Manipur Police Constable /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Quantitative Aptitude

(Prepared for the Manipur Police Constable Examination – IIT‑JEE style)

Objective of this chapter

  1. Master the fundamentals of rate of work and time–work relationships.
  2. Develop a systematic approach to solve any “time & work” problem, including tricky variations.
  3. Memorize the most useful formulas and pitfalls that frequently appear in competitive exams.

1. Fundamental Concepts

Symbol Meaning Units Example
(R) Work‑rate of a worker work units per hour If A completes a job in 5 h → (R_A = \frac{1}{5})
(T) Time taken hours (T_A = 5)
(W) Total amount of work work units (W = 1) (often we take the job as “1 unit”)

Key Insight
Work, rate, and time are inversely proportional:
[ R \times T = W \quad\Longleftrightarrow\quad T = \frac{W}{R} ]


2. Work‑Rate Formulae

Situation Formula Explanation
One worker (R = \dfrac{W}{T}) Rate is total work divided by time taken.
Two workers working together (R_{\text{combined}} = R_1 + R_2) Rates add because work is cumulative.
(n) workers (R_{\text{combined}} = \sum_{i=1}^n R_i) Generalization of the two‑worker case.
Different rates, same work (W = R_1 T_1 = R_2 T_2) Each worker’s rate times his time equals the job size.
Work done in a given time (W_{\text{done}} = R \times T_{\text{given}}) Straightforward multiplication.
Remaining work (W_{\text{remaining}} = W - W_{\text{done}}) Subtract work already done from total.

Why “1 unit” is convenient
Setting (W = 1) lets you focus solely on rates and times.
Example: A completes a job in 4 h → (R_A = \frac{1}{4}) work units/h.


3. Derivations & Intuition

3.1 Single Worker

If a worker finishes a job in (T) hours, then in one hour he completes (\frac{1}{T}) of the job.
Hence (R = \frac{1}{T}).

3.2 Two Workers

Let worker (A) finish the job in (T_A) hours, worker (B) in (T_B) hours.
Their individual rates: (R_A = \frac{1}{T_A}), (R_B = \frac{1}{T_B}).
When they work together for (t) hours, total work done:

[ W_{\text{done}} = \left(\frac{1}{T_A} + \frac{1}{T_B}\right) t ]

Set (W_{\text{done}} = 1) (complete job) →

[ t = \frac{1}{\dfrac{1}{T_A} + \dfrac{1}{T_B}} = \frac{T_A T_B}{T_A + T_B} ]

This is the classic “time taken by two workers together” formula.

3.3 Multiple Workers

The same idea extends:

[ t = \frac{W}{R_{\text{combined}}} = \frac{1}{\sum_{i=1}^n \frac{1}{T_i}} ]


4. Common Variations

Variation How to Handle
Unequal Workloads Treat each worker’s work as a fraction of the total.
Day–Night Work Separate rates for day and night: (R_{\text{day}}), (R_{\text{night}}).
Partial Work Work done before a change: compute (W_{\text{done}}), then remaining.
Work in Fractional Hours Keep time in hours (e.g., 1 h 30 min = 1.5 h).
Work Done by Multiple Workers in Different Intervals Break the timeline into segments, compute work per segment, sum up.
Work Done by One Worker after Another Leaves Use “remaining work” and the rate of the remaining worker.
Work with “Same Work, Different Rates” Use (R_1 T_1 = R_2 T_2).
Work with “Different Work, Same Rate” Work is proportional to time.

5. Important Formulae (Exam Cheat‑Sheet)

Scenario Formula Notes
Work done by (n) workers in (t) hours (W = t \sum_{i=1}^n R_i) Rates add.
Time taken by (n) workers together (t = \dfrac{1}{\sum_{i=1}^n R_i}) When (W=1).
Time taken by one worker (t = \dfrac{1}{R}) Rate is inverse of time.
Work done by worker A in (t) hours (W_A = R_A t)
Work done by worker

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.