UPSC Geo-Scientist /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – UPSC Geo‑Scientist Quantitative Aptitude

(IIT–JEE / Competitive Exam Style)


1. Fundamental Idea

Work is a measure of effort done.
If a person (or machine, or team) can finish a job in T units of time, then the rate of work (R) is

[ R=\frac{1\ \text{job}}{T}\quad(\text{jobs per time unit}) ]

When multiple persons work together, their rates add up.

Key Insight
Work = Rate × Time.
Therefore, to solve mixed‑work problems we convert everything to rate (jobs per unit time).


2. Basic Formulas

Symbol Meaning Formula
(W) Total work (jobs) (W = R \times T)
(R) Rate of a worker (R = \frac{1}{T})
(T) Time to finish a job alone (T = \frac{1}{R})
(n) Number of workers (R_{\text{total}} = \sum_{i=1}^{n} R_i)
(T_{\text{total}}) Time when working together (T_{\text{total}} = \frac{W}{R_{\text{total}}})

3. Work‑Rate Derivations

3.1 Single Worker

Suppose a worker finishes a job in 8 days.

[ R = \frac{1}{8}\text{ job/day} \quad\Rightarrow\quad W = 1\text{ job} ]

3.2 Two Workers Working Together

Let two workers A and B finish the same job in 12 days and 18 days respectively.

[ R_A = \frac{1}{12},\qquad R_B = \frac{1}{18} ] [ R_{\text{total}} = \frac{1}{12}+\frac{1}{18}= \frac{5}{36}\text{ job/day} ] [ T_{\text{total}} = \frac{1}{R_{\text{total}}}= \frac{36}{5}=7.2\text{ days} ]


4. Common Patterns & Tricks

Pattern Approach Example
A works alone for x days, then A & B together Compute work done by A alone, subtract from total, then find combined rate. A alone for 2 days, then A+B finish in 5 days.
One worker leaves midway Treat the time before and after leaving separately. A and B together for 3 days; B leaves; A finishes in 4 more days.
Work done by a combination of k workers Use harmonic sums or pairwise addition. 3 workers finish in 6 days; find time for 5 workers.
Rate inverses (harmonic mean) When adding rates, use (R_{\text{total}}=\sum \frac{1}{T_i}). 4 workers finish in 10 days; find time for 6 workers.
Work & Time Interchange If all workers except one finish in t days, compute missing worker’s time by subtracting work done. 5 workers finish in 8 days, one worker is slower.

Tricky Point 1:
When two workers have different daily capacities but same job, always convert to rate first. Mixing raw “days” leads to mistakes.

Tricky Point 2:
Remember that “time to finish x jobs” is inverse of rate: (T = \frac{x}{R}). For multiple jobs, multiply x by (T_{\text{per job}}).


5. Advanced Concepts

5.1 Rate of Work with Proportionality

If worker A’s rate is k times worker B’s rate, then

[ R_A = k R_B ]

Given total time with both, we can set up

[ \frac{1}{T_{\text{total}}} = \frac{1}{T_A} + \frac{1}{T_B} ]

Solve for unknown (T_A) or (T_B).

5.2 Work Done in Parts

Suppose a job is split into fractions: (p) fraction done by A alone, the rest by A+B.
Let the job be 1 unit.

[ p = 1 - \frac{T_{\text{total}}}{T_{\text{combined}}} ]

5.3 Work & Fractional Time

When a worker works for a fractional part of a day (e.g., 5 hours out of 8), convert hours to days:

[ \text{Time in days} = \frac{\text{Hours}}{8} ]


6. Sample Problem (Easy)

Problem:
A and B together can complete a survey in 10 days. A alone would finish it in 15 days. How many days will B alone take?

Solution:

  1. (R_A = \frac{1}{15})
  2. (R_{A+B} = \frac{1}{10})
  3. (R_B = R_{A+B} - R_A = \frac{1}{10} - \frac{1}{15} = \frac{1}{30})
  4. (T_B = \frac{1}{R_B} = 30) days.

7. Hard Practice Question

Question (IIT‑JEE Level)
Three teams – T1, T2, T3 – are working on a large geo‑scientific survey.

  • Team T1 can finish the survey in 35 days on its own.
  • Team T2 can finish it in 25 days on its own.
  • Team T3 can finish it in 20 days on its own.

Scenario A: T1 and T2 work together for the first 12 days, after which T2 leaves. T1 continues alone for a further 8 days, and then T3 joins T1 and they finish the remaining work together in 5 days.

Scenario B: Instead, if T2 had stayed until the end, and T3 joined the two of them only after T1 had already worked alone for the first 12 days, how many days would the entire survey take under this arrangement?

Find

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.