Time & Work – Study Notes
(RRB NTPC – Quantitative Aptitude)
1. Simple Explanation
Time & Work problems ask you to find how long it takes to complete a job, how many workers are needed, or how many workers are left when the job is finished.
- Work = Quantity of a job (e.g., 1 whole job).
- Rate of work = Work done per unit time (e.g., 1 / 10 h = 0.1 job per hour).
- Work done = Rate × Time.
- Work remaining = 1 – Work done (if the whole job = 1).
Key formulas:
| Symbol | Meaning | Formula |
|---|---|---|
| (R) | Rate of a worker | (R = \frac{1}{T}) (if worker finishes job alone in (T) units) |
| (T) | Time taken by a worker to finish the whole job alone | (T = \frac{1}{R}) |
| Work done by group | (W = \sum R_i \times t) | |
| Work remaining | (W_{\text{rem}} = 1 - W_{\text{done}}) |
2. Key Points to Remember
| # | Point | Why it matters |
|---|---|---|
| 1 | Convert all times to the same unit (hrs, mins, days). | Prevents errors in addition/subtraction. |
| 2 | Rate of work is the reciprocal of the time a worker takes alone. | Gives a common ground for combining workers. |
| 3 | Work done together = sum of individual rates × common time. | Allows adding workers’ contributions. |
| 4 | If a worker leaves, subtract his/her rate from the total. | Adjusts the combined rate accordingly. |
| 5 | “Work remaining” is always expressed as a fraction of the whole job. | Needed to compute time for remaining part. |
| 6 | Beware of “not working” periods (e.g., a worker works only 5 hrs/day). | Treat those hours as zero contribution. |
| 7 | Check for feasibility: if the remaining work > possible work, the job cannot finish. | Avoid unrealistic solutions. |
| 8 | Use “parts of a job”: 1 job = 100%, 50% = 0.5, 1/4 = 0.25, etc. | Easier to handle fractions. |
3. Worked Example
Problem
3 workers A, B and C can complete a job together in 10 days.
Worker C leaves after 4 days.
How many days will the remaining two workers need to finish the job?
Step‑by‑step Solution
-
Find individual rates
- Combined rate of A, B, C:
[ R_{ABC} = \frac{1 \text{ job}}{10 \text{ days}} = 0.1 \text{ job/day} ] - Let (R_A, R_B, R_C) be their rates.
[ R_A + R_B + R_C = 0.1 ]
- Combined rate of A, B, C:
-
Work done in first 4 days
[ W_{\text{done}} = R_{ABC} \times 4 = 0.1 \times 4 = 0.4 \text{ job} ] -
Remaining work
[ W_{\text{rem}} = 1 - 0.4 = 0.6 \text{ job} ] -
Rate of A and B together
[ R_{AB} = R_{ABC} - R_C = 0.1 - R_C ] But we don’t know (R_C) individually.
However, we can express (R_C) in terms of (R_{AB}):From (R_A + R_B + R_C = 0.1): [ R_{AB} = 0.1 - R_C ] So (R_{AB}) is simply the remaining part of the total rate.
-
Use the remaining work and rate
Since (R_{AB}) is the combined rate of A & B, the time needed for the remaining 0.6 job is: [ t = \frac{W_{\text{rem}}}{R_{AB}} ]But we need (R_{AB}).
We can find it by noting that the job would have been finished in 10 days with all three.
First 4 days done by all → remaining 6 days would have been by all too.
So in 6 days, all three would have completed the remaining 0.6 job:[ R_{ABC} \times 6 = 0.1 \times 6 = 0.6 ]
Thus, in those 6 days, A, B, C together did 0.6 job.
Since C worked only 4 days, in those 6 days C contributed: [ R_C \times 4 = \text{(C’s contribution in first 4 days)} = ? ] But we can avoid this by a simpler approach:Alternative approach
After C leaves, the job left is 0.6.
In the original plan, the remaining 6 days (from day 4 to day 10) would have been worked by all three.
Since C works only 4 days, his contribution in those 6 days would be 0 days.
So the work that would have been done by C in those 6 days is not counted.
Therefore, the combined rate of A & B must be larger than 0.1 to finish 0.6 in 6 days.Let’s compute directly:
In 6 days, A & B together must do 0.6 job.
So their combined rate: [ R_{AB} = \frac{0.6}{6} = 0.1 \text{ job/day} ] Interestingly, (R_{AB} = 0.1) – same as the original combined rate.
Hence, after C leaves, A & B together still work at 0.1 job/day. -
Time needed for A & B
[ t = \frac{0.6}{0.1} = 6 \text{ days} ]
**