📚 Time & Work – Agniveer Quantitative Aptitude Study Notes
Time & Work problems are the backbone of many quantitative aptitude sections.
They test your ability to translate real‑world scenarios into algebraic equations, and then solve them efficiently.
1. Simple Explanation
- Work = amount of job to be done (e.g., painting a wall, building a bridge).
- Rate = amount of work done per unit time (e.g., 1/5 of the wall per hour).
- Time = duration required to finish the job.
The fundamental relationship is:
[ \text{Rate} \times \text{Time} = \text{Work} ]
or
[ \text{Work} = \text{Rate} \times \text{Time} ]
2. Key Points
| # | Concept | Quick Takeaway |
|---|---|---|
| 1 | Units | Work is often expressed as a whole job (1 job). Rates are fractions like 1/5 job/hr. Time can be hrs, days, etc. |
| 2 | Additive Rates | If two people work together, their rates add: |
| (R_{\text{total}} = R_1 + R_2). | ||
| 3 | Rate = 1/Time | If a person completes 1 job in t hrs, his rate = (1/t) job/hr. |
| 4 | Work Done | Work completed by a person in t hrs = ((1/t_{\text{person}}) \times t). |
| 5 | Comparisons | “A works twice as fast as B” → (R_A = 2R_B). |
| 6 | Change of Work | If work changes (e.g., 1/3 of job removed), adjust the Work value accordingly. |
| 7 | Part‑Work | When someone works for part of the time, split into segments: |
| Total work = (R_1 t_1 + R_2 t_2 + \dots). | ||
| 8 | Common Mistakes | - Mixing up “time taken” with “time remaining”. - Forgetting to convert rates to same unit. - Assuming linearity when rates differ with time. |
| 9 | Quick Checks | After solving, plug numbers back into the equation to confirm. |
3. Worked Example
Problem
A and B can complete a job in 12 hrs and 18 hrs respectively. After working together for 3 hrs, C joins and the three of them finish the remaining job in 4 hrs. How long would C take to finish the job alone?
Step‑by‑Step
| Step | Explanation | Calculation |
|---|---|---|
| 1. Convert rates | Rate of A = 1/12 job/hr, B = 1/18 job/hr, C = ? | (R_A = \frac{1}{12}), (R_B = \frac{1}{18}) |
| 2. Work done by A & B in 3 hrs | (W_{AB} = (R_A + R_B) \times 3) | (= (\frac{1}{12} + \frac{1}{18}) \times 3 = \frac{5}{36}) |
| 3. Remaining work | (W_{rem} = 1 - W_{AB}) | (= 1 - \frac{5}{36} = \frac{31}{36}) |
| 4. Total work by all 3 in 4 hrs | (W_{ABC} = (R_A + R_B + R_C) \times 4 = W_{rem}) | ((\frac{1}{12} + \frac{1}{18} + R_C) \times 4 = \frac{31}{36}) |
| 5. Solve for (R_C) | (\frac{1}{12} + \frac{1}{18} = \frac{5}{36}). Thus: ((\frac{5}{36} + R_C) \times 4 = \frac{31}{36}) |
(\frac{5}{36} + R_C = \frac{31}{144}) (R_C = \frac{31}{144} - \frac{5}{36} = \frac{31}{144} - \frac{20}{144} = \frac{11}{144}) |
| 6. Find C’s time | Time = 1 / Rate | (T_C = \frac{1}{11/144} = \frac{144}{11} \approx 13.09 \text{ hrs}) |
Answer: C alone would take ( \displaystyle \frac{144}{11}) hours ≈ 13 hrs 5 min.
4. Quick Revision Summary
| Concept | Formula | What to Remember |
|---|---|---|
| Work | (W = R \times t) | Work is often 1 job. |
| Rate | (R = 1/t) | Faster worker → higher rate. |
| Adding Rates | (R_{\text{total}} = \sum R_i) | Work together → rates add. |
| Work Done by Group | (W_{\text{group}} = \sum (R_i \times t_i)) | Split into segments if times differ. |
| Solving for Unknown | Rearrange (W = R \times t) | Isolate the unknown variable. |
| Check | Plug back to verify | Avoid algebraic slips. |
Final Tips
- Draw a Table – List each worker's rate, time worked, and work done.
- Work Backwards – Often easier to find remaining work first.
- Keep Units Consistent – If times are in days, convert rates to days‑before‑multiplying.
- Use Fractions – Keeps calculation exact; convert to decimals only at the end.
- Practice Varied Scenarios – Different combinations (e.g., one worker joins later, or one leaves early) sharpen intuition.
Happy solving! 🚀