Time & Work – Study Notes
(Quantitative Aptitude – TOPIK Preparation)
1. Simple Explanation
Time & Work deals with how long it takes for one or more workers (or machines, etc.) to complete a job, or how much work they can finish in a given time.
- Work is measured in units (e.g., “a job,” “a piece of work”).
- Rate of work is the amount of work done per unit time.
- If a worker completes a job in 4 hrs, his rate is ( \frac{1}{4} ) job per hour.
- Work done = Rate × Time.
- Total time for a job = ( \frac{1}{\text{Total rate}} ) (if one worker) or ( \frac{\text{Work}}{\text{Total rate}} ) (if many workers/machines).
2. Key Points
| Concept | Formula | Notes |
|---|---|---|
| Rate of a single worker | ( r = \frac{1}{T} ) | (T) = time to finish 1 job |
| Work done by a worker | ( W = r \times t ) | (t) = time worked |
| Combined rate | ( r_{\text{total}} = r_1 + r_2 + \dots + r_n ) | Add rates of all workers/machines |
| Time for combined workers | ( T = \frac{1}{r_{\text{total}}} ) | If one job |
| Work done together in (t) hrs | ( W = r_{\text{total}} \times t ) | |
| Effect of adding/ removing workers | Compare new total rates | Quick mental check: more workers → lower time |
| Work left after (t) hrs | ( \text{Left} = 1 - r_{\text{total}} \times t ) | |
| Partial job tasks | Break job into subtasks, apply rates separately | Useful for “first X workers finish Y% of job” problems |
Common Traps
- Confusing rate vs. time – always keep units (jobs/hr vs hrs).
- Assuming equal work – check if workers have different rates.
- Neglecting “part” of a job – compute work done first, then remaining.
- Mixing “time” and “rate” in the same equation – keep them separate.
3. Worked Example
Problem:
Worker A can finish a job in 6 hrs. Worker B can finish the same job in 9 hrs. They work together for 3 hrs, then only A continues. How long will it take for A to finish the job?
Step‑by‑Step
| Step | Calculation | Result |
|---|---|---|
| 1. Rate of A | ( r_A = \frac{1}{6} ) job/hr | (0.1667) |
| 2. Rate of B | ( r_B = \frac{1}{9} ) job/hr | (0.1111) |
| 3. Combined rate | ( r_{AB} = r_A + r_B = \frac{1}{6}+\frac{1}{9} = \frac{5}{18} ) job/hr | (0.2778) |
| 4. Work done together in 3 hrs | ( W_{AB} = r_{AB}\times 3 = \frac{5}{18}\times3 = \frac{5}{6} ) of job | 83.33 % |
| 5. Work remaining | ( 1 - \frac{5}{6} = \frac{1}{6} ) of job | 16.67 % |
| 6. A’s rate alone | ( r_A = \frac{1}{6} ) job/hr | |
| 7. Time for A to finish remaining | ( t = \frac{\text{remaining work}}{r_A} = \frac{1/6}{1/6} = 1 ) hr | 1 hr |
| 8. Total time | ( 3 + 1 = 4 ) hrs |
Answer: 4 hours total, with A finishing the last hour alone.
4. Quick Revision Summary
- Rate = ( \frac{1}{\text{time to finish job}} ).
- Work done = Rate × Time.
- Combined rate = Sum of individual rates.
- Time for job = ( \frac{1}{\text{combined rate}} ).
- For partial work:
- Find work done → subtract from 1 job → compute remaining time.
- Always keep units consistent; double‑check that “rate” is jobs per hour and “time” is hours.
Practice Tip:
Write each worker’s rate as a fraction of a job per hour, add them, and use the reciprocal to find total time. If a worker leaves, recalculate the remaining job using the new combined rate.
Good luck with your TOPIK exam!