Time & Work – Quick & Easy Study Notes
1. What is “Work”?
- Work = the whole job you want finished.
Example: 1 whole wall, 1 whole bucket of paint, 1 whole cake.
2. Key Ideas (in plain words)
| Idea | What it means | Everyday picture |
|---|---|---|
| Rate | How much of the job one person does per unit of time (e.g., per hour). | A runner who can fill a bucket 1 / 2 hour. |
| Time | How long it takes someone to finish the whole job. | How long it takes to paint a wall. |
| Work | The job itself, usually counted as “1 whole job”. | One finished painting job. |
Formulae (but think of them as simple statements)
- Rate = Work ÷ Time
- Time = Work ÷ Rate
- Work = Rate × Time
You can rearrange them depending on what you know.
3. Work Done by Several People
When two (or more) people work together, their rates add:
Rate of A + Rate of B = Combined rate
Why?
Each person does a part of the job. Add the parts → total job done per hour.
4. Step‑by‑Step Guide
- Decide what you know – time, rate, or work.
- Write the missing value using one of the formulas.
- Add rates if more than one person is working.
- Plug numbers and solve.
- Check the answer – does it make sense? (e.g., time can’t be negative).
5. Tiny Example
Problem:
- Person A finishes a job in 4 hours.
- Person B finishes the same job in 6 hours.
- How long will they take together?
| Person | Rate (job per hour) |
|---|---|
| A | 1 ÷ 4 = 0.25 |
| B | 1 ÷ 6 ≈ 0.1667 |
Combined rate:
0.25 + 0.1667 = 0.4167 job per hour
Time together:
Time = 1 ÷ 0.4167 ≈ 2.4 hours (≈ 2 h 24 min)
6. Quick Practice Problems
| # | Problem | Hint |
|---|---|---|
| 1 | A can paint a wall in 5 h. B can paint the same wall in 8 h. Together how long? | Add rates. |
| 2 | A, B, and C finish a task in 10 h together. If A alone takes 15 h and B alone takes 20 h, how long does C take? | Use RateA + RateB + RateC = 1/10. |
| 3 | A works for 3 h, then leaves. B takes over and finishes the job in 5 h. If A would finish the job alone in 9 h, how long does B take alone? | Work done by A = RateA × 3. |
7. Tips for Oracle Certification
- Read the problem carefully – look for words like “together”, “alone”, “after”.
- Convert all times to the same unit (hours, minutes, etc.) before calculating.
- Keep the final answer in the same unit as the question asks.
- Double‑check that you didn’t mix up “time” and “rate”.
Quick Summary
- Rate = how fast someone works.
- Time = how long it takes to finish.
- Work = the whole job (usually 1).
- Add rates when people work together.
- Use the simple equations above to swap between rate, time, and work.
Happy studying – you’ve got this!