Time & Work – Study Notes

Program: Chandigarh Police Sub‑Inspector (SI)
Subject: Quantitative Aptitude
Topic: Time & Work

Objective – Understand the fundamental concepts of the time‑work relationship, solve typical problems efficiently, and prepare for exam‑style questions.


1. Simple Explanation

  • Work is the total amount of job that has to be completed.
  • Rate of work is the amount of work done per unit time.
  • If a person or a machine can finish a job in t hours, his/her rate = 1/t job per hour.
  • Combined rate – when two or more workers/machines work together, their rates add up.
  • Time required to finish a job when working together = (Total work) ÷ (Combined rate).

Example:
If A can finish a job in 5 hrs (rate = 1/5 job/hr) and B in 10 hrs (rate = 1/10 job/hr), together they finish 1/5 + 1/10 = 3/10 job/hr → 10/3 ≈ 3.33 hrs.


2. Key Points & Formulas

Symbol Meaning Common Notation Formula
W Total work (jobs) 1 job –
r Rate of a worker job/hr r = 1/t (if t is time to finish 1 job)
t Time taken by a worker hrs t = 1/r
T Time taken by n workers together hrs T = W / (Σ rᵢ)
n Number of workers – –
R Combined rate job/hr R = Σ rᵢ
Work Done Portion completed fraction W_done = (Rate × Time)
Work Remaining Portion left fraction W_remain = W - W_done

Common Problem Types

  1. Individual speeds – find how long each takes alone.
  2. Combined speed – find total time when working together.
  3. Work left after some time – find remaining work or time to finish.
  4. Work done by one after another – sequential work.
  5. Work done with a new worker added/removed – change in combined rate.
  6. Work with varying rates – e.g., one worker works for part of time, another takes over.

3. Worked Example

Problem (exam‑style):

A and B can complete a road construction in 5 days and 8 days respectively. After working together for 2 days, B leaves. How many more days will A need to finish the remaining work?

Step‑by‑Step Solution

  1. Determine individual rates

    • A’s rate = 1 job / 5 days = 0.20 job/day
    • B’s rate = 1 job / 8 days = 0.125 job/day
  2. Combined rate (A + B)

    • R₁ = 0.20 + 0.125 = 0.325 job/day
  3. Work done together in 2 days

    • W_done = R₁ × 2 = 0.325 × 2 = 0.65 job
  4. Work remaining

    • W_remain = 1 – 0.65 = 0.35 job
  5. Time for A alone to finish remaining work

    • t_remaining = W_remain / A’s rate
    • t_remaining = 0.35 / 0.20 = 1.75 days

Answer

A will need 1.75 days (i.e., 1 day and 18 hours) after B leaves to finish the job.

Key Insight:
Work is additive; rates add when working together. Always convert to a common unit (jobs per day) before adding rates.


4. Quick Revision Summary

Concept Formula Quick Tip
Rate of a worker ( r = \frac{1}{t} ) Think “job per hour/day”
Combined rate ( R = \sum r_i ) Add all workers’ rates
Time for combined work ( T = \frac{W}{R} ) (W) is usually 1 job
Work done in time ( W_{\text{done}} = R \times t ) Multiply rate by time
Work remaining ( W_{\text{rem}} = W - W_{\text{done}} ) Subtract completed part
Sequential work ( W_{\text{total}} = \sum (r_i \times t_i) ) Sum each portion
Changing workforce Re‑calculate ( R ) after each change Re‑compute combined rate

Exam Strategy

  • Read carefully – identify who works when and for how long.
  • Draw a table of rates and times if multiple workers.
  • Convert all times to the same unit (hours or days).
  • Check units – always keep “job” as the base unit.
  • Round only at the end – keep fractions until the final answer.

Good Luck!
Practice 5–10 problems per day using these steps, and you’ll master the Time & Work section.