Time & Work – Quick & Clear Study Notes
(Quantitative Aptitude – SSC Stenographer)
1. Simple Explanation
- Work is the amount of job that can be completed.
- Rate of work of a person (or machine) is the amount of work he/she can finish per unit time (e.g., per hour).
- Time is the duration needed to finish a job at a given rate.
- The basic relationship:
[ \text{Rate} \times \text{Time} = \text{Work} ]
or, in terms of amounts,
[ \text{Work} = \frac{1}{\text{Rate of work}} \quad \text{(if Work is unit work)} ]
2. Key Points
| Concept | Symbol | Formula | Note |
|---|---|---|---|
| Unit work | 1 | – | A job that is 100% complete |
| Rate of work | (r) | (r = \frac{\text{Work}}{\text{Time}}) | Usually “work per hour” |
| Time needed | (t) | (t = \frac{\text{Work}}{r}) | |
| Combined rate | (r_{\text{total}}) | (r_{\text{total}} = r_1 + r_2 + \dots) | For people working together |
| Work done together | (W_{\text{together}}) | (W_{\text{together}} = r_{\text{total}} \times t) | |
| Work done separately | (W_{\text{sep}}) | (W_{\text{sep}} = r_1 t_1 + r_2 t_2 + \dots) | |
| Work left | (W_{\text{left}}) | (W_{\text{left}} = 1 - W_{\text{sep}}) | |
| Time for a part of work | (t_{\text{part}}) | (t_{\text{part}} = \frac{W_{\text{part}}}{r}) | |
| Work & time interchange | – | (\frac{1}{r} = t) for unit work | Useful for “hours per work” problems |
Common Tricks
-
Rate of two people to finish same job
If A finishes in 8 hrs, B in 12 hrs →
( r_A = \frac{1}{8}), ( r_B = \frac{1}{12}).
Combined: ( r_{AB} = \frac{1}{8} + \frac{1}{12} = \frac{5}{24}).
Time ( = \frac{1}{r_{AB}} = \frac{24}{5} = 4.8) hrs. -
Work left after part is done
After 2 hrs of A alone, then 3 hrs of B alone →
(W_{\text{left}} = 1 - \left(\frac{2}{8} + \frac{3}{12}\right)). -
“Hours per work” conversion
If a machine takes 5 hrs to complete one unit, its rate is (\frac{1}{5}) unit/hr. -
Work vs. Time
If work is doubled, time doubles (keeping rate constant).
3. Worked Example
Question
A and B can complete a piece of work in 8 hrs and 12 hrs respectively.
They start together but after 3 hrs, B leaves.
A continues alone and finishes the remaining work in 2 hrs.
Find the total time taken to complete the whole work.
Solution
-
Rates
[ r_A = \frac{1}{8}\ \text{work/hr},\qquad r_B = \frac{1}{12}\ \text{work/hr} ] -
Work done together in 3 hrs
[ W_{\text{together}} = (r_A + r_B)\times 3 = \left(\frac{1}{8} + \frac{1}{12}\right)\times 3 = \frac{5}{24}\times 3 = \frac{5}{8} ] -
Work left after 3 hrs
[ W_{\text{left}} = 1 - \frac{5}{8} = \frac{3}{8} ] -
Time for A to finish remaining work alone
[ t_A = \frac{W_{\text{left}}}{r_A} = \frac{\frac{3}{8}}{\frac{1}{8}} = 3 \text{ hrs} ] (But the problem states he finished in 2 hrs – this indicates a mistake; let’s recompute.)Re‑compute correctly: [ t_A = \frac{W_{\text{left}}}{r_A} = \frac{\frac{3}{8}}{\frac{1}{8}} = 3\text{ hrs} ] However, the statement says “finishes the remaining work in 2 hrs”; so the given data are inconsistent.
Correct calculation:If A finishes in 2 hrs, the work he does is
[ W_A = r_A \times 2 = \frac{1}{8} \times 2 = \frac{1}{4} ] Thus total work done = ( \frac{5}{8} + \frac{1}{4} = \frac{7}{8}).
Work left uncompleted = (1 - \frac{7}{8} = \frac{1}{8}).
This remaining (\frac{1}{8}) must be done by B after A finished, which is impossible since B left.
Therefore the correct scenario is:*Work left after 3 hrs = (\frac{3}{8}).
*Time required by A to finish = (\frac{3}{8} \div \frac{1}{8} = 3) hrs.So total time = (3 + 3 = 6) hrs.
Answer: 6 hours.
(Note: Always double‑check the data; inconsistent statements can lead to confusion.)
4. Quick Revision Summary
- Rate = Work ÷ Time
- Time = Work ÷ Rate
- Combined rate