Time & Work – Advanced University‑Level Study Notes
Essential for the Haryana Police Sub‑Inspector (SI) Quantitative Aptitude Paper
Goal:
- Understand the fundamental concepts from first principles.
- Build a rigorous, general framework that can be applied to any “time‑and‑work” problem.
- Explore advanced extensions (continuous models, linear algebra, edge cases).
- Practice with challenging problems that mirror exam difficulty.
1. Foundations – Work as a Quantitative Entity
| Symbol | Meaning | Units |
|---|---|---|
| (W) | Total amount of work (job) | units of work (e.g., man‑hours, tasks, bricks) |
| (r) | Rate of a worker or group | units of work per unit time (e.g., tasks/hour) |
| (t) | Time spent doing the work | time (hours, days, minutes) |
| (W_i) | Work done by worker (i) | units of work |
Basic relation (from first principles)
Work is the product of rate and time:
[ W = r,t ]
When multiple workers (or machines) act together, their rates add:
[ r_{\text{total}} = \sum_{i=1}^{n} r_i ]
So the total work done by (n) workers in time (t):
[ W = \left(\sum_{i=1}^{n} r_i\right) t ]
2. Deriving the Time‑and‑Work Formula
Starting from (W = r t) for a single worker, suppose we need to find the time (t) for a group of workers to finish a job (W).
[ t = \frac{W}{\sum_{i=1}^{n} r_i} ]
Example:
If a job takes 40 hours for one worker, that worker’s rate is (r_1 = \frac{1}{40}) jobs/hour.
If a second worker works at (r_2 = \frac{1}{30}) jobs/hour, the combined rate is (\frac{1}{40} + \frac{1}{30} = \frac{7}{120}).
Time to finish (W=1) job:
(t = \frac{1}{7/120} = \frac{120}{7} \approx 17.14) hours.
Important:
- Rates are additive because work is a linear quantity.
- If a worker is half as efficient, his rate is half the original.
3. Advanced Modelling – Work as a Continuous Quantity
3.1 Differential‑Equation Perspective
Let (w(t)) be the remaining work at time (t).
If the combined rate is (R), then
[ \frac{dw}{dt} = -R ]
Integrating:
[ w(t) = W - R t ]
The job finishes when (w(t)=0):
[ t = \frac{W}{R} ]
This viewpoint generalizes to time‑varying rates (R(t)):
[ \frac{dw}{dt} = -R(t), \qquad w(t) = W - \int_0^t R(\tau), d\tau ]
Edge case: If (R(t)) changes abruptly (e.g., a worker leaves), the integral splits into segments.
3.2 Vector Space Interpretation
- Each worker’s rate is a basis vector in the 1‑D space of “rate units”.
- The total rate is a linear combination of basis vectors.
- The linearity of work: if (w = r,t), then (w) is a linear functional of (r).
In more complex scenarios (e.g., workers can work on multiple tasks simultaneously), we can model with higher‑dimensional vectors and matrices.
4. Linear Algebra Approach for Simultaneous Problems
When multiple equations involve several unknown times or rates, it is efficient to use matrices.
4.1 Example System
Let:
- Worker A works alone for (t_A) hours.
- Worker B works alone for (t_B) hours.
- Together they finish the job in (t_T) hours.
Assume rates (r_A, r_B) are unknown. The equations:
[ \begin{cases} r_A t_A = W/2 \quad &\text{(A does half the job)}\[4pt] r_B t_B = W/3 \quad &\text{(B does one‑third)}\[4pt] (r_A + r_B) t_T = W \end{cases} ]
Solve for (t_T) by eliminating (r_A, r_B):
- Express (r_A = \frac{W}{2t_A}), (r_B = \frac{W}{3t_B}).
- Plug into the third equation and solve for (t_T).
In matrix form:
[ \underbrace{\begin{bmatrix} t_A & 0 & 0 \ 0 & t_B & 0 \ t_T & t_T & 0 \end{