📚 Maharashtra TET – Quantitative Aptitude
📌 Topic: Time & Work
Goal – Know how to find time, work or rate when two or more people (or machines) work together or separately.
Key idea – Rate = Work done ÷ Time taken.
Think of a rate as a speedometer: it tells you how fast a task is being finished.
1️⃣ What is “Work” in this context?
- Work = the whole job that needs to be finished (e.g., painting a wall, filling a bucket).
- We call the whole job 1 unit of work.
- If a person can finish the entire job in t hours, his/her rate is 1/t units per hour.
Analogy
Imagine you need to fill a 10‑liter bucket.
- Person A fills it in 5 hours → rate = 10 ÷ 5 = 2 liters/hour.
- Person B fills it in 10 hours → rate = 10 ÷ 10 = 1 liter/hour.
2️⃣ Basic Formulas (in plain words)
| What you want | What you know | Formula (plain) |
|---|---|---|
| Rate | Work & Time | Rate = 1 ÷ Time |
| Time | Work & Rate | Time = 1 ÷ Rate |
| Work done | Rate & Time | Work = Rate × Time |
If several people work together → Add their rates.
Example
A can finish a job in 8 hrs → rate = 1/8.
B can finish it in 12 hrs → rate = 1/12.
Together: rate = 1/8 + 1/12 = 5/24 → time = 1 ÷ (5/24) = 24/5 = 4.8 hrs.
3️⃣ Step‑by‑Step Procedure
- Identify the job – Call it 1 job or 1 unit.
- Convert each person’s time to a rate
Rate = 1 ÷ Time (in hours). - Add the rates for all people working together.
- Find total time
Time = 1 ÷ (Combined Rate). - If only part of the job is done – subtract that part from 1, then use the remaining part for further calculations.
Tip – Always keep the job as “1 unit”. It keeps everything simple.
4️⃣ Common Problem Types
| Problem Type | How to Approach | Quick Example |
|---|---|---|
| Both work together | Add rates, find time | A in 5 hrs, B in 10 hrs → 5/8 hrs |
| One stops earlier | Find work done by stopped person, subtract from 1, then compute remaining with other | A works 2 hrs, B works 4 hrs, both finish 1 job |
| Difference in speed | Set up equations with “difference” | A is 3 hrs faster than B |
| Work done in part of the time | Rate × Time = Work fraction | 3 hrs of A (rate 1/6) → 3/6 = 0.5 job |
5️⃣ Tiny Example (Step‑by‑Step)
Problem
A can paint a wall in 6 hrs. B can paint the same wall in 9 hrs. How long will they take if they paint together?
- Rate of A = 1 ÷ 6 = 0.1667 job/hr
- Rate of B = 1 ÷ 9 = 0.1111 job/hr
- Combined rate = 0.1667 + 0.1111 = 0.2778 job/hr
- Time together = 1 ÷ 0.2778 ≈ 3.60 hrs (≈ 3 hrs 36 min)
Answer – About 3 hours and 36 minutes.
6️⃣ Quick Practice Problems
| # | Problem | Hint |
|---|---|---|
| 1 | A finishes a task in 10 hrs. B finishes it in 15 hrs. Together how long? | Add 1/10 + 1/15 |
| 2 | A works for 4 hrs, then B joins. Together they finish the job in 8 hrs. How long would B take alone? | Find work done by A, then solve for B |
| 3 | A is 5 hrs faster than B. If they finish a job together in 4 hrs, how long would B take alone? | Let B = x hrs, A = x-5 |
| 4 | Two machines fill a tank. Machine 1 alone takes 12 hrs, machine 2 takes 18 hrs. One machine stops after 3 hrs; how long to finish the job? | Compute work done in first 3 hrs, find remaining |
7️⃣ Quick Tips for the Exam
- Write “1 job” at the start.
- Always convert time to rate (1 ÷ time).
- Add the rates when working together.
- **Use the same