Time & Work – Simple Study Notes
(For RRB Railway Mathematics, beginner level)
1. What is “Time & Work”?
- Work – any task that needs to be finished (painting a wall, cleaning a house, etc.).
- Time – how long it takes to finish that task.
- Work rate – how fast a person (or a pair of people) can finish the task.
- Think of it as how many parts of the task are finished in one minute.
Analogy
Imagine you and a friend are washing dishes.
If you finish 10 plates in 5 minutes, your “rate” is 10 plates ÷ 5 min = 2 plates per minute.
If your friend finishes 6 plates in the same 5 minutes, their rate is 1.2 plates per minute.
2. Basic Idea
| Symbol | What it means | Example |
|---|---|---|
| W | Total work (the whole task) | 1 whole wall |
| R | Rate of a worker (part of the wall per hour) | 0.1 wall/hour |
| T | Time needed | 10 hours |
The relationship is always
W = R × T
or
T = W ÷ R
Think of it like a recipe:
If a recipe needs 2 cups of sugar (W) and you add 0.5 cups every minute (R), you’ll finish in 4 minutes (T).
3. Work Rate (Rate = Work ÷ Time)
-
Rate = How much of the task one person can finish in one hour (or any chosen time unit).
R = W ÷ T -
If two people work together, their rates add.
Rtotal = R1 + R2Example:
- Person A paints 0.2 wall/hour.
- Person B paints 0.1 wall/hour.
- Together: 0.3 wall/hour.
4. Combined Work (Two or More Workers)
- Find each rate.
- Add the rates.
- Divide the total work by the combined rate.
Tiny Example
Problem
A can paint a wall in 4 hours. B can paint the same wall in 6 hours. How long do they take together?
| Person | Time (hours) | Rate (wall/hour) |
|---|---|---|
| A | 4 | 1/4 = 0.25 |
| B | 6 | 1/6 ≈ 0.167 |
Combined rate = 0.25 + 0.167 = 0.417 wall/hour
Time together = 1 wall ÷ 0.417 ≈ 2.4 hours
5. Work Done (Partial Work)
- If a worker is given a fraction of the job, the time will change proportionally.
Tiny Example
Problem
A can paint a wall in 8 hours. How long will it take to paint half the wall?
Half the wall = 0.5 wall
Time = 0.5 ÷ (1/8) = 0.5 × 8 = 4 hours
6. Reducing Work (Saving Time)
Sometimes the problem says “how much time will be saved if X works with Y?”
Step‑by‑step
- Find the time each worker needs alone.
- Find the time they need together.
- Subtract the together‑time from the biggest individual time.
Tiny Example
Problem
A can finish a job in 5 days, B in 8 days. If they work together, how many days are saved compared to A alone?
- A alone: 5 days
- Together: 1 ÷ (1/5 + 1/8) = 1 ÷ (0.2 + 0.125) = 1 ÷ 0.325 ≈ 3.08 days
- Saved = 5 – 3.08 = 1.92 days
7. Common Quick‑Fixes
| Situation | Formula | Quick Idea |
|---|---|---|
| Work done by one worker in t hours | Work = Rate × t |
Multiply rate by time |
| Time needed by one worker | t = Work ÷ Rate |
Divide total work by rate |
| Combined rate of n workers | Rtotal = R1 + R2 + … + Rn |
Add each worker’s rate |
| Time for n workers | t = Work ÷ Rtotal |
Divide work by combined rate |
8. Practice Problems (Try before reading the solutions!)
-
A can complete a task in 9 hours. B can complete the same task in 12 hours.
a. How long will they take together?
b. How much time is saved compared to A alone? -
C works alone and finishes a job in 10 days. D is 20% faster than C.
How many days will C and D together finish the job? -
A machine can produce 200 units in 5 hours.
a. What is its rate per hour?
b. If a second identical machine starts 1 hour later, how many units will be produced after 5 hours? -
E and F together can paint a wall in 4 hours.
E alone can paint the same wall in 6 hours.
How long does F alone take?
9. Quick Solutions
-
- Rates: A = 1/9, B = 1/