Time & Work – Quantitative Aptitude
(Prepared for the Manipur Police Constable Examination – IIT‑JEE style)
Objective of this chapter
- Master the fundamentals of rate of work and time–work relationships.
- Develop a systematic approach to solve any “time & work” problem, including tricky variations.
- Memorize the most useful formulas and pitfalls that frequently appear in competitive exams.
1. Fundamental Concepts
| Symbol | Meaning | Units | Example |
|---|---|---|---|
| (R) | Work‑rate of a worker | work units per hour | If A completes a job in 5 h → (R_A = \frac{1}{5}) |
| (T) | Time taken | hours | (T_A = 5) |
| (W) | Total amount of work | work units | (W = 1) (often we take the job as “1 unit”) |
Key Insight
Work, rate, and time are inversely proportional:
[ R \times T = W \quad\Longleftrightarrow\quad T = \frac{W}{R} ]
2. Work‑Rate Formulae
| Situation | Formula | Explanation |
|---|---|---|
| One worker | (R = \dfrac{W}{T}) | Rate is total work divided by time taken. |
| Two workers working together | (R_{\text{combined}} = R_1 + R_2) | Rates add because work is cumulative. |
| (n) workers | (R_{\text{combined}} = \sum_{i=1}^n R_i) | Generalization of the two‑worker case. |
| Different rates, same work | (W = R_1 T_1 = R_2 T_2) | Each worker’s rate times his time equals the job size. |
| Work done in a given time | (W_{\text{done}} = R \times T_{\text{given}}) | Straightforward multiplication. |
| Remaining work | (W_{\text{remaining}} = W - W_{\text{done}}) | Subtract work already done from total. |
Why “1 unit” is convenient
Setting (W = 1) lets you focus solely on rates and times.
Example: A completes a job in 4 h → (R_A = \frac{1}{4}) work units/h.
3. Derivations & Intuition
3.1 Single Worker
If a worker finishes a job in (T) hours, then in one hour he completes (\frac{1}{T}) of the job.
Hence (R = \frac{1}{T}).
3.2 Two Workers
Let worker (A) finish the job in (T_A) hours, worker (B) in (T_B) hours.
Their individual rates: (R_A = \frac{1}{T_A}), (R_B = \frac{1}{T_B}).
When they work together for (t) hours, total work done:
[ W_{\text{done}} = \left(\frac{1}{T_A} + \frac{1}{T_B}\right) t ]
Set (W_{\text{done}} = 1) (complete job) →
[ t = \frac{1}{\dfrac{1}{T_A} + \dfrac{1}{T_B}} = \frac{T_A T_B}{T_A + T_B} ]
This is the classic “time taken by two workers together” formula.
3.3 Multiple Workers
The same idea extends:
[ t = \frac{W}{R_{\text{combined}}} = \frac{1}{\sum_{i=1}^n \frac{1}{T_i}} ]
4. Common Variations
| Variation | How to Handle |
|---|---|
| Unequal Workloads | Treat each worker’s work as a fraction of the total. |
| Day–Night Work | Separate rates for day and night: (R_{\text{day}}), (R_{\text{night}}). |
| Partial Work | Work done before a change: compute (W_{\text{done}}), then remaining. |
| Work in Fractional Hours | Keep time in hours (e.g., 1 h 30 min = 1.5 h). |
| Work Done by Multiple Workers in Different Intervals | Break the timeline into segments, compute work per segment, sum up. |
| Work Done by One Worker after Another Leaves | Use “remaining work” and the rate of the remaining worker. |
| Work with “Same Work, Different Rates” | Use (R_1 T_1 = R_2 T_2). |
| Work with “Different Work, Same Rate” | Work is proportional to time. |
5. Important Formulae (Exam Cheat‑Sheet)
| Scenario | Formula | Notes |
|---|---|---|
| Work done by (n) workers in (t) hours | (W = t \sum_{i=1}^n R_i) | Rates add. |
| Time taken by (n) workers together | (t = \dfrac{1}{\sum_{i=1}^n R_i}) | When (W=1). |
| Time taken by one worker | (t = \dfrac{1}{R}) | Rate is inverse of time. |
| Work done by worker A in (t) hours | (W_A = R_A t) | |
| Work done by worker |