Time & work

Commercial Maths · free study notes · Updated

Time & Work – Study Notes

(For Andhra Pradesh Police Sub‑Inspector Exam – Quantitative Aptitude)


1. Simple Explanation

Time & Work problems relate the quantity of work done to the time and rate of work of one or more workers (or machines).

  • Work (W): Total amount that must be completed (e.g., one job, one plot, one unit of material).
  • Rate (R): Work done per unit of time (e.g., jobs per hour).
  • Time (T): Duration taken to finish the work.

The fundamental relationship is

[ \boxed{W = R \times T} ]

From this we can derive:

  • (R = \dfrac{W}{T}) – rate of a worker/machine.
  • (T = \dfrac{W}{R}) – time required by a worker/machine.

When several workers work together, their rates add up.


2. Key Points & Useful Formulas

Concept Formula Description
Single worker (T = \dfrac{W}{R}) Time needed by one worker to finish the whole work.
Two workers together (R_{12} = R_1 + R_2) Combined rate of workers 1 and 2.
Work done in a given time (W_{done} = R \times T) Portion of work completed by a worker in time (T).
Remaining work (W_{rem} = W - W_{done}) Work left after some portion is finished.
Work done by one after another If worker A works for (t_a) and then B works for (t_b):
(W = R_A t_a + R_B t_b)
Sum of work done by each worker.
Speed of work (S = \frac{1}{T}) (jobs per hour) Often used when the total work (W = 1) job.
Work in days and hours Convert units appropriately (e.g., 5 h = 5/24 days). Be careful with units.

Special Cases

  1. One worker leaves halfway
    • Suppose worker A works for (t) hours and then leaves; worker B takes the rest.
    • (W = R_A t + R_B (T - t)).
  2. Work done by workers at different speeds
    • If worker A does (p%) of the work in the same time as worker B, then (R_A = \frac{p}{100} R_T) where (R_T) is the total rate.
  3. Work done in a certain number of days
    • If (n) workers finish a job in (d) days, the combined rate is (\frac{1}{d}) jobs/day.
    • Adding or removing workers changes the time inversely.

3. Worked Example

Problem

Two machines, M1 and M2, can complete a batch of work in 8 days and 12 days respectively. They work together for 3 days. After that, M1 stops and M2 works alone for the remaining days. How many days were needed in total?

Step‑by‑step Solution

  1. Convert to rates (work = 1 batch).

    • Rate of M1: (R_1 = \frac{1 \text{ batch}}{8 \text{ days}} = \frac{1}{8}) batch/day.
    • Rate of M2: (R_2 = \frac{1}{12}) batch/day.
  2. Work done together for 3 days

    • Combined rate: (R_{12} = R_1 + R_2 = \frac{1}{8} + \frac{1}{12} = \frac{3}{24} + \frac{2}{24} = \frac{5}{24}) batch/day.
    • Work done in 3 days: (W_{12} = R_{12} \times 3 = \frac{5}{24} \times 3 = \frac{15}{24} = \frac{5}{8}) batch.
  3. Work remaining after 3 days

    • Total work = 1 batch.
    • Remaining work: (W_{\text{rem}} = 1 - \frac{5}{8} = \frac{3}{8}) batch.
  4. M2 works alone to finish the remaining work

    • Time needed by M2: (T_{\text{M2}} = \frac{W_{\text{rem}}}{R_2} = \frac{\frac{3}{8}}{\frac{1}{12}} = \frac{3}{8} \times 12 = \frac{36}{8} = 4.5) days.
  5. Total time

    • (T_{\text{total}} = 3) days (together) + (4.5) days (M2 alone) = 7.5 days.

Answer: 7.5 days (or 7 days 12 hours).


4. Quick Revision Summary

Concept Formula Typical Question Type
Work‑rate relation (W = RT) “If X does Y in Z days, what is his rate?”
Combined rate (R_{total} = R_1+R_2+…) “Two workers finish a job together in … days.”
Time for one worker (T = \frac{W}{R}) “How long will worker A take alone?”
Remaining work (W_{rem