Railway (RRB) /Mathematics

Time & Work

Time & Work · free study notes

Time & Work – Simple Study Notes

(For RRB Railway Mathematics, beginner level)


1. What is “Time & Work”?

  • Work – any task that needs to be finished (painting a wall, cleaning a house, etc.).
  • Time – how long it takes to finish that task.
  • Work rate – how fast a person (or a pair of people) can finish the task.
    • Think of it as how many parts of the task are finished in one minute.

Analogy
Imagine you and a friend are washing dishes.
If you finish 10 plates in 5 minutes, your “rate” is 10 plates ÷ 5 min = 2 plates per minute.
If your friend finishes 6 plates in the same 5 minutes, their rate is 1.2 plates per minute.


2. Basic Idea

Symbol What it means Example
W Total work (the whole task) 1 whole wall
R Rate of a worker (part of the wall per hour) 0.1 wall/hour
T Time needed 10 hours

The relationship is always

W = R × T

or

T = W ÷ R

Think of it like a recipe:
If a recipe needs 2 cups of sugar (W) and you add 0.5 cups every minute (R), you’ll finish in 4 minutes (T).


3. Work Rate (Rate = Work ÷ Time)

  • Rate = How much of the task one person can finish in one hour (or any chosen time unit).

    R = W ÷ T
    
  • If two people work together, their rates add.

    Rtotal = R1 + R2
    

    Example:

    • Person A paints 0.2 wall/hour.
    • Person B paints 0.1 wall/hour.
    • Together: 0.3 wall/hour.

4. Combined Work (Two or More Workers)

  1. Find each rate.
  2. Add the rates.
  3. Divide the total work by the combined rate.

Tiny Example

Problem
A can paint a wall in 4 hours. B can paint the same wall in 6 hours. How long do they take together?

Person Time (hours) Rate (wall/hour)
A 4 1/4 = 0.25
B 6 1/6 ≈ 0.167

Combined rate = 0.25 + 0.167 = 0.417 wall/hour

Time together = 1 wall ÷ 0.417 ≈ 2.4 hours


5. Work Done (Partial Work)

  • If a worker is given a fraction of the job, the time will change proportionally.

Tiny Example

Problem
A can paint a wall in 8 hours. How long will it take to paint half the wall?

Half the wall = 0.5 wall

Time = 0.5 ÷ (1/8) = 0.5 × 8 = 4 hours


6. Reducing Work (Saving Time)

Sometimes the problem says “how much time will be saved if X works with Y?”

Step‑by‑step

  1. Find the time each worker needs alone.
  2. Find the time they need together.
  3. Subtract the together‑time from the biggest individual time.

Tiny Example

Problem
A can finish a job in 5 days, B in 8 days. If they work together, how many days are saved compared to A alone?

  • A alone: 5 days
  • Together: 1 ÷ (1/5 + 1/8) = 1 ÷ (0.2 + 0.125) = 1 ÷ 0.325 ≈ 3.08 days
  • Saved = 5 – 3.08 = 1.92 days

7. Common Quick‑Fixes

Situation Formula Quick Idea
Work done by one worker in t hours Work = Rate × t Multiply rate by time
Time needed by one worker t = Work ÷ Rate Divide total work by rate
Combined rate of n workers Rtotal = R1 + R2 + … + Rn Add each worker’s rate
Time for n workers t = Work ÷ Rtotal Divide work by combined rate

8. Practice Problems (Try before reading the solutions!)

  1. A can complete a task in 9 hours. B can complete the same task in 12 hours.
    a. How long will they take together?
    b. How much time is saved compared to A alone?

  2. C works alone and finishes a job in 10 days. D is 20% faster than C.
    How many days will C and D together finish the job?

  3. A machine can produce 200 units in 5 hours.
    a. What is its rate per hour?
    b. If a second identical machine starts 1 hour later, how many units will be produced after 5 hours?

  4. E and F together can paint a wall in 4 hours.
    E alone can paint the same wall in 6 hours.
    How long does F alone take?


9. Quick Solutions

    • Rates: A = 1/9, B = 1/

Your note

Page 1

Doubt hai is topic me?

Free AI teacher se poocho — 24/7, step by step.