📚 Time & Work – Study Notes
For IIT‑JEE & other competitive exams (Quantitative Aptitude)
Key Idea – Treat “work” like distance and “rate of work” like speed.
Use consistent units (e.g., work units per hour, workers per day).
1. Basic Definitions
| Symbol | Meaning | Unit |
|---|---|---|
| (W) | Total amount of work | Work units |
| (R) | Rate of work of a worker/machine | Work units / hour |
| (T) | Time taken | Hours / days |
| (P) | Productivity (inverse of rate) | Hours / work unit |
Fundamental Relation
[ W = R \times T \qquad\text{(1)} ]
or equivalently
[ T = \frac{W}{R} \qquad\text{(2)} ]
2. Combined Work (Multiple Workers)
If workers (A) and (B) work together, their combined rate is the sum of individual rates:
[ R_{\text{tot}} = R_A + R_B \qquad\text{(3)} ]
Hence the time required for a job of (W) units:
[ T_{\text{tot}} = \frac{W}{R_A + R_B} \qquad\text{(4)} ]
Tip: Always express the rate in the same unit (e.g., per hour).
3. Work Done by One Worker After Another
If worker (A) works for (t_A) hours and then worker (B) works for (t_B) hours:
[ W = R_A t_A + R_B t_B \qquad\text{(5)} ]
Often the problem gives total time and difference in work done, so you’ll set up two equations.
4. Work Done When One Worker Starts Earlier
Let worker (A) start alone for (t) hours, then worker (B) joins and they work together for (u) hours to finish the job.
[ W = R_A t + (R_A + R_B) u \qquad\text{(6)} ]
5. Work Done by Machines & Efficiency
For machines, the efficiency (\eta) (0 < (\eta) ≤ 1) modifies the rate:
[ R_{\text{effective}} = \eta \times R_{\text{ideal}} \qquad\text{(7)} ]
6. Common Tricky Points
| # | Situation | Why It’s Tricky | How to Avoid |
|---|---|---|---|
| 1 | “Same time, different work” | Intuition may lead to thinking they work at same rate. | Use (1) to compute each rate separately. |
| 2 | Work per day vs per hour | Mixing units gives wrong answer. | Convert all times to a common unit (e.g., hours). |
| 3 | “One worker can finish in 3 days; another in 5 days” | Misinterpreting time as rate. | Compute rates: (R_1 = \frac{1}{3}), (R_2 = \frac{1}{5}) (work units per day). |
| 4 | “Worker A is 30 % faster than B” | Need to translate into ratio of rates. | If (R_B = r), then (R_A = 1.3,r). |
| 5 | “Work done after a break” | Break time not counted in (T). | Only count actual work time. |
7. Useful Derivations
7.1 Deriving Combined Rate (Equation 3)
Assume worker (A) does (W_A = R_A T_A) and worker (B) does (W_B = R_B T_B).
If both work simultaneously for a common time (T):
[ \begin{aligned} W_{\text{total}} &= W_A + W_B \ &= R_A T + R_B T \ &= (R_A + R_B)T \end{aligned} ]
Thus (R_{\text{tot}} = R_A + R_B).
7.2 Work Done by One Worker Alone for Part of the Job
Let worker (A) finish the job in (T_A) hours alone.
If (B) works for (T_B) hours after (A) has worked (t) hours:
[ \begin{aligned} W &= R_A t + R_B (T_B - t) \ &= \frac{W}{T_A} t + \frac{W}{T_B} (T_B - t) \end{aligned} ]
Solve for (t) or (T_B) as required.
8. Practice Question (Hard)
Question
A machine can paint a wall in 6 hours. Its efficiency is 80 %.
Two workers, (X) and (Y), can paint the same wall in 12 hours and 18 hours respectively.
The wall is to be painted in 4 hours.
Task: Determine the minimum fraction of the wall that must be painted by the machine while the workers work together (i.e., the machine works in parallel with the workers). The remaining part must be done by the workers only.
Assume workers cannot work before the machine starts, but