Manipur Police Constable /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Advanced Quantitative Aptitude Study Notes

(MIT‑level, first‑principles derivations, edge cases, and a challenging problem)

Audience – University students, competitive‑exam aspirants, and anyone who wants a rigorous understanding of the “time‑and‑work” framework.
Prerequisites – Basic algebra, calculus (definite integrals), and linear algebra (optional).


Table of Contents

  1. Foundations
    1.1. Work as a quantity
    1.2. Rate of work
  2. Linear Work Models
    2.1. Constant‑rate workers
    2.2. Combined work: The “superposition principle”
    2.3. Work–time equations
  3. Variable‑Rate Workers
    3.1. Piecewise constant rates
    3.2. Continuous rate functions
    3.3. Integrals and the “rate‑as‑area” principle
  4. Edge Cases & Pathological Situations
    4.1. Zero workers, infinite workers, negative rates
    4.2. Non‑linear work (e.g., diminishing returns)
    4.3. Time‑dependent work capacity
  5. Optimization & Advanced Topics
    5.1. Minimizing time with constraints
    5.2. Linear programming formulation
    5.3. Probabilistic work models
  6. Challenging Problem
    6.1. Problem statement
    6.2. Step‑by‑step solution
    6.3. Discussion & extensions

1. Foundations <a name="1-foundations"></a>

1.1. Work as a quantity

In the classic “time‑and‑work” problems, work is a scalar quantity that is additive and time‑independent.

  • Let (W) denote the total amount of work required to complete a task.
  • (W) is measured in units such as “person‑days”, “man‑hours”, or any arbitrary unit.

Why additivity?
If worker (A) completes work (W_1) and worker (B) completes work (W_2), then together they have completed (W_1 + W_2). This property is essential for linear superposition.

1.2. Rate of work

Define the rate (or speed) of a worker (i) as

[ r_i = \frac{W_i}{t_i}, ]

where (W_i) is the amount of work done by worker (i) in time (t_i).
Units: e.g., if (W_i) is measured in tasks, then (r_i) has units tasks per hour.

  • Constant‑rate worker: (r_i) is independent of time.
  • Variable‑rate worker: (r_i(t)) is a function of time.

2. Linear Work Models <a name="2-linear-work-models"></a>

2.1. Constant‑rate workers

For a worker with constant rate (r):

[ W = r , t \quad \Longrightarrow \quad t = \frac{W}{r}. ]

This simple linear relationship underpins all classic problems.

2.2. Combined work: The “superposition principle”

If (n) workers act simultaneously, each with constant rates (r_1, r_2, \dots, r_n), then their combined rate is

[ R_{\text{tot}} = \sum_{i=1}^{n} r_i. ]

Derivation
Let each worker (i) work for the same time (t). The total work done is

[ W_{\text{tot}} = \sum_{i=1}^{n} r_i t = \left(\sum_{i=1}^{n} r_i\right)t. ]

Since additivity holds, we can treat the group as a single worker with rate (R_{\text{tot}}).

2.3. Work–time equations

Scenario Equation Interpretation
Single worker (t = W/r) Time to finish alone
Two workers, different rates (t = W/(r_1 + r_2)) Time to finish together
One worker leaves after (t_1) hours, another continues alone (t_{\text{total}} = t_1 + (W - r_1 t_1)/r_2) Piecewise linear schedule
One worker works first, then all continue (t_{\text{total}} = t_1 + (W - r_1 t_1)/(r_1 + r_{\text{others}})) Generalization

3. Variable‑Rate Workers <a name="3-variable-rate-workers"></a>

3.1. Piecewise constant rates

Often a worker’s efficiency changes after a fixed time (e.g., fatigue). Suppose worker (A) works at rate (r_1) for the first (t_1) hours, then at (r_2) thereafter.

The total work completed after (t) hours is

[ W(t) = \begin{cases} r_1 t, & 0 \le t \le t_1,\[4pt] r_1 t_1 + r_2 (t -

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.