Navy SSR /Quantitative Aptitude

Time & work

Commercial Maths · free study notes · Updated

Time & Work – Study Notes


1. Simple Explanation

Time & work problems ask you to find how long it will take for one or more workers to complete a task, or how many workers are required to finish a job in a given time.
The basic idea is that work is additive: the total work done by several people working together equals the sum of the work done by each person.


2. Key Points

Concept Formula Notes
Rate of work rate = 1 / time Rate is the fraction of job completed per unit time.
Work done by one person work = rate × time If a person works for t hours, they finish t / T of the job (where T is the time they would take alone).
Combined rate of n workers combined_rate = Σ rate_i Add rates of all workers.
Time for combined workers time = 1 / combined_rate Inverse of combined rate.
Work‑time relation W = (rate × time) Often written as W = (1/T) × t.
Part‑work part = (part_rate / total_rate) × total_work Useful when a part of the job is done by a subset of workers.
Work‑difference method Compare two scenarios, find missing variable. e.g., “A can finish in 20 days, B in 30. Together in 12 days.”

Common trick: Convert everything into work units (e.g., “1 job”) so that you can add and subtract easily.


3. Worked Example

Problem

A and B can complete a job in 18 days and 24 days respectively. If they work together for 6 days, then C joins them and the remaining work is finished in 4 days. If C alone can finish the job in 20 days, how many days will C take to finish the job alone?

Step‑by‑Step Solution

  1. Compute rates

    • A’s rate: 1/18 job/day
    • B’s rate: 1/24 job/day
    • C’s rate: 1/20 job/day (given)
  2. Work done by A & B together in 6 days
    [ W_{AB,6} = (1/18 + 1/24) \times 6 ] [ = (4/72 + 3/72) \times 6 = (7/72) \times 6 = 42/72 = 7/12 ]

  3. Remaining work after 6 days
    [ W_{\text{rem}} = 1 - 7/12 = 5/12 ]

  4. Work done by A, B, and C together in 4 days
    [ W_{ABC,4} = (1/18 + 1/24 + 1/20) \times 4 ] [ = (20/360 + 15/360 + 18/360) \times 4 = (53/360) \times 4 = 212/360 = 53/90 ]

  5. Check consistency
    [ W_{\text{rem}} = 5/12 = 15/36 \quad \text{and} \quad 53/90 \approx 0.5889 ] They are not equal → Mistake found: We mis‑applied C’s rate.
    In the problem C’s rate is unknown, not 1/20. Let's redo with C’s rate r.

  6. Let C’s rate = r

    • After 6 days, remaining work = 5/12.
    • In next 4 days, work done = (1/18 + 1/24 + r) × 4 = 5/12.

    Set up equation: [ (1/18 + 1/24 + r) \times 4 = 5/12 ] Compute constants: [ 1/18 + 1/24 = 4/72 + 3/72 = 7/72 ] So: [ (7/72 + r) \times 4 = 5/12 ] [ 7/18 + 4r = 5/12 ] [ 4r = 5/12 - 7/18 = \frac{15-14}{36} = \frac{1}{36} ] [ r = \frac{1}{144} ]

  7. C’s time to finish alone
    [ \text{Time} = \frac{1}{r} = 144 \text{ days} ]

Answer: C would take 144 days to finish the job alone.


4. Quick Revision Summary

  1. Rate of work = 1 / time (jobs per day).
  2. Add rates for workers working together.
  3. Time for combined workers = 1 / combined_rate.
  4. Work done = rate × time.
  5. Remaining work = 1 - (work done so far).
  6. Always convert to fraction of job before adding/subtracting.

Remember: In mixed‑worker problems, write an equation equating the total work done (or remaining work) to 1 job. Solve for the unknown rate or time.

Happy studying!