Haryana Police Sub-Inspector (SI) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes · Updated

Time & Work — Haryana Police SI Quantitative Aptitude

1. Simple Explanation

Time and Work problems ask how long a person, machine, or group takes to finish a job.

The main idea is:

Work = Rate of work × Time

If a worker completes a job in (x) days, their rate is:

[ \text{Rate}=\frac{1}{x}\text{ of the job per day} ]

For example, if A finishes a job in 10 days, A completes (\frac{1}{10}) of the job per day. If A and B work together, add their daily rates.


2. Essential Formulas

A. Work done in a given time

[ \text{Work done}=\text{Rate}\times\text{Time} ]

B. If a person finishes a job in (x) days

[ \text{One-day work}=\frac{1}{x} ]

C. Two people working together

If A takes (x) days and B takes (y) days:

[ \text{Combined one-day work}=\frac{1}{x}+\frac{1}{y} ]

Therefore, their time together is:

[ \boxed{\frac{xy}{x+y}\text{ days}} ]

D. Three people working together

If their daily work rates are (\frac1x,\frac1y,\frac1z), then:

[ \text{Combined rate}=\frac1x+\frac1y+\frac1z ]

The time to finish one job is the reciprocal of the combined rate.

E. Work, time, and efficiency

For the same amount of work:

[ \text{Efficiency}\propto\frac{1}{\text{Time}} ]

Thus, if A and B take (a) and (b) days respectively:

[ \text{Efficiency ratio of A:B}=b:a ]

A worker who takes fewer days is more efficient.

F. Men, days, and hours

When all workers have the same efficiency:

[ \text{Work}\propto \text{Number of workers}\times \text{Days}\times \text{Hours per day} ]

For the same work:

[ M_1D_1H_1=M_2D_2H_2 ]

If efficiencies differ, include them:

[ M_1D_1H_1E_1=M_2D_2H_2E_2 ]


3. The LCM Method

Fractions can be avoided by choosing a convenient total amount of work.

Steps

  1. Find the LCM of the given completion times.
  2. Treat that LCM as the total work.
  3. Calculate each person’s daily work.
  4. Add or subtract the rates as required.
  5. Divide the remaining work by the relevant rate to find the time.

Example: A takes 12 days and B takes 18 days. Choose total work as (\operatorname{LCM}(12,18)=36) units.

  • A’s rate (=36/12=3) units per day.
  • B’s rate (=36/18=2) units per day.
  • Together they complete (3+2=5) units per day.

This method is especially useful when there are several workers or when someone joins or leaves partway through.


4. Key Points and Common Question Types

A. Working together

Add the rates of people working in the same direction.

[ \text{Combined rate}=\text{Rate of A}+\text{Rate of B} ]

B. One worker joins or leaves

Calculate the work done during each period separately.

[ \text{Total work}= (\text{rate}_1\times\text{time}_1)+ (\text{rate}_2\times\text{time}_2)+\cdots ]

C. Alternate-day work

Calculate the work done in one complete cycle—for example, two days if workers alternate daily. Then find how many full cycles are needed and handle the remaining work.

D. Wages and payment

When wages are shared according to work:

[ \text{Wage ratio}=\text{Work completed ratio} ]

If two workers work for the same time, their work ratio equals their efficiency ratio.

E. Inlets and outlets

  • An inlet or filling pipe adds work.
  • An outlet or leak reduces work.

If a pipe fills a tank in (x) hours, its rate is (+\frac1x) tank per hour. If an outlet empties it in (y) hours, its rate is (-\frac1y).

F. Avoid a common mistake

Do not add the times taken by workers. Add their rates.

For instance, if A takes 6 days and B takes 3 days, they do not take (6+3=9) days together. Their rates are added:

[ \frac16+\frac13=\frac12 ]

So together they take 2 days.


5. Worked Example

Question: A can complete a job in 12 days and B in 18 days. They work together for 4 days, after which A leaves. How many more days will B need to finish the job?

Method: Use total work in units

[ \operatorname{LCM}(12,18)=36 ]

Take the total work as 36 units.

  • A’s daily work (=36/12=3) units.
  • B’s daily work (=36/18=2) units.
  • Their combined daily work (=3+2=5) units.

In 4 days, they complete:

[ 5\times4=20\text{ units} ]

Remaining work:

[ 36-20=16\text{ units} ]

B alone completes 2 units per day, so the time required is:

[ \frac{16}{2}=8\text{ days} ]

Answer: B needs 8 more days.


6. Quick Revision Summary

  • Work = Rate × Time

  • If a job takes (x) days, the daily rate is (\frac1x) of the job.

  • Working together: add daily rates, not completion times.

  • Two workers taking (x) and (y) days together take:

    [ \frac{xy}{x+y}\text{ days} ]

  • For changing workers or work schedules, calculate the work done in each period and add it.

  • For the same work, efficiency and time are inversely proportional.

  • For equal-efficiency workers:

    [ \text{Work}\propto\text{workers}\times\text{days

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.