Time & Work – Quick & Easy Study Notes

(For Delhi Forest Guard – Quantitative Aptitude)


1. What is “Time & Work”?

  • Work = any task that takes effort/time to finish.
  • Rate of work = how fast a person/thing can do that task.
  • Time = how long it takes to finish the task.

Analogy:
Think of baking a cake.
Rate = how quickly you can stir the batter.
Time = how long it takes to bake the cake.


2. The Basic Relationship

If a worker does a job at a constant rate, the amount of work done is simply:

Work = Rate × Time

Rearranging gives the most useful forms:

What you need Formula (simple form)
Time to finish a job Time = Work ÷ Rate
Rate of a worker Rate = Work ÷ Time
Amount of work done Work = Rate × Time

All numbers are numbers of “units” – e.g., “1 job”, “1 cake”, “1 tree”.


3. “Units of Work” – Why We Use 1

  • We usually set the total job = 1 unit (100%).
  • If two workers together finish the job in 4 hours, we say 1 unit of work = 4 hours of combined work.

Example
Two people, A and B, finish a tree‑cutting job in 4 hours.
Total work = 1 unit.
Combined rate = 1 unit ÷ 4 h = 0.25 unit/h.


4. “Rate of Work” – Work Done per Hour

  • Rate of A = (Work done by A in 1 hour).
  • If A alone can finish the job in 8 hours → Rate_A = 1 ÷ 8 = 0.125 unit/h.

5. Working Together

If several workers work together, their rates add up.

Rate_total = Rate_A + Rate_B + Rate_C + …
Time_total = Work ÷ Rate_total

Quick rule:
More workers = higher total rate = less time.


6. Working One After Another

If the same job is done by A first, then B, then C, we add the work they each finish.

Work_done = Rate_A × Time_A + Rate_B × Time_B + Rate_C × Time_C

If they finish the whole job, Work_done = 1.
Solve for the unknown time.


7. Common Tricks (No Jargon)

Trick What it means Mini‑Example
“Half the work” If a worker does half the job in X hours, the whole job takes 2 × X hours. A does half a tree in 3 hrs → whole job 6 hrs.
“More than one worker” If A is 3 times faster than B, then Rate_A = 3 × Rate_B. A alone 6 hrs → B alone 18 hrs.
“Work left” If 70% of the job is done, 30% remains. 70% done in 4 hrs → remaining 30%? (use rate).

8. Tiny Worked Example

Problem
A and B together finish a clearing job in 6 hours.
A alone would take 12 hours. Find how long B alone takes.

Solution

  1. Set total work = 1 unit.
  2. Rate of A = 1 ÷ 12 = 0.0833 unit/h.
  3. Rate together = 1 ÷ 6 = 0.1667 unit/h.
  4. Rate of B = Rate together – Rate of A
    = 0.1667 – 0.0833 = 0.0834 unit/h.
  5. Time for B alone = 1 ÷ 0.0834 ≈ 12 hours.

Result: B alone also takes 12 hours.


9. Quick Checklist Before Solving

  1. Identify what is given (times, rates, workers).
  2. Decide which unknown you need (time, rate).
  3. Convert everything to “units of work” (1 job = 1 unit).
  4. Use the basic formulas – add rates for teamwork, multiply rate × time for work.
  5. Solve algebraically; check units (hours, days, etc.).

10. Tips for the Exam

  • Read the question carefully – sometimes it says “after working 2 hours, they finish the rest in X hours”.
  • Draw a quick table of workers, rates, times – helps avoid confusion.
  • Check your answer – if it’s a time, it should be a realistic number (not negative or absurd).
  • Practice with 5–10 different “time & work” questions – the pattern will become clear.

Final Thought

Time & Work is just a simple way of saying “how fast is a person/thing and how long will it take?”. Treat each problem as a small story: Who is working? How fast? How long? Once you set the story straight, the math is just a few quick steps. Happy studying!