Kerala Police Sub-Inspector (SI) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Quick & Easy Study Notes

(For Kerala Police Sub‑Inspector Quantitative Aptitude)


1. What is “Time & Work”?

  • Work = any job that can be finished (paint a wall, wash dishes, fill a tank).
  • Rate = how fast a person can do the job (e.g., 1/2 wall per day).
  • Time = how long it takes to finish the job.

Analogy
Imagine two friends painting a wall. One paints 1 / 4 of the wall in a day, the other 1 / 6.
Their rates are 0.25 and 0.166… of the wall per day.
If they paint together, they finish 0.416… of the wall each day.


2. Basic Relationship

Work = Rate × Time
  • Rate = Work ÷ Time
  • Time = Work ÷ Rate
  • Work = Rate × Time

Tip – Think of a car:
Speed (rate) × Time = Distance (work).


3. Working Together

  • When people work together, their rates add up.
Rate_total = Rate_A + Rate_B + …
Time_total = Work ÷ Rate_total

Tiny Example

A finishes a job in 10 days → Rate_A = 1/10 of the job per day.
B finishes it in 15 days → Rate_B = 1/15 of the job per day.

Together:

Rate_total = 1/10 + 1/15 = 5/30 + 2/30 = 7/30
Time_total = 1 ÷ (7/30) = 30/7 ≈ 4.29 days

So A & B together finish the job in about 4 days 7 hours.


4. Working Separately

If two people finish a job in a given time but one works more days:

  • Total work is the same for both.
  • Calculate each person’s rate, then find their times.

5. Work Done by One Person

Given total time and another person’s time:

  1. Find the other person’s rate.
  2. Let unknown person’s rate = x.
  3. Set up:
    Rate_total × Total time = 1 (whole job)
    
  4. Solve for x → then find time for the unknown.

6. Rate Changes

If a worker’s speed changes after some time:

  • Split the job into two parts.
  • Use each part’s rate and time separately, then add the times.

7. Quick Practice Problems

# Problem Solution Hint
1 A can paint a wall in 8 days. B can paint the same wall in 12 days. How long will they take together? Add rates 1/8 + 1/12, then take reciprocal.
2 A finishes a job in 5 days. B finishes it in 10 days. If A works alone for 2 days, how many more days will B need to finish the rest? Find B’s rate, work done by A in 2 days, then calculate remaining work for B.
3 Two workers together finish a job in 6 days. If one of them works 2 days alone before joining, how many days will the other take to finish the job alone? Split into 2 days alone + shared time.

Answer Key

  1. 4 days 8 hrs
  2. 5 days
  3. 9 days

8. Quick Tips

  • Convert everything to “per day” before adding rates.
  • Use fractions (1/10, 1/15) – they’re easier to add than decimals.
  • When adding fractions, find a common denominator.
  • Remember: Rate × Time = Work – always keep the unit of work as “1 job” for simplicity.
  • If the problem says “works for 3 days and leaves,” subtract the work done in those 3 days from the whole job.

9. Summary

Concept Formula Everyday Analogy
Rate Rate = 1 ÷ Time Speed of a runner
Time Time = 1 ÷ Rate How long to finish a book
Work Work = Rate × Time Distance = Speed × Time
Together Rate_total = sum of rates Two

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.