Maharashtra TET (Teacher Eligibility) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

📚 Maharashtra TET – Quantitative Aptitude

📌 Topic: Time & Work

Goal – Know how to find time, work or rate when two or more people (or machines) work together or separately.
Key idea – Rate = Work done ÷ Time taken.
Think of a rate as a speedometer: it tells you how fast a task is being finished.


1️⃣ What is “Work” in this context?

  • Work = the whole job that needs to be finished (e.g., painting a wall, filling a bucket).
  • We call the whole job 1 unit of work.
  • If a person can finish the entire job in t hours, his/her rate is 1/t units per hour.

Analogy
Imagine you need to fill a 10‑liter bucket.

  • Person A fills it in 5 hours → rate = 10 ÷ 5 = 2 liters/hour.
  • Person B fills it in 10 hours → rate = 10 ÷ 10 = 1 liter/hour.

2️⃣ Basic Formulas (in plain words)

What you want What you know Formula (plain)
Rate Work & Time Rate = 1 ÷ Time
Time Work & Rate Time = 1 ÷ Rate
Work done Rate & Time Work = Rate × Time

If several people work together → Add their rates.

Example
A can finish a job in 8 hrs → rate = 1/8.
B can finish it in 12 hrs → rate = 1/12.
Together: rate = 1/8 + 1/12 = 5/24 → time = 1 ÷ (5/24) = 24/5 = 4.8 hrs.


3️⃣ Step‑by‑Step Procedure

  1. Identify the job – Call it 1 job or 1 unit.
  2. Convert each person’s time to a rate
    Rate = 1 ÷ Time (in hours).
  3. Add the rates for all people working together.
  4. Find total time
    Time = 1 ÷ (Combined Rate).
  5. If only part of the job is done – subtract that part from 1, then use the remaining part for further calculations.

Tip – Always keep the job as “1 unit”. It keeps everything simple.


4️⃣ Common Problem Types

Problem Type How to Approach Quick Example
Both work together Add rates, find time A in 5 hrs, B in 10 hrs → 5/8 hrs
One stops earlier Find work done by stopped person, subtract from 1, then compute remaining with other A works 2 hrs, B works 4 hrs, both finish 1 job
Difference in speed Set up equations with “difference” A is 3 hrs faster than B
Work done in part of the time Rate × Time = Work fraction 3 hrs of A (rate 1/6) → 3/6 = 0.5 job

5️⃣ Tiny Example (Step‑by‑Step)

Problem
A can paint a wall in 6 hrs. B can paint the same wall in 9 hrs. How long will they take if they paint together?

  1. Rate of A = 1 ÷ 6 = 0.1667 job/hr
  2. Rate of B = 1 ÷ 9 = 0.1111 job/hr
  3. Combined rate = 0.1667 + 0.1111 = 0.2778 job/hr
  4. Time together = 1 ÷ 0.2778 ≈ 3.60 hrs (≈ 3 hrs 36 min)

Answer – About 3 hours and 36 minutes.


6️⃣ Quick Practice Problems

# Problem Hint
1 A finishes a task in 10 hrs. B finishes it in 15 hrs. Together how long? Add 1/10 + 1/15
2 A works for 4 hrs, then B joins. Together they finish the job in 8 hrs. How long would B take alone? Find work done by A, then solve for B
3 A is 5 hrs faster than B. If they finish a job together in 4 hrs, how long would B take alone? Let B = x hrs, A = x-5
4 Two machines fill a tank. Machine 1 alone takes 12 hrs, machine 2 takes 18 hrs. One machine stops after 3 hrs; how long to finish the job? Compute work done in first 3 hrs, find remaining

7️⃣ Quick Tips for the Exam

  1. Write “1 job” at the start.
  2. Always convert time to rate (1 ÷ time).
  3. Add the rates when working together.
  4. **Use the same

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.