UPSC CMS – Quantitative Aptitude
Topic: Time & Work
1. Simple Explanation
Time & Work problems ask you to find how long it takes for one or more workers (people, machines, etc.) to complete a job, or to find the rate at which they work.
- Work (W) is the total job (in “work‑units”).
- Rate (R) is the amount of work done by a worker per unit time (e.g., per hour).
- Time (T) is the duration needed to finish the work.
The fundamental relationship:
[ W = R \times T \quad\text{or}\quad T = \frac{W}{R} ]
When multiple workers work together, their rates add:
[ R_{\text{total}} = R_1 + R_2 + \dots + R_n ]
If a worker’s efficiency changes (e.g., working at half the speed), adjust their rate accordingly.
2. Key Points
| Concept | Formula | Notes |
|---|---|---|
| Rate of a worker | (R = \dfrac{1}{T}) | Rate expressed as “work per hour”. |
| Work done by a worker in time t | (W = \dfrac{t}{T}) | If (T) is the time to finish the whole job alone. |
| Combined rate | (R_{\text{comb}} = \sum R_i) | For (n) workers. |
| Time for combined work | (T_{\text{comb}} = \dfrac{1}{R_{\text{comb}}}) | If work (=1) unit. |
| Work done by a subset | (W_{\text{sub}} = R_{\text{sub}} \times t) | For partial duration. |
| Work remaining | (W_{\text{rem}} = 1 - W_{\text{done}}) | If total work = 1. |
| Share of payment | (\text{Share}_i = \dfrac{R_i}{\sum R_i}) | For equal payment distribution. |
| Efficiency ratio | (\dfrac{R_1}{R_2}) | Useful for comparing two workers. |
Common Pitfalls
- Confusing units – always convert rates to the same unit (e.g., per hour).
- Ignoring time periods – when a worker works for only part of the job, use the fraction of time.
- Assuming equal work per worker – unless stated, workers contribute proportionally to their rates.
- Mixing “time to finish alone” with “time working together” – keep them separate.
3. Worked Example
Problem
A and B can clean a 120‑sq‑ft area in 6 hours and 9 hours respectively.
They start together. After 2 hours, A leaves and B continues alone.
How much time will B need to finish the remaining area?
Solution
-
Convert to rates
- A’s rate: (R_A = \frac{1}{6}) area/hour
- B’s rate: (R_B = \frac{1}{9}) area/hour
-
Work done together in first 2 hours
[ W_{\text{together}} = (R_A + R_B) \times 2 = \left(\frac{1}{6} + \frac{1}{9}\right) \times 2 ] [ = \left(\frac{3+2}{18}\right) \times 2 = \frac{5}{18}\times 2 = \frac{5}{9} ] -
Remaining work
Total work (=1) (entire area).
[ W_{\text{remaining}} = 1 - \frac{5}{9} = \frac{4}{9} ] -
Time for B alone to finish remaining work
[ T_{\text{B alone}} = \frac{W_{\text{remaining}}}{R_B} = \frac{\frac{4}{9}}{\frac{1}{9}} = 4 \text{ hours} ]
Answer: B needs 4 hours after A leaves, so total time from start = (2 + 4 = 6) hours.
4. Quick Revision Summary
| Question Type | Quick Formula |
|---|---|
| Rate of one worker | (R = 1/T_{\text{alone}}) |
| Time for one worker | (T = W/R) |
| Combined rate | (R_{\text{c}} = \sum R_i) |
| Time for combined | (T_{\text{c}} = 1/R_{\text{c}}) |
| Work done by subset | (W = R_{\text{sub}} \times t) |
| Share of payment | (\text{Share}_i = R_i / \sum R_i) |
| Remaining work | (1 - \text{Work done}) |
- Always express work as a single unit (1) for simplicity.
- Add rates for joint work.
- Remember: rate = 1 / time (when the worker alone completes the whole job).
- Check units – keep everything in hours (or same time unit).
With these formulas and steps, you can tackle any UPSC CMS time‑and‑work problem efficiently. Happy studying!