Time & Work – Study Notes
1. Simple Explanation
Time & work problems ask you to find how long it will take for one or more workers to complete a task, or how many workers are required to finish a job in a given time.
The basic idea is that work is additive: the total work done by several people working together equals the sum of the work done by each person.
2. Key Points
| Concept | Formula | Notes |
|---|---|---|
| Rate of work | rate = 1 / time |
Rate is the fraction of job completed per unit time. |
| Work done by one person | work = rate × time |
If a person works for t hours, they finish t / T of the job (where T is the time they would take alone). |
| Combined rate of n workers | combined_rate = Σ rate_i |
Add rates of all workers. |
| Time for combined workers | time = 1 / combined_rate |
Inverse of combined rate. |
| Work‑time relation | W = (rate × time) |
Often written as W = (1/T) × t. |
| Part‑work | part = (part_rate / total_rate) × total_work |
Useful when a part of the job is done by a subset of workers. |
| Work‑difference method | Compare two scenarios, find missing variable. | e.g., “A can finish in 20 days, B in 30. Together in 12 days.” |
Common trick: Convert everything into work units (e.g., “1 job”) so that you can add and subtract easily.
3. Worked Example
Problem
A and B can complete a job in 18 days and 24 days respectively. If they work together for 6 days, then C joins them and the remaining work is finished in 4 days. If C alone can finish the job in 20 days, how many days will C take to finish the job alone?
Step‑by‑Step Solution
-
Compute rates
- A’s rate:
1/18job/day - B’s rate:
1/24job/day - C’s rate:
1/20job/day (given)
- A’s rate:
-
Work done by A & B together in 6 days
[ W_{AB,6} = (1/18 + 1/24) \times 6 ] [ = (4/72 + 3/72) \times 6 = (7/72) \times 6 = 42/72 = 7/12 ] -
Remaining work after 6 days
[ W_{\text{rem}} = 1 - 7/12 = 5/12 ] -
Work done by A, B, and C together in 4 days
[ W_{ABC,4} = (1/18 + 1/24 + 1/20) \times 4 ] [ = (20/360 + 15/360 + 18/360) \times 4 = (53/360) \times 4 = 212/360 = 53/90 ] -
Check consistency
[ W_{\text{rem}} = 5/12 = 15/36 \quad \text{and} \quad 53/90 \approx 0.5889 ] They are not equal → Mistake found: We mis‑applied C’s rate.
In the problem C’s rate is unknown, not1/20. Let's redo with C’s rater. -
Let C’s rate = r
- After 6 days, remaining work =
5/12. - In next 4 days, work done =
(1/18 + 1/24 + r) × 4 = 5/12.
Set up equation: [ (1/18 + 1/24 + r) \times 4 = 5/12 ] Compute constants: [ 1/18 + 1/24 = 4/72 + 3/72 = 7/72 ] So: [ (7/72 + r) \times 4 = 5/12 ] [ 7/18 + 4r = 5/12 ] [ 4r = 5/12 - 7/18 = \frac{15-14}{36} = \frac{1}{36} ] [ r = \frac{1}{144} ]
- After 6 days, remaining work =
-
C’s time to finish alone
[ \text{Time} = \frac{1}{r} = 144 \text{ days} ]
Answer: C would take 144 days to finish the job alone.
4. Quick Revision Summary
- Rate of work =
1 / time(jobs per day). - Add rates for workers working together.
- Time for combined workers =
1 / combined_rate. - Work done =
rate × time. - Remaining work =
1 - (work done so far). - Always convert to fraction of job before adding/subtracting.
Remember: In mixed‑worker problems, write an equation equating the total work done (or remaining work) to 1 job. Solve for the unknown rate or time.
Happy studying!