Oracle Certification /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

📚 Time & Work – Comprehensive Study Notes

For IIT‑JEE / Competitive Exams (Oracle Certification – Quantitative Aptitude)


1️⃣ Introduction

Time & Work problems are classic in quantitative aptitude.
They test your ability to translate a word‑problem into algebraic form and apply simple “rate” concepts.

Key Idea: Work is the product of rate (how fast something is done) and time (how long it takes).

Notation

  • (W) : Total amount of work (often in “man‑days” or “machine‑hours”)
  • (R) : Rate of a worker/machine (units of work per unit time)
  • (T) : Time taken (units of time)

2️⃣ Fundamental Formulae

Concept Formula Explanation
Work done (W = R \times T) Total work equals rate multiplied by time.
Rate of a worker (R = \dfrac{W}{T}) Work per unit time.
Combined rate (parallel work) (R_{\text{total}} = R_1 + R_2 + \dots + R_n) When all workers/machines work together.
Time for combined work (T = \dfrac{W}{R_{\text{total}}}) Inverse of combined rate.
Work by a subset (W_{\text{subset}} = R_{\text{subset}} \times T) Work performed by a particular group or time interval.
Rate after a change (R_{\text{new}} = R_{\text{old}} \pm \Delta R) Adjust rate when someone joins/leaves or machinery fails.
Work remaining (W_{\text{rem}} = W_{\text{total}} - W_{\text{done}}) What is left to finish.
Work done in n days (W_n = R \times n) Useful for “in 10 days” or “in 5 days” questions.

Tip: Always keep units consistent. If (R) is in man‑days per day (i.e., “man‑day” is the unit of work), then (T) must be in days.


3️⃣ Common Problem Types & Strategies

Problem Type Typical Question Strategy
All work together “Three workers A, B, C can finish a job in 12, 15, 20 days respectively. How long will they take together?” Find individual rates: (\frac{1}{12}, \frac{1}{15}, \frac{1}{20}). Sum rates → total rate. Invert to get time.
Work done by one then the other “A finishes 1/3 of the work in 5 days. B finishes the rest in 12 days. Find the ratio of their rates.” Use (W_{\text{total}} = 1). Compute (R_A = \frac{1/3}{5}). Compute (R_B = \frac{2/3}{12}). Ratio (R_A : R_B).
Work after a change “A can finish a job in 20 days. After 5 days, B joins and they finish in 10 more days. Find B’s rate.” Compute work done by A in 5 days. Subtract from total. Remaining work done by both in 10 days → set up equation for B’s rate.
Work with machines “One machine can do a job in 8 days. Another machine works at 70% of the first. The combined time is 4 days. How many machines are needed?” Translate “70% of the first” to rate. Use combined rate to determine total machines.
Work with failure / stoppage “A machine runs 8 hours a day but breaks down for 2 hours each day. Its effective working time is 6 hours/day.” Treat effective working hours as time. Compute rate accordingly.
Work with fractions of work “A does 1/5 of work in 4 days. B does the rest in 6 days.” Compute rates using fractions directly.

4️⃣ Derivation of Combined Rate (Illustrative)

Let

  • Worker 1 completes the job in (t_1) days → Rate (R_1 = \frac{1}{t_1}).
  • Worker 2 completes the job in (t_2) days → Rate (R_2 = \frac{1}{t_2}).

If they work together for (T) days, the total work done is

[ W_{\text{done}} = R_1 T + R_2 T = (R_1 + R_2)T. ]

But the total job is 1 unit of work, so

[ (R_1 + R_2)T = 1 \quad\Rightarrow\quad T = \frac{1}{R_1 + R_2}. ]

This simple derivation generalises to any number of workers or machines.


5️⃣ Tricky Points & Pitfalls

Pitfall Why it happens How to avoid
Confusing “time” with “rate” Some problems give “time to finish” while others give “rate of work”. Keep the