NIA Recruitment /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Quick Study Notes


1. What is “Time & Work”?

When people (or machines) finish a job, we can talk about

  • How long it takes (time) and
  • How much of the job is done (work).

The basic idea is that more time usually means more work done, and faster people finish a job in less time.


2. Everyday Analogy

  • Think of a pizza that needs to be cut.
  • One person can cut the whole pizza in 4 minutes.
  • Another can cut it in 6 minutes.
  • If they cut together, they finish the pizza faster than either alone.

3. Core Concepts

Concept What it means (plain)
Work The whole job – e.g., the whole pizza.
Rate of Work How much of the job one person finishes per day (or per hour).
Time How many days a person takes to finish the whole job alone.

3.1 Rate of Work (Simplified)

  • If a person finishes a job in T days, his rate is 1/T of the job each day.
  • Example: 4 days → rate = 1/4 of the job per day.

3.2 Work Done

  • Work done = Rate × Time.
  • Example: a rate of 1/4 job/day for 2 days → 1/4 × 2 = 1/2 of the job.

3.3 Adding Rates

  • When two people work together, their rates add.
  • Example: 1/4 + 1/6 = 5/12 of the job per day.

4. Simple Rules to Remember

Rule How to use it
Single person Time = 1 ÷ Rate.
Two people together Time together = 1 ÷ (Rate₁ + Rate₂).
Partial work Work left = 1 – (Work already done).
Work for part of the time Work done in that part = Rate × Time‑in‑that‑part.

5. Tiny Example

Problem:
Alice finishes a task in 4 days. Bob finishes the same task in 6 days. How long will they take if they work together?

Step‑by‑step

  1. Find each rate

    • Alice: 1/4 of the job per day.
    • Bob: 1/6 of the job per day.
  2. Add the rates
    1/4 + 1/6 = 3/12 + 2/12 = 5/12 of the job per day.

  3. Find the time together
    Time = 1 ÷ (5/12) = 12/5 = 2.4 days.

Answer: They finish the job together in 2.4 days (about 2 days and 10 hours).


6. Another Quick Example

Problem:
A works alone for 3 days. After that, B joins and together they finish the job in 5 more days. How long would B take alone?

Solution

  1. Rate of A

    • Assume the whole job = 1.
    • Work done by A in 3 days = Rate_A × 3.
  2. Work left after A

    • 1 – (Rate_A × 3).
  3. Together Rate

    • Let Rate_B be B’s rate.
    • Together rate = Rate_A + Rate_B.
  4. Time for the remaining work

    • Time_left = 5 days →
      5 × (Rate_A + Rate_B) = Work_left.

Your note

Page 1