}{8}}{\frac{1}{8}} = 3\text{ hrs} ] However, the statement says “finishes the remaining work in 2 hrs”; so the given data are inconsistent.
    Correct calculation:

    If A finishes in 2 hrs, the work he does is
    [ W_A = r_A \times 2 = \frac{1}{8} \times 2 = \frac{1}{4} ] Thus total work done = ( \frac{5}{8} + \frac{1}{4} = \frac{7}{8}).
    Work left uncompleted = (1 - \frac{7}{8} = \frac{1}{8}).
    This remaining (\frac{1}{8}) must be done by B after A finished, which is impossible since B left.
    Therefore the correct scenario is:

    *Work left after 3 hrs = (\frac{3}{8}).
    *Time required by A to finish = (\frac{3}{8} \div \frac{1}{8} = 3) hrs.

    So total time = (3 + 3 = 6) hrs.

Answer: 6 hours.

(Note: Always double‑check the data; inconsistent statements can lead to confusion.)


4. Quick Revision Summary

  • Rate = Work ÷ Time
  • Time = Work ÷ Rate
  • Combined rate

Your note