Time & Work – Quick & Easy Study Notes
For beginners in Quantitative Aptitude – no jargon, just plain language.
1. What is “Time & Work”?
- Time: How long it takes to finish a job.
- Work: The whole job that needs to be finished (e.g., painting a wall, filling a tub).
Think of time as the clock and work as the whole cake you want to bake.
2. How do we talk about “how fast” someone works?
- Instead of “rate,” we say speed of work.
- Speed of work = How much of the job one person finishes in one hour.
Example
Alice can paint an entire wall in 4 hours.
Her speed = 1 wall ÷ 4 hours = 0.25 wall per hour.
3. “Work Done” – the part of the job finished
- If someone works for a certain time, work done = speed × time.
- Work is measured in “whole jobs” (or fractions of a job).
Example
Bob paints at 0.20 wall/hour.
In 3 hours he does 0.20 × 3 = 0.6 wall.
4. One person, one job
| Symbol | Meaning | Quick rule |
|---|---|---|
| S | Speed of work | Jobs per hour |
| T | Time needed | Hours |
| W | Total work | Whole job (usually 1) |
Formula
[
T = \frac{W}{S}
]
Tiny Example
If a machine needs 8 hours to fill a tank, its speed = 1 tank ÷ 8 h = 0.125 tank/h.
So (T = \frac{1}{0.125} = 8) hours – matches the story.
5. Two or more people working together
When people work together, you add their speeds.
Example
- Alice: 0.25 wall/hour
- Bob: 0.20 wall/hour
Combined speed = 0.25 + 0.20 = 0.45 wall/hour
If they paint together, the wall will be finished in
[ T = \frac{1}{0.45} \approx 2.22\text{ hours} ]
6. Partial work – working for only part of the job
- Work done in a given time = speed × time.
- If they stop early, the remaining work is the difference.
Example
Alice and Bob together (speed 0.45 wall/h) work for 1 hour.
Work done = 0.45 × 1 = 0.45 wall.
Remaining wall = 1 – 0.45 = 0.55 wall.
7. Changing the number of workers
Adding or removing workers changes the combined speed linearly.
Example
5 workers each paint 0.10 wall/h → combined speed 0.50 wall/h.
If 2 workers leave, 3 workers remain → speed 0.30 wall/h.
Time to finish a wall: (T = 1 ÷ 0.30 \approx 3.33) hours.
8. One worker replaces another
If worker A leaves and worker B takes their place:
- New combined speed = (speed of all other workers) + speed of B.
- Use the same “speed × time” idea.
Tiny Example
4 workers paint a wall in 4 hours (speed 0.25 wall/h each).
One leaves; a faster worker B can paint at 0.40 wall/h.
New speed = 3×0.25 + 0.40 = 1.15 wall/h.
New time = (1 ÷ 1.15 \approx 0.87) hours.
9. Tips for Solving Problems
- Identify the job (usually 1 whole job).
- Translate words into speed (jobs per hour).
- Add speeds when people work together.
- Use “speed × time = work” to find missing pieces.
- Check units: keep everything in “jobs” and “hours”.
10. Mini‑Practice Question
Three painters can paint a wall in 6 hours. One of them is replaced by a faster painter who would finish the wall in 4 hours if he worked alone. How long will it take the new team of three to paint the wall?
Solution Outline
- Find each original painter’s speed: (1 ÷ 6 = 0.1667) wall/h.
- Fast painter’s speed: (1 ÷ 4 = 0.25) wall/h.
- New combined speed: (2 × 0.1667 + 0.25 = 0.5834) wall/h.
- New time: (1 ÷ 0.5834 ≈ 1.71) hours.
11. Quick Recap
| Concept | Simple Phrase | Formula (if you want) |
|---|---|---|
| Speed of work | How many whole jobs one finishes in an hour | ( S = \frac{W}{T} ) |
| Work done | Portion of job finished | ( W = S × T ) |
| Combined speed | Sum of individual speeds | ( S_{\text{total}} = S_1 + S_2 + \dots ) |
| Time to finish | Hours needed for a job | ( T = \frac{W}{S |