Time & Work – Quick & Easy Study Notes
(For Kerala Police Sub‑Inspector Quantitative Aptitude)
1. What is “Time & Work”?
- Work = any job that can be finished (paint a wall, wash dishes, fill a tank).
- Rate = how fast a person can do the job (e.g., 1/2 wall per day).
- Time = how long it takes to finish the job.
Analogy
Imagine two friends painting a wall. One paints 1 / 4 of the wall in a day, the other 1 / 6.
Their rates are 0.25 and 0.166… of the wall per day.
If they paint together, they finish 0.416… of the wall each day.
2. Basic Relationship
Work = Rate × Time
- Rate = Work ÷ Time
- Time = Work ÷ Rate
- Work = Rate × Time
Tip – Think of a car:
Speed (rate) × Time = Distance (work).
3. Working Together
- When people work together, their rates add up.
Rate_total = Rate_A + Rate_B + …
Time_total = Work ÷ Rate_total
Tiny Example
A finishes a job in 10 days → Rate_A = 1/10 of the job per day.
B finishes it in 15 days → Rate_B = 1/15 of the job per day.
Together:
Rate_total = 1/10 + 1/15 = 5/30 + 2/30 = 7/30
Time_total = 1 ÷ (7/30) = 30/7 ≈ 4.29 days
So A & B together finish the job in about 4 days 7 hours.
4. Working Separately
If two people finish a job in a given time but one works more days:
- Total work is the same for both.
- Calculate each person’s rate, then find their times.
5. Work Done by One Person
Given total time and another person’s time:
- Find the other person’s rate.
- Let unknown person’s rate = x.
- Set up:
Rate_total × Total time = 1 (whole job) - Solve for x → then find time for the unknown.
6. Rate Changes
If a worker’s speed changes after some time:
- Split the job into two parts.
- Use each part’s rate and time separately, then add the times.
7. Quick Practice Problems
| # | Problem | Solution Hint |
|---|---|---|
| 1 | A can paint a wall in 8 days. B can paint the same wall in 12 days. How long will they take together? | Add rates 1/8 + 1/12, then take reciprocal. |
| 2 | A finishes a job in 5 days. B finishes it in 10 days. If A works alone for 2 days, how many more days will B need to finish the rest? | Find B’s rate, work done by A in 2 days, then calculate remaining work for B. |
| 3 | Two workers together finish a job in 6 days. If one of them works 2 days alone before joining, how many days will the other take to finish the job alone? | Split into 2 days alone + shared time. |
Answer Key
- 4 days 8 hrs
- 5 days
- 9 days
8. Quick Tips
- Convert everything to “per day” before adding rates.
- Use fractions (1/10, 1/15) – they’re easier to add than decimals.
- When adding fractions, find a common denominator.
- Remember: Rate × Time = Work – always keep the unit of work as “1 job” for simplicity.
- If the problem says “works for 3 days and leaves,” subtract the work done in those 3 days from the whole job.
9. Summary
| Concept | Formula | Everyday Analogy |
|---|---|---|
| Rate | Rate = 1 ÷ Time | Speed of a runner |
| Time | Time = 1 ÷ Rate | How long to finish a book |
| Work | Work = Rate × Time | Distance = Speed × Time |
| Together | Rate_total = sum of rates | Two |