Time & Work – Study Notes
(For Kerala Police Sub‑Inspector Examination – Quantitative Aptitude)
1. Simple Explanation
Time & Work problems ask you to find how long something will take to finish a job when one or more workers (or machines, etc.) are involved, or how many workers are needed to finish a job in a given time.
- Work = amount of job (e.g., 1 whole job, 5 units).
- Rate of Work = work done per unit time (e.g., 0.1 job per hour).
- Work Done = Rate × Time.
When several workers work together, their rates add.
When they work alternately or at different times, the work is split accordingly.
2. Key Points & Formulas
| Concept | Symbol | Formula | Remark |
|---|---|---|---|
| Rate of a worker | ( r ) | ( r = \frac{\text{Work}}{\text{Time}} = \frac{1}{T} ) (if the whole job is 1 unit) | Work done per hour |
| Combined rate (workers A & B) | ( r_A + r_B ) | ( \frac{1}{T_{AB}} = \frac{1}{T_A} + \frac{1}{T_B} ) | Work rates add |
| Time to finish a job together | ( T_{AB} ) | ( T_{AB} = \frac{1}{\frac{1}{T_A} + \frac{1}{T_B}} ) | Harmonic sum |
| Work done in a given time | ( W ) | ( W = r \times t ) | ( r = \frac{1}{T} ) |
| Number of workers for given time | ( n ) | ( n = \frac{1}{T_{\text{job}}} \div \frac{1}{T_{\text{worker}}} = \frac{T_{\text{worker}}}{T_{\text{job}}} ) | If all workers identical |
| Alternate work | – | Sum the work of each worker for their working period | Usually “A works 3 hours, B 2 hours, …” |
| Work done by a worker who didn’t finish | – | If ( r \times t < 1 ) then work left = ( 1 - r \times t ) | |
| Work done in days, hours, minutes | – | Convert all times to same unit (e.g., hours) before calculation |
Common Pitfalls
- Mixing units – always convert to the same unit (hours, minutes).
- Assuming linearity incorrectly – rates add, times do not.
- Neglecting partial work – if a worker stops midway, compute remaining work separately.
3. Worked Example
Problem:
A and B can paint a wall in 12 hours and 18 hours respectively.
A works for 4 hours alone, then B joins.
How much more time will B need to finish the painting?
Step‑by‑Step Solution
| Step | Calculation | Explanation |
|---|---|---|
| 1. Find each worker’s rate | ( r_A = \frac{1}{12} ) job/hr, ( r_B = \frac{1}{18} ) job/hr | 1 job (full wall) / time taken |
| 2. Work done by A in 4 hrs | ( W_A = r_A \times 4 = \frac{1}{12}\times 4 = \frac{1}{3} ) job | A paints one‑third of the wall |
| 3. Remaining work | ( W_{\text{rem}} = 1 - \frac{1}{3} = \frac{2}{3} ) job | |
| 4. Combined rate of A & B | ( r_{AB} = r_A + r_B = \frac{1}{12} + \frac{1}{18} = \frac{5}{36} ) job/hr | Add rates |
| 5. Time to finish remaining work | ( t_{\text{fin}} = \frac{W_{\text{rem}}}{r_{AB}} = \frac{2/3}{5/36} = \frac{2/3 \times 36}{5} = \frac{24}{5} = 4.8 ) hrs | |
| 6. Convert 0.8 hr to minutes | (0.8 \times 60 = 48) min | |
| Result | 4 hours 48 minutes | After A’s 4‑hour solo stint, B (with A) will finish the wall in 4 h 48 min. |
Answer: 4 h 48 min
4. Quick Revision Summary
- Rate: ( r = \frac{1}{T} ) (job per hour).
- Combined rate: sum of individual rates.
- Time together: ( T_{AB} = \frac{1}{\frac{1}{T_A} + \frac{1}{T_B}} ).
- Work in time: ( W = r \times t ).
- Workers needed: ( n = \frac{T_{\text{worker}}}{T_{\text{job}}} ).
- Always use the same units (hours, minutes).
- Check partial work – if a worker stops early, compute remaining job separately.
- Common formulae to memorize
- ( \frac{1}{T_{\text{total}}} = \sum \frac{1}{T_{\text{worker}}} )
- ( \text{Time left} = \frac{\text{Remaining work}}{\text{Combined rate}} )
With these basics and the worked example as a template, you can tackle most “Time & Work” questions in the SI exam. Good luck!