1. Simple Explanation

Time & Work problems ask you to find how long it takes for one or more workers (people, machines, etc.) to complete a job, or to find the rate at which they work.

  • Work (W) is the total job (in “work‑units”).
  • Rate (R) is the amount of work done by a worker per unit time (e.g., per hour).
  • Time (T) is the duration needed to finish the work.

The fundamental relationship:

[ W = R \times T \quad\text{or}\quad T = \frac{W}{R} ]

When multiple workers work together, their rates add:

[ R_{\text{total}} = R_1 + R_2 + \dots + R_n ]

If a worker’s efficiency changes (e.g., working at half the speed), adjust their rate accordingly.


2. Key Points

Concept Formula Notes
Rate of a worker (R = \dfrac{1}{T}) Rate expressed as “work per hour”.
Work done by a worker in time t (W = \dfrac{t}{T}) If (T) is the time to finish the whole job alone.
Combined rate (R_{\text{comb}} = \sum R_i) For (n) workers.
Time for combined work (T_{\text{comb}} = \dfrac{1}{R_{\text{comb}}}) If work (=1) unit.
Work done by a subset (W_{\text{sub}} = R_{\text{sub}} \times t) For partial duration.
Work remaining (W_{\text{rem}} = 1 - W_{\text{done}}) If total work = 1.
Share of payment (\text{Share}_i = \dfrac{R_i}{\sum R_i}) For equal payment distribution.
Efficiency ratio (\dfrac{R_1}{R_2}) Useful for comparing two workers.

Common Pitfalls

  1. Confusing units – always convert rates to the same unit (e.g., per hour).
  2. Ignoring time periods – when a worker works for only part of the job, use the fraction of time.
  3. Assuming equal work per worker – unless stated, workers contribute proportionally to their rates.
  4. Mixing “time to finish alone” with “time working together” – keep them separate.

3. Worked Example

Problem

A and B can clean a 120‑sq‑ft area in 6 hours and 9 hours respectively.
They start together. After 2 hours, A leaves and B continues alone.
How much time will B need to finish the remaining area?

Solution

  1. Convert to rates

    • A’s rate: (R_A = \frac{1}{6}) area/hour
    • B’s rate: (R_B = \frac{1}{9}) area/hour
  2. Work done together in first 2 hours
    [ W_{\text{together}} = (R_A + R_B) \times 2 = \left(\frac{1}{6} + \frac{1}{9}\right) \times 2 ] [ = \left(\frac{3+2}{18}\right) \times 2 = \frac{5}{18}\times 2 = \frac{5}{9} ]

  3. Remaining work
    Total work (=1) (entire area).
    [ W_{\text{remaining}} = 1 - \frac{5}{9} = \frac{4}{9} ]

  4. Time for B alone to finish remaining work
    [ T_{\text{B alone}} = \frac{W_{\text{remaining}}}{R_B} = \frac{\frac{4}{9}}{\frac{1}{9}} = 4 \text{ hours} ]

Answer: B needs 4 hours after A leaves, so total time from start = (2 + 4 = 6) hours.


4. Quick Revision Summary

Question Type Quick Formula
Rate of one worker (R = 1/T_{\text{alone}})
Time for one worker (T = W/R)
Combined rate (R_{\text{c}} = \sum R_i)
Time for combined (T_{\text{c}} = 1/R_{\text{c}})
Work done by subset (W = R_{\text{sub}} \times t)
Share of payment (\text{Share}_i = R_i / \sum R_i)
Remaining work (1 - \text{Work done})
  • Always express work as a single unit (1) for simplicity.
  • Add rates for joint work.
  • Remember: rate = 1 / time (when the worker alone completes the whole job).
  • Check units – keep everything in hours (or same time unit).

With these formulas and steps, you can tackle any UPSC CMS time‑and‑work problem efficiently. Happy studying!