📚 Study Notes – Time & Work

Program: Chhattisgarh Forest Guard
Subject: Quantitative Aptitude


1️⃣ Simple Explanation

  • Work = The amount of job that has to be done (e.g., clearing a forest area, planting trees, etc.).
  • Rate of work = How much work one person/vehicle/tractor can finish in a given time (usually expressed as work per day).
  • Time = How long it takes to finish the work at a given rate.

Formulae

Symbol Meaning Formula
(W) Total work (in work‑units) –
(R) Rate of work (work‑units per day) –
(T) Time required (days) (T = \frac{W}{R})
(R_i) Individual rate of person (i) –
(R_{sum}) Combined rate of several persons/units (R_{sum} = R_1 + R_2 + \dots + R_n)
(T_{sum}) Time for a group to finish the job (T_{sum} = \frac{W}{R_{sum}})
(T_1, T_2) Time taken by two persons separately –
(R_{1,2}) Combined rate (R_{1,2} = \frac{1}{T_1} + \frac{1}{T_2}) (if work is same)

Key Idea:
Rate of work = work completed in a unit time.
Time needed = Total work ÷ Rate.


2️⃣ Key Points

# Concept Quick Note
1 Work Units Treat the whole job as 1 unit or 100 units; keep consistent.
2 Rate Conversion If a worker does 1/4 of the work in a day ⇒ rate = 0.25 work‑units/day.
3 Working Together Add individual rates to get combined rate.
4 Working Together & Apart If one works alone for some time, subtract that portion before adding the other’s rate.
5 Opposite Rates When one worker’s rate is k times the other’s, use (R_1 = kR_2).
6 Partial Work Calculate work done in given time, then subtract from total to find remaining work.
7 Common Mistakes • Mixing up time and rate. • Forgetting to convert rates to same unit. • Assuming “time taken” = “time left” incorrectly.
8 Useful Tricks • Use “work per day” instead of “days per work”. • Convert fractional days to hours if needed. • For two persons, if one takes (x) days, the other takes (y) days, the combined time is (\frac{xy}{x+y}).

3️⃣ Worked Example

Problem (Typical Forest Guard Question)

A team of 5 forest guards can clear a forest area in 12 days. If 2 additional guards join the team, how many days will it take to clear the area?

Step‑by‑Step Solution

Step Explanation Calculation
1. Define Total Work Let the entire area = 1 work‑unit. (W = 1)
2. Compute Initial Rate 5 guards finish 1 unit in 12 days ⇒ rate per day: (R_{5} = \frac{1}{12}) work‑units/day
3. Find Rate of One Guard Since all guards are equal, divide by 5. (R_{guard} = \frac{R_{5}}{5} = \frac{1}{12 \times 5} = \frac{1}{60})
4. New Team Size 5 + 2 = 7 guards. –
5. Compute New Combined Rate 7 × (R_{guard}). (R_{7} = 7 \times \frac{1}{60} = \frac{7}{60})
6. Find New Time (T = \frac{W}{R_{7}}). (T = \frac{1}{\frac{7}{60}} = \frac{60}{7} \approx 8.57) days
7. Express Answer 8 days and 0.57 day ≈ 8 days 13.7 hours. ≈ 8.57 days

Answer: About 8.6 days (or 8 days 13½ hours).


4️⃣ Quick Revision Summary

  • Rate = work done per unit time.
  • Time = total work ÷ rate.
  • Combined rate = sum of individual rates.
  • For (n) persons: (T = \frac{W}{n \times \text{(rate of one)}}).
  • If two people take (x) and (y) days separately: Combined days (= \frac{xy}{x + y}).
  • Partial work: Work done = rate × time; remaining = total – done.
  • Check units: keep days, hours, and fraction consistent.
  • Common pitfall: Mixing “time” and “rate”; always verify the direction of the formula.

🏆 Quick Self‑Check Questions

  1. If 3 workers can finish a job in 10 days, how many days will 5 workers take?
  2. A machine does 1/5 of the job in 2 days. How many days to finish the job alone?
  3. Worker A takes 8 days, Worker B takes 12 days. How long together?

Take a minute to solve them before moving on. Good luck with your preparation!