- Foundations
1.1. Work as a quantity
1.2. Rate of work - Linear Work Models
2.1. Constant‑rate workers
2.2. Combined work: The “superposition principle”
2.3. Work–time equations - Variable‑Rate Workers
3.1. Piecewise constant rates
3.2. Continuous rate functions
3.3. Integrals and the “rate‑as‑area” principle - Edge Cases & Pathological Situations
4.1. Zero workers, infinite workers, negative rates
4.2. Non‑linear work (e.g., diminishing returns)
4.3. Time‑dependent work capacity - Optimization & Advanced Topics
5.1. Minimizing time with constraints
5.2. Linear programming formulation
5.3. Probabilistic work models - Challenging Problem
6.1. Problem statement
6.2. Step‑by‑step solution
6.3. Discussion & extensions
1. Foundations <a name="1-foundations"></a>
1.1. Work as a quantity
In the classic “time‑and‑work” problems, work is a scalar quantity that is additive and time‑independent.
- Let (W) denote the total amount of work required to complete a task.
- (W) is measured in units such as “person‑days”, “man‑hours”, or any arbitrary unit.
Why additivity?
If worker (A) completes work (W_1) and worker (B) completes work (W_2), then together they have completed (W_1 + W_2). This property is essential for linear superposition.
1.2. Rate of work
Define the rate (or speed) of a worker (i) as
[ r_i = \frac{W_i}{t_i}, ]
where (W_i) is the amount of work done by worker (i) in time (t_i).
Units: e.g., if (W_i) is measured in tasks, then (r_i) has units tasks per hour.
- Constant‑rate worker: (r_i) is independent of time.
- Variable‑rate worker: (r_i(t)) is a function of time.
2. Linear Work Models <a name="2-linear-work-models"></a>
2.1. Constant‑rate workers
For a worker with constant rate (r):
[ W = r , t \quad \Longrightarrow \quad t = \frac{W}{r}. ]
This simple linear relationship underpins all classic problems.
2.2. Combined work: The “superposition principle”
If (n) workers act simultaneously, each with constant rates (r_1, r_2, \dots, r_n), then their combined rate is
[ R_{\text{tot}} = \sum_{i=1}^{n} r_i. ]
Derivation
Let each worker (i) work for the same time (t). The total work done is
[ W_{\text{tot}} = \sum_{i=1}^{n} r_i t = \left(\sum_{i=1}^{n} r_i\right)t. ]
Since additivity holds, we can treat the group as a single worker with rate (R_{\text{tot}}).
2.3. Work–time equations
| Scenario | Equation | Interpretation |
|---|---|---|
| Single worker | (t = W/r) | Time to finish alone |
| Two workers, different rates | (t = W/(r_1 + r_2)) | Time to finish together |
| One worker leaves after (t_1) hours, another continues alone | (t_{\text{total}} = t_1 + (W - r_1 t_1)/r_2) | Piecewise linear schedule |
| One worker works first, then all continue | (t_{\text{total}} = t_1 + (W - r_1 t_1)/(r_1 + r_{\text{others}})) | Generalization |
3. Variable‑Rate Workers <a name="3-variable-rate-workers"></a>
3.1. Piecewise constant rates
Often a worker’s efficiency changes after a fixed time (e.g., fatigue). Suppose worker (A) works at rate (r_1) for the first (t_1) hours, then at (r_2) thereafter.
The total work completed after (t) hours is
[ W(t) = \begin{cases} r_1 t, & 0 \le t \le t_1,\[4pt] r_1 t_1 + r_2 (t -