Puducherry Police Sub-Inspector (SI) /Quantitative Aptitude

Time & work

Commercial Maths · free study notes

Time & Work – Quick & Easy Study Notes

For the Puducherry Police Sub‑Inspector (SI) Quantitative Aptitude Test

Goal: Learn how to calculate “time”, “work” and “rate” without heavy math or jargon.
Tip: Think of work as an amount of job that can be divided among people or machines.


1. What is “Time & Work”?

Concept Everyday Analogy Simple Definition
Work Painting a wall The total amount of job that has to be finished (e.g., 1 wall).
Rate How fast a painter can paint The part of the job that a person can finish in a unit of time (e.g., 1/4 wall per hour).
Time How long it takes to finish the job The period needed to complete the whole work.

Remember:
Work = Rate × Time
(If you paint faster or take more time, the product stays the same.)


2. How to Work With Rates

2.1 Rate of One Person

If Person A finishes the whole job in 8 hours, his rate is

Rate_A = 1 job / 8 hours = 1/8 of the job per hour

2.2 Combined Rate

When two people work together, their rates add up.

Rate_A + Rate_B = combined rate

Example:
Person A: 1/8 job per hour
Person B: 1/12 job per hour
Combined rate = 1/8 + 1/12 = 5/24 job per hour.


3. Calculating Time

If you know the combined rate and the job size (always 1 job for a single task):

Time = 1 job / Combined rate

Using the example above:
Time = 1 / (5/24) = 24/5 ≈ 4.8 hours (4 hours 48 minutes).


4. Common Question Types

Type What you need to find Key idea
1. Two people start together and finish the job Time Add rates, divide 1 by the sum.
2. One person starts, another joins later Time Split the job: part done by first person, remaining by both.
3. One person is X% faster or slower Rate Convert percentage into a fraction of the other rate.
4. Find how many people are needed People Work = Rate × Time → solve for number of people.

5. Step‑by‑Step Approach

  1. Read the problem carefully – identify who does the work, when, and how much.
  2. Translate into rates – write each person’s rate as a fraction of the whole job per hour.
  3. Add or subtract rates – depending on who works together or separately.
  4. Use Time = 1 / Rate – that gives you the required time.
  5. Check the answer – ensure units (hours, minutes) are correct.

6. Tiny Example (All Steps)

Problem

  • Worker A can finish a road in 6 days.
  • Worker B can finish the same road in 9 days.
  • They start together. How many days will it take them to finish the road?

Solution

Step Calculation Comment
1 Rate_A = 1/6 job per day A finishes 1/6 of the road each day
2 Rate_B = 1/9 job per day B finishes 1/9 of the road each day
3 Combined rate = 1/6 + 1/9 = 5/18 job per day Add the two rates
4 Time = 1 / (5/18) = 18/5 = 3.6 days 3 days 14.4 minutes (≈3 days 14 min)

Answer: They finish the road in about 3.6 days.


7. Quick Practice Problems

# Problem Answer
1 A can paint a wall in 5 hours. B can paint the same wall in 8 hours. Together, how long? 1 / (1/5 + 1/8) = 1 / (13/40) = 40/13 ≈ 3.08 hrs
2 A starts a task and works alone for 3 hours. B joins and together they finish the work in 5 more hours. If B alone would take 20 hours, how long did A work alone? 3 hours (given)
3 Three people A, B, C finish a job in 12 hours. If A alone would take 18 hours, find B and C together’s time. Combined rate of B+C = 1/12 – 1/18 = 1/36 → 36 hours for B+C
4 A can do a job in 10 days. B is 30% slower. How many days will B take? B’s rate = (1 – 0.30) × (1/10) = 0.7/10 → Time = 1 / (0.07) = 14.29 days

Try solving them before looking at the answers.


8.

Your note

Page 1