📚 Time & Work – Agniveer Quantitative Aptitude Study Notes

Time & Work problems are the backbone of many quantitative aptitude sections.
They test your ability to translate real‑world scenarios into algebraic equations, and then solve them efficiently.


1. Simple Explanation

  • Work = amount of job to be done (e.g., painting a wall, building a bridge).
  • Rate = amount of work done per unit time (e.g., 1/5 of the wall per hour).
  • Time = duration required to finish the job.

The fundamental relationship is:

[ \text{Rate} \times \text{Time} = \text{Work} ]

or

[ \text{Work} = \text{Rate} \times \text{Time} ]


2. Key Points

# Concept Quick Takeaway
1 Units Work is often expressed as a whole job (1 job). Rates are fractions like 1/5 job/hr. Time can be hrs, days, etc.
2 Additive Rates If two people work together, their rates add:
(R_{\text{total}} = R_1 + R_2).
3 Rate = 1/Time If a person completes 1 job in t hrs, his rate = (1/t) job/hr.
4 Work Done Work completed by a person in t hrs = ((1/t_{\text{person}}) \times t).
5 Comparisons “A works twice as fast as B” → (R_A = 2R_B).
6 Change of Work If work changes (e.g., 1/3 of job removed), adjust the Work value accordingly.
7 Part‑Work When someone works for part of the time, split into segments:
Total work = (R_1 t_1 + R_2 t_2 + \dots).
8 Common Mistakes - Mixing up “time taken” with “time remaining”.
- Forgetting to convert rates to same unit.
- Assuming linearity when rates differ with time.
9 Quick Checks After solving, plug numbers back into the equation to confirm.

3. Worked Example

Problem

A and B can complete a job in 12 hrs and 18 hrs respectively. After working together for 3 hrs, C joins and the three of them finish the remaining job in 4 hrs. How long would C take to finish the job alone?

Step‑by‑Step

Step Explanation Calculation
1. Convert rates Rate of A = 1/12 job/hr, B = 1/18 job/hr, C = ? (R_A = \frac{1}{12}), (R_B = \frac{1}{18})
2. Work done by A & B in 3 hrs (W_{AB} = (R_A + R_B) \times 3) (= (\frac{1}{12} + \frac{1}{18}) \times 3 = \frac{5}{36})
3. Remaining work (W_{rem} = 1 - W_{AB}) (= 1 - \frac{5}{36} = \frac{31}{36})
4. Total work by all 3 in 4 hrs (W_{ABC} = (R_A + R_B + R_C) \times 4 = W_{rem}) ((\frac{1}{12} + \frac{1}{18} + R_C) \times 4 = \frac{31}{36})
5. Solve for (R_C) (\frac{1}{12} + \frac{1}{18} = \frac{5}{36}). Thus:
((\frac{5}{36} + R_C) \times 4 = \frac{31}{36})
(\frac{5}{36} + R_C = \frac{31}{144})
(R_C = \frac{31}{144} - \frac{5}{36} = \frac{31}{144} - \frac{20}{144} = \frac{11}{144})
6. Find C’s time Time = 1 / Rate (T_C = \frac{1}{11/144} = \frac{144}{11} \approx 13.09 \text{ hrs})

Answer: C alone would take ( \displaystyle \frac{144}{11}) hours ≈ 13 hrs 5 min.


4. Quick Revision Summary

Concept Formula What to Remember
Work (W = R \times t) Work is often 1 job.
Rate (R = 1/t) Faster worker → higher rate.
Adding Rates (R_{\text{total}} = \sum R_i) Work together → rates add.
Work Done by Group (W_{\text{group}} = \sum (R_i \times t_i)) Split into segments if times differ.
Solving for Unknown Rearrange (W = R \times t) Isolate the unknown variable.
Check Plug back to verify Avoid algebraic slips.

Final Tips

  1. Draw a Table – List each worker's rate, time worked, and work done.
  2. Work Backwards – Often easier to find remaining work first.
  3. Keep Units Consistent – If times are in days, convert rates to days‑before‑multiplying.
  4. Use Fractions – Keeps calculation exact; convert to decimals only at the end.
  5. Practice Varied Scenarios – Different combinations (e.g., one worker joins later, or one leaves early) sharpen intuition.

Happy solving! 🚀