Time & Work – Quick & Easy Study Notes
(For Delhi Forest Guard – Quantitative Aptitude)
1. What is “Time & Work”?
- Work = any task that takes effort/time to finish.
- Rate of work = how fast a person/thing can do that task.
- Time = how long it takes to finish the task.
Analogy:
Think of baking a cake.
Rate = how quickly you can stir the batter.
Time = how long it takes to bake the cake.
2. The Basic Relationship
If a worker does a job at a constant rate, the amount of work done is simply:
Work = Rate × Time
Rearranging gives the most useful forms:
| What you need | Formula (simple form) |
|---|---|
| Time to finish a job | Time = Work ÷ Rate |
| Rate of a worker | Rate = Work ÷ Time |
| Amount of work done | Work = Rate × Time |
All numbers are numbers of “units” – e.g., “1 job”, “1 cake”, “1 tree”.
3. “Units of Work” – Why We Use 1
- We usually set the total job = 1 unit (100%).
- If two workers together finish the job in 4 hours, we say 1 unit of work = 4 hours of combined work.
Example
Two people, A and B, finish a tree‑cutting job in 4 hours.
Total work = 1 unit.
Combined rate = 1 unit ÷ 4 h = 0.25 unit/h.
4. “Rate of Work” – Work Done per Hour
- Rate of A = (Work done by A in 1 hour).
- If A alone can finish the job in 8 hours → Rate_A = 1 ÷ 8 = 0.125 unit/h.
5. Working Together
If several workers work together, their rates add up.
Rate_total = Rate_A + Rate_B + Rate_C + …
Time_total = Work ÷ Rate_total
Quick rule:
More workers = higher total rate = less time.
6. Working One After Another
If the same job is done by A first, then B, then C, we add the work they each finish.
Work_done = Rate_A × Time_A + Rate_B × Time_B + Rate_C × Time_C
If they finish the whole job, Work_done = 1.
Solve for the unknown time.
7. Common Tricks (No Jargon)
| Trick | What it means | Mini‑Example |
|---|---|---|
| “Half the work” | If a worker does half the job in X hours, the whole job takes 2 × X hours. |
A does half a tree in 3 hrs → whole job 6 hrs. |
| “More than one worker” | If A is 3 times faster than B, then Rate_A = 3 × Rate_B. |
A alone 6 hrs → B alone 18 hrs. |
| “Work left” | If 70% of the job is done, 30% remains. | 70% done in 4 hrs → remaining 30%? (use rate). |
8. Tiny Worked Example
Problem
A and B together finish a clearing job in 6 hours.
A alone would take 12 hours. Find how long B alone takes.
Solution
- Set total work = 1 unit.
- Rate of A = 1 ÷ 12 = 0.0833 unit/h.
- Rate together = 1 ÷ 6 = 0.1667 unit/h.
- Rate of B = Rate together – Rate of A
= 0.1667 – 0.0833 = 0.0834 unit/h. - Time for B alone = 1 ÷ 0.0834 ≈ 12 hours.
Result: B alone also takes 12 hours.
9. Quick Checklist Before Solving
- Identify what is given (times, rates, workers).
- Decide which unknown you need (time, rate).
- Convert everything to “units of work” (1 job = 1 unit).
- Use the basic formulas – add rates for teamwork, multiply rate × time for work.
- Solve algebraically; check units (hours, days, etc.).
10. Tips for the Exam
- Read the question carefully – sometimes it says “after working 2 hours, they finish the rest in X hours”.
- Draw a quick table of workers, rates, times – helps avoid confusion.
- Check your answer – if it’s a time, it should be a realistic number (not negative or absurd).
- Practice with 5–10 different “time & work” questions – the pattern will become clear.
Final Thought
Time & Work is just a simple way of saying “how fast is a person/thing and how long will it take?”. Treat each problem as a small story: Who is working? How fast? How long? Once you set the story straight, the math is just a few quick steps. Happy studying!