Time & Work – Study Notes
(RPF Constable – Quantitative Aptitude)
1. Simple Explanation
Time & Work problems ask you to find how long it takes to finish a job (or how many people are needed) when you know the working rates of one or more workers.
- Rate = amount of work a worker can finish per unit time (e.g., per hour).
- Work = total job or task (often treated as 1 whole job).
- Time = how long it takes.
The basic relationship is:
[ \text{Rate} \times \text{Time} = \text{Work} ]
2. Key Points
| Concept | Formula | What it Means |
|---|---|---|
| Individual rate | ( r = \frac{1}{t} ) | Work done by 1 person in 1 hour if they finish the job in (t) hours. |
| Combined rate (parallel work) | ( r_{\text{total}} = r_1 + r_2 + \dots + r_n ) | Sum of rates when many workers work together. |
| Time for combined work | ( t = \frac{1}{r_{\text{total}}} ) | Hours needed for all workers together. |
| Work done by a worker | ( W = r \times t ) | Portion of job done by a worker in given time. |
| Work left after some time | ( W_{\text{left}} = 1 - W_{\text{done}} ) | Remaining part of the job. |
| Work done by a worker after another's time | ( r_{\text{other}} \times t_{\text{first}} ) | Portion of job finished by the second worker during the first worker’s working time. |
| Unit rate conversion | If given “X workers in Y days”, rate per worker = ( \frac{1}{XY} ). | Helps when rates are given in days. |
| Work in fractions | Use fractions or decimals consistently. | Avoid rounding errors. |
3. Worked Example
Problem
A and B can paint a wall in 15 and 20 days respectively. A works alone for 5 days. After that, B starts painting. How many more days will B need to finish the wall?
Step‑by‑Step
-
Convert days to rates (work per day).
- A’s rate: ( r_A = \frac{1}{15} ) wall/day.
- B’s rate: ( r_B = \frac{1}{20} ) wall/day.
-
Work done by A in 5 days.
[ W_{\text{A}} = r_A \times 5 = \frac{1}{15} \times 5 = \frac{5}{15} = \frac{1}{3} ] So, ( \frac{1}{3} ) of the wall is painted. -
Work left to finish.
[ W_{\text{left}} = 1 - \frac{1}{3} = \frac{2}{3} ] -
Time needed by B to finish the remaining ( \frac{2}{3} ).
[ t_B = \frac{W_{\text{left}}}{r_B} = \frac{ \frac{2}{3} }{ \frac{1}{20} } = \frac{2}{3} \times 20 = \frac{40}{3} = 13.\overline{3}\text{ days} ]
Answer: B needs 13⅓ days (13 days 8 hours) to finish the wall.
4. Quick Revision Summary
- Rate = ( \frac{1}{\text{time to finish alone}} ).
- Combined rate = sum of individual rates.
- Time for combined work = ( \frac{1}{\text{combined rate}} ).
- Work done = rate × time.
- Work left = total work – work done.
- When one worker starts first: subtract his/her work from the total, then compute remaining time with the second worker’s rate.
Tips for RPF Constable:
- Always convert all times to the same unit (days or hours).
- Express rates as fractions (e.g., ( \frac{1}{15} )) to avoid rounding errors.
- Double‑check that the sum of work done + work left = 1.
With practice, these steps become automatic – perfect for quick exam completion!